transport services

Autoriteit Consument en Markt Attn. Mr J. de Maa

P.O. Box 16326 2500 BH The Hague

Gasunie Transport Services B.V.

P.O. Box 181

www.gasunietransportservlces.com

Date Telephone

28 March 2019 +

Our reference Your reference

LCP 19.0072

Subject

Adjustment of the project proposal for the incremental capacity process 2017

Dear Mr De Maa,

Based on article 28 paragraph 1 of Regulation (EU) 2017/459 (hereinafter referred to as CAM NC) GTS has submitted a project proposal for the incremental capacity process 2017.

Through the present letter GTS adjusts the project proposal for the incremental capacity process 2017. We explain this change in more detail below.

Explanation

In accordance with article 28 paragraph ID CAM NC the project proposal for the incremental capacity process 2017 contains the parameters of the economic test as mentioned in article 22 paragraph 1 CAM NC. For the calculation of the parameters GTS used a reference price of 0,998 Euro/kWh/h/y based on tariffs on interconnection points near the new interconnection point as set by ACM for 2019. This results in an expected present value of the binding commitments of network users for contracting capacity, based on a booking period of 15 years, of approximately €80 million for offer level I and €130 million for offer level II. The present value of the estimated increase in the allowed or target revenue is approximately

€0.6 million.

Due to the implementation of Regulation (EU) 2017/460 (hereinafter referred to as TAR NC) on the 1

st

of January 2020 the existing tariff structure will be replaced with a new tariff structure. The 2019 tariff is therefore not representative. Unfortunately, the Tariff Decision for 2020 is not yet taken. However, the Tariff Proposal of GTS provides an indication of the tariff in 2020, namely 1,640 Euro/kWh/h/y. This results in an expected present value of the binding commitments of network users for contracting capacity, based on a booking period of 15 years, of approximately €130 million for offer level I and €210 million for offer level II.

The present value of the estimated increase in the allowed or target revenue is approximately €0.6 million.

Page 1 of 2

Openbaar

(2)

transport services

Gasunie Transport Services B.V.

Date: 28 March 2019 Our reference: LCP 19.0072

Subject: Adjustment of the project proposal for the incremental capacity process 2017

To be clear, in the economic test for the incremental capacity process 2017, the estimated reference price is equal to the (non-storage) entry tariff in Tariff Decision 2020, to be taken by ACM.

We kindly request to include this adjustment in the assessment of the project proposal for the incremental capacity project 2017.

Yours sincerely,

GASUNIE TRANSPORT SERVICES B.V.

Referenties

GERELATEERDE DOCUMENTEN

The project’s findings reflect the complexity of capturing fifth grade students’ capacities to think historically (both in-situ and post process) while tandemly assessing the role

The DESARC method includes the identification of the research problems, the description of research projects, and the selection of research groups who are experts in

When there are no paths can be satisfied with the number of HRSs to be located in the first planning period, proximity greedy algorithm will consider the supplier location as

Overall, we find that OXERA’s WACC report for the Raad contains recommendations that are not consistent with good regulatory practice, and are likely to cause a downward bias in

To investigate whether two different research methods which were effectively used for measuring customer value for products and services: field value in use analysis and

192 Medecins sans Frontières, ‘The Hunting and Killing of Rwandan Refugees in Zaire-Congo’, 73.. 194 Medecins sans Frontières, ‘The Hunting and Killing of Rwandan Refugees

Degradation rates in subsurface layers might differ significantly from those in the surface layer because of changes in soil conditions such as organic matter content, microbial

A fifth limitation is that it was sometimes difficult to picture if companies face consumer skepticism and credibility problems towards their sincere CSR communication, because