• No results found

Office of Gas and Electricity Markets9 MillbankWestminsterLondon SW1P 3GEDear Sir or Madam

N/A
N/A
Protected

Academic year: 2021

Share "Office of Gas and Electricity Markets9 MillbankWestminsterLondon SW1P 3GEDear Sir or Madam"

Copied!
1
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Office of Gas and Electricity Markets 9 Millbank

Westminster London SW1P 3GE

Dear Sir or Madam

Balgzand-Bacton gas interconnector (BBL) consultation

DTe and Ofgem published today on their websites parallel consultations in relation to Gastransport Services’ (GTS) request for early guidance on the regulatory treatment of the proposed gas pipeline between the Netherlands and the UK connecting Balgzand and Bacton. This early guidance has been requested pending implementation of the new Gas Directive in relation to interconnectors in the Netherlands and the UK.

Further background, relevant issues for consultation and contact details are contained within the respective consultation papers available on our websites: www.dte.nl and

www.ofgem.gov.uk. The closing date for both consultations will be 17 October 2003. If you have any questions on this letter you can contact Martijn van Gemert (+31) 70 3301398 or Kevin James 020 7901 7181.

Yours faithfully

Ivo R. Verdonkschot and Kyran Hanks

Referenties

GERELATEERDE DOCUMENTEN

Moreover, in order to be effective, BEREC supports a data-driven regulatory approach and believes that the regulatory toolbox should include specific tools aimed at

• the asset beta value is based on an in-depth analysis of comparator data for similar companies – with a range of methodologies for estimating betas assessed – and incorporates

That DEA estimates asymptotically converge to the true level of efficiency from above (cautiousness). That DEA estimates are relatively insensitive to the model specification

Because electricity volumes are expected to increase, the issue of volume risk and asset stranding is only relevant for the Dutch Gas DSOs.. Gas DSOs do not face short-term

The L-gas system is technically capable of importing flexibility via quality conversion facilities from the H-gas network. The H-gas system is capable of substituting for

58. De directeur DTe adviseert op basis van de thans beschikbare informatie om GtS comfort te verlenen dat volledige ontheffing voor minimaal 10 jaar wordt verleend. Daarbij

De t erm init iële cont ract en heeft bet rekking op de verplicht ingen die door shippers vóór het nem en van de invest eringsbeslissing in de BBL zij n aangegaan voor het

I n Ofgem ’s init ial views docum ent as well as in addit ional quest ions put t o GTS by DTe and Ofgem , em phasis has been giv en t o com pet it ion issues.. Priorit isat ion