28-29 November, Karlstad

(4)

Aims 5

th

international partner meeting:

conclusions about project issues and progress

clarity about the extension of ITRACT

clarity about the organization of pilots and BIW

clarity about the information needed for WP6

(5)

Indicative agenda November 28

th

10.00 Welcome Andreas Kassler 10.10 WP1 Welcome and general project issues Theo Miljoen

ITRACT-extended / progress ITRACT Hugo Velthuijsen 11.00 WP2 Progress, issues and to do’s Jan Frick

11.30 WP3 Business Innovation Workshops Niklas Johansson 12.30 Lunch

13.30 WP5 Progress, issues and to do’s: pilots Lars Oelslaeger Attie Sijpkes, Heinz-Hinrich Blikslager,

Anna Stålhammar, Wenche Myrland,

Randall Ghent, Jan Schütter, Enno Schmoll

17.00 Beyond ITRACT and conclusions Hugo Velthuijsen

(6)

Indicative agenda November 29

th

9.00 Guest speakers:

Oded Cats, KTH

Stefan Fjällemark, Hogia

Johnny Albenius, Värmlandstrafik

Umberto Pernice and Ralph Anderson, MMM Group 10.30 Coffee

11.00 WP4 Progress / ITRACT-extended Jacob Mulder ITRACT-extended

11.45 WP6 Progress and to do’s Dirk Strijker 12.15 Conclusions Theo Miljoen 12.30 Lunch

(7)
(8)

Extension ITRACT till March 31, 2015

Changes request have been approved, next change

request will be prepared in spring

Reporting

Describe your activities for each WP for each activity

Money spend outside eligible area:

Consult LB

Report separately in financial and activity report

Be on time

(9)

Indicators, specific action

Number of persons reached

Exhibitions

Website

Transnational training; age > 25

Staff exchange

Transnational demonstration projects

Applications

(10)

http://www.northsearegion.eu/ivb/documents/document-library/

(11)

issues

Transnational collaboration

Projectplace

(12)

Referenties

GERELATEERDE DOCUMENTEN

A call option on the stock is available with a striking price of K = 90 euro, expiring at the end of the period?. It is also possible to borrow and lend at a 25% rate

Chapter 15 - Perceived Benefits, Hassel Factor, and Means End Theory for Crafting A Marketing Message Chapter 16 - Designing a Unique Digital Value Proposition. Module 5 -

We predict that children will be drawn to the sentence-internal reading of ’different’, for both the quantifier ’each’ and the definite plural ’the’, due to their preference

see instructions below. It works on the selected part of the file, and its output is placed in the same file, which can be part of a larger document. The python script is meant to

Table 4.5: Measurability and analysability of variables (No* = measurable after each performed activity,

Ctr.: female control group; Std: standard deviation; T-stat.: t-statistic; F-stat.: ANOVA Fisher statistic; p-val: uncorrected p-value; FDR-adj p-val.: FDR-adjusted p-value;

• The verb needs to take at least three arguments: a Dist Phrase, a Range Phrase and any number of other Noun or Prepositional Phrases.. • At least one argument/modifier other than

Different levels of detail (LOD) seem to be used randomly, instead of following a specific logic when used for communication purposes. Hence a clear scientific position is