September 21, 2005 Virgo Status – ESF Workshop 2

Main injection problem (2004)

 Input Mode cleaner mirror back scattering:

 IMC instability when Power Recycling mirror aligned

 Solutions:

» Sort term: Factor 10 attenuation between IMC and PR mirror

Only 0.7W injected in the ITF

» Long term: add a Faraday isolator  redesign the injection bench

IMC length control signal

Red: PR aligned Black: PR misaligned

With the factor 10 attenuation

(3)

Virgo Recent Progress

 October 2004

 First lock in recycled configuration.

 C5 run: December 2004

 Recycled and “Recombined” modes.

 2005 Commissioning activities

 Alignment:

» Drift controls using wavefront sensing now on all d.o.f.,

» Most loops are also closed.

 Automation,

 Control upgrades, robustness,

 Noise hunting,

 Commissioning slow down by instabilities (“jumps”) during the first semester,

 C6 and C7 commissioning runs.

 Summer shutdown preparation

 New “injection” (bench, PR mirror, ISYS alignment).

 Data analysis preparation

 Study C-run data,

 Collaborative data analysis (LIGO-Virgo, Bar-Virgo).

(4)

September 21, 2005 Virgo Status – ESF Workshop 4

Sensitivity evolution

(5)

C6 run

 July 29 – August 13

 Duty cycles:

 Locking: 89%

 Science mode: 86%

Daily Locking Performance

0 20 40 60 80 100

Day

Lock % %Science/Day

%Lock/Day

(6)

September 21, 2005 Virgo Status – ESF Workshop 6

C6 “Binaries Injections”

 Inject NS-NS

 Online Analysis

 [1.2-1.6] Solar Mass

 Injections seen on the

online SNR max plots

(7)

C6 “Burst Injections”

Strange periodicity

 Inject Sine-Gausian

 Central frequency: 460Hz

 Nominal SNR: 15

 Example of the third injection:

 Power filter algorithm

 Efficiency ~ 90%

 False alarm rate ~.3 event/sec

 Timing resolution: 1.3ms

Centering of the North Bench quadrant!

(8)

September 21, 2005 Virgo Status – ESF Workshop 8

C6 noise budget

(9)

Post C6 upgrades (I)

Sensitivity from Aug 12 (End of C6) Sensitivity from Aug 27

Improvement due to Linear Alignment (4 loops closed

instead of 2)

DAC noise reduction

PR z control noise reduction (Neo filter with roll-off

@ 100 Hz)

BS z control noise : alpha tuning

New optical setup for B5  Reduction of laser frequency noise

2kHz bump due to

detection tower

pump (exciting

external bench

resonances)

(10)

September 21, 2005 Virgo Status – ESF Workshop 10

Post C6 upgrades (II)

August 27

th

(600kpc) with NEO2

September 12

th

(850 kpc) without NEO2

 Increase of modulation index => reduction of PR_zCorr impact

 Diffused light dumped on WE => no more bump ~ 100-400 Hz

 Modulation frequency tuning

 BS coil driver upgrade

 And LA tuning…

(11)

C7 run

 September 14 - 19

 Duty cycles:

 Locking: 70%;

 Science mode: 65%

Daily Locking Performance

0 20 40 60 80 100

Day

Lock % %Science/Day

%Lock/Day

(12)

September 21, 2005 Virgo Status – ESF Workshop 12

C7 Hardware injections

 NS-NS events

 Two online analysis:

 1 hour of data ploted September 19

September 15

Injected events

1.2-1.6 S.M. Grid

1-3 S.M. Grid

(13)

Virgo compared to LIGO

(14)

September 21, 2005 Virgo Status – ESF Workshop 14

Virgo-LIGO joint analysis

 Working group for burst and inspiral events

 Up to now work on simulated data :

 Project “1a”: Compare analysis pipelines on the same data sets.

 Project “2b”: Study the advantages of 3 sites for astrophysical sources

» Sky location, Detection efficiency

 3 talks and papers (GWDAW9 and Amaldi 6)

Burst from galactic

center

(15)

Virgo- Bars joint analysis

 AURIGA, ROG

 Burst events and Stochastic signals

 Project starting with software injection

 4 hours of data

 Plan to analysis C6 &C7

(16)

September 21, 2005 Virgo Status – ESF Workshop 16

Next steps

 Sept-Dec 05: “Injection” shutdown

 2-3 months of work

» New injection bench;  Power should go up by a factor 10

» New recycled mirror:  Better controls

» Miscellaneous changes

 Followed by the new injection system commissioning

 2006: Commissioning + data taking

 Alignment, controls,…

 A science run by the end of 2006 (coincidence with LIGO-S5) ?

 2007

 Data taking/Commissioning/Upgrades

 2008-9: Virgo +

 50W laser, New electronic, New mirrors ? (not yet decided)

 2011(?): Advanced Virgo

 200W laser? New beam geometry? New mirrors?...

Referenties

GERELATEERDE DOCUMENTEN

• Input mode cleaner: 144 m suspended triangular cavity. • Large Faraday isolator with thermal compensation

 Injection bench alignment sensor noise below 15Hz.. 

Thanks to the standard size of the mirror and reference mass the assembling procedure is similar to the one adopted for the Virgo main mirrors (see the picture sequences at the

WE ty pure DC error signal => no extra noise vs. AC WI under

Such data are entirely independent of any observation in the electromagnetic spectrum, and are therefore likely to lead to unique information on such compact

The board has an I&Q detector (quadrature detector) for the horizontal signal and also for the vertical signal.. Each I&Q detector has an I-output and

Galvo feedback on NE bench (07/2006) Galvo feedback on NE bench

Sh and Sv should be below saturation for a beam fully non-centered on the quadrant (with 2.7mA current, we take R_dc = 3.0 kohms) to ease the lock acquisition.. Assuming R_dc = 3