Maximum tariffs STUCO per January 1

st

2019 – Drinking water

This overview shows the tariffs that STUCO can maximally charge the customer effective from January 1st, 2019.

These tariffs are net of subsidy by the Ministry of Infrastructure and Water Management.

Maximum variable distribution tariff: 7,8746 USD/M3

Maximum fixed distribution tariff (USD per month):

Year

Capacity tariff

excl. subsidy

2019 69,62

Drinking water by truck (USD per M3)

Year

Tariff excl.

subsidy

2019 15,30

Connection tariff

Tariff (USD) Tariff for road crossing, if

applicable (USD per meter)

260,12 180,65

Reconnection tariff: USD 40,00

Referenties

GERELATEERDE DOCUMENTEN

Establishment Act of the Authority for Consumers and Markets and several other acts in connection with the streamlining of the market oversight activities of the Authority

This overview shows the tariffs that Saba Electric can maximally charge the customer effective from January 1 st , 2019.. These tarrifs are net of subsidy by the Ministry of

This overview shows the tariffs that STUCO can maximally charge the customer effective from January 1 st , 2019.. These tariffs are net of subsidy by the Ministry of Economic

For example, think of specific connectivity for “verticals”, such as the car industry, energy sector, public order and security (See Section 1). Network slicing allows for

a) Amend the day-ahead nomination closure time to 13:30 CET and shorten the bidding period by 10 minutes for the explicit day-ahead auctions. b) Implement full firmness

The variable use tariff takes into account the production price, referred to in Section 2.5, paragraph 1, and the costs associated with the tasks and obligations of a

The variable use tariff takes into account the production price, referred to in Section 2.5, paragraph 1, and the costs associated with the tasks and obligations of a

The methodology specifies that the allowed cost of debt should be based on the average cost of debt for generic A-rated industrial bonds, and the cost of debt for a group of