• No results found

Maximum tariffs Saba Electric per January 1

N/A
N/A
Protected

Academic year: 2021

Share "Maximum tariffs Saba Electric per January 1"

Copied!
1
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Pagin

a

1

/1

Maximum tariffs Saba Electric per January 1

st

2019

This overview shows the tariffs that Saba Electric can maximally charge the customer effective from January 1st, 2019.

These tarrifs are net of subsidy by the Ministry of Economic Affairs and Climate Policy.

Variable distribution tariff: 0,3516 USD/kWh Fixed distribution tariff (USD per month)

Tariff category (KVA) Capacity tariff excl. subsidy 2019 Tariff category (KVA) Capacity tariff excl. subsidy 2019 3,2 31,23 63,3 617,82 7,7 75,15 78,3 764,22 13,3 129,81 83,3 813,02 18,3 178,61 93,3 910,62 23,3 227,41 98,3 959,42 28,3 276,21 100,0 976,02 38,3 373,81 125,0 1.220,02 48,3 471,42 350,0 3.416,05 Connection tariff

Tariff category (KVA) Tariff (USD)

3,2 258,43

7,7 289,75

Tariff for trenchwork, if applicable: USD 82,43 per meter Reconnection tariff: USD 40,00

Referenties

GERELATEERDE DOCUMENTEN

In 2019 zijn er op Bonaire drie herhaalde eerste hielprikken uitgevoerd, omdat de eerste hielprik binnen 24 uur na een bloedtransfusie werd afgenomen (tabel

The draft decision dated 1 st March 2018 assumes that 50/50 entry-exit split allows transmission system operators (TSO) to collect revenues via the entry and exit network

The variable use tariff takes into account the production price, referred to in Section 2.5, paragraph 1, and the costs associated with the tasks and obligations of a

The variable use tariff takes into account the production price, referred to in Section 2.5, paragraph 1, and the costs associated with the tasks and obligations of a

Tot slot neemt de ACM ook de kosten voor de inkoop van brandstof en elektriciteit (voor de productie van drinkwater) niet mee in de operationele kosten omdat deze kosten apart

Under Section 2.5, Section 3.9, paragraph 4, and Section 3.14 of the BES Electricity and Drinking Water Act, ACM’s responsibilities include setting a maximum production price

Op basis van artikel 3.14 eerste lid, tweede lid onder c en zesde lid, van de Wet elektriciteit en drinkwater BES moet de ACM het variabele gebruikstarief van elektriciteit

Thus the derived BMI will also be precise and contain little random error, The estimates for length and weight at age 18 come from the memory of the participants and will be much