Final BULRIC model for fixed and

mobile networks

Final results

Summary of results

(2)

14895-163a

Copyright © 2010. Analysys Mason Limited has

produced the information contained herein for OPTA.

The ownership, use and disclosure of this information are

(3)

3

14895-163a

Plus BULRAIC and Pure BULRIC

results for fixed and mobile

0.0000 0.0050 0.0100 0.0150 0.0200 0.0250 0.0300

Cost per terminated minute, EUR

Plus BULRAIC 0.0246 0.0236 0.0227 0.0221 0.0217 Pure BULRIC 0.0130 0.0124 0.0119 0.0116 0.0114 NOMINAL plus BULRAIC 0.0246 0.0240 0.0237 0.0235 0.0235 NOMINAL pure BULRIC 0.0130 0.0126 0.0124 0.0123 0.0123 2009 2010 2011 2012 2013

Fixed

Mobile

0.0000 0.0010 0.0020 0.0030 0.0040 0.0050 0.0060 0.0070 0.0080

Cost per terminated minute, EUR

Regional incoming calls (direct)

0.0064 0.0063 0.0063 0.0062 0.0062 National incoming calls 0.0064 0.0064 0.0063 0.0063 0.0062 NOMINAL regional incoming (direct) 0.0064 0.0065 0.0065 0.0066 0.0067 NOMINAL national incoming 0.0064 0.0065 0.0066 0.0066 0.0067 Pure BULRIC with

VoIP licences

0.0042 0.0042 0.0041 0.0041 0.0041 NOMINAL pure

BULRIC with VoIP licences

0.0042 0.0042 0.0043 0.0044 0.0045 2009 2010 2011 2012 2013

(4)

14895-163a

Based on operator comments, we

have revised the calculations

Equipment

components

Space

components

Maintenance

components

Preparation

components

Network

testing

Interconnect set-up: one-time charges EUR Network interconnection and integration, first switch per operator 50 700 Network integration, additional interconnection point per location 31 000 Expansion of existing interconnection at a location per upgrade 1900

Termination of interconnection at a location per location 7700

Interconnect set-up: monthly charges EUR Share of interconnection gateway and

interconnection ports – equipment, ongoing operations and maintenance

per E1 per month or per STM1 per month

64 2016

Monthly interconnection management overheads, finance and invoicing

per operator 2000

Co-location: monthly fee EUR

per 2m2 footprint (fully prepared, powered and

cooled secure cabinet space)

per month 339

includes: share of land, replacement cost of building, rent, interconnect connections, ODF, PSU, aircon, space preparation, 0.1kwH, cabinet, connection and installation costs

(5)

5 14895-163a

Main contacts

For OPTA

Huib de Kleijn

+31 70 315 35 83

h.dekleijn@opta.nl

For Analysys Mason

Ian Streule

+44 1223 460600

Referenties

GERELATEERDE DOCUMENTEN

Indien BTW niet in rekening kan worden bedrijventerrein Cornelisland is gelegen tegenover gebracht, geldt een nader te bepalen opslag op meubelboulevard Reijerwaard, direct aan

Door middel van het verwijderen en (opnieuw) aanbrengen van verkeerstekens op het wegdek en het plaatsen van verkeersborden van bijlage I van het RVV 1990, maatregelen te nemen op

Kijk voor de laatste informatie op allgobus.nl | Rijdt na Station Oostvaarders door als lijn M2 richting Sieradenbuurt, Seizoenenbuurt en Station Centrum. V = Nachtrit: Rijdt alleen

De waardering van de activa en passiva en de bepaling van het resultaat vinden plaats op basis van historische kosten, met uitzondering van de gebouwen en

Indien de belaste verhuur beëindigd wordt dan wel een verzoek tot belaste verhuur niet wordt ingewilligd omdat de huurder niet meer c.q. niet aan de gestelde eisen voldoet, wordt

havengerelateerd' zijn tevens bedrijven toegestaan uit categorie 3 van de in Bijlage 1 opgenomen Staat van Bedrijfsactiviteiten, mits het gaat om bedrijven met

ter plaatse van op de verbeelding aangegeven aanduiding 'kantoor' (Nijmegenstraat 27) zijn de gronden tevens bestemd voor een kantoor;. ter plaatse van op de verbeelding aangegeven

Dit document bevat de gegevens per provincie betreffende het aantal toegekende groenestroomcertificaten voor elektriciteit uit hernieuwbare energiebronnen die is geproduceerd