• No results found

Community land formalization and company land acquisition procedures

N/A
N/A
Protected

Academic year: 2021

Share "Community land formalization and company land acquisition procedures"

Copied!
12
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Contents lists available atScienceDirect

Land Use Policy

journal homepage:www.elsevier.com/locate/landusepol

Community land formalization and company land acquisition procedures: A

review of 33 procedures in 15 countries

Laura Notess

a

, Peter Veit

b,

*

, Iliana Monterroso

c

, Andiko

d

, Emmanuel Sulle

e

, Anne M. Larson

c

,

Anne-Sophie Gindroz

f

, Julia Quaedvlieg

h

, Andrew Williams

g

aCentre for Law and Democracy, Canada bWorld Resources Institute (WRI), USA

cCenter for International Forestry Research (CIFOR), Peru dAsM Law Office, Indonesia

eInstitute for Poverty, Land and Agrarian Studies (PLAAS), University of the Western Cape, South Africa fRights and Resources Initiative (RRI), Indonesia

gNational Forestry Authority, Uganda

hInternational Institute of Social Studies (ISS), The Netherlands

A R T I C L E I N F O Keywords:

Indigenous and community land Customary land rights Formalization

Company land acquisition

A B S T R A C T

Indigenous and community lands, crucial for rural livelihoods, are typically held under informal customary tenure arrangements. This can leave the land vulnerable to outside commercial interests, so communities may seek to formalize their land rights in a government registry and obtain an official land document. But this process can be time-consuming and complex, and in contrast, companies can acquire land relatively quickly andfind shortcuts around regulatory burdens. This article reviews and maps 19 community land formalization and 14 company land acquisition procedures is 15 countries in Africa, Asia and Latin America. Comparing community and company procedures identifies multiple sources of inequity.

1. Introduction

As global demand for foods, fuels, minerals,fibers, and other nat-ural resources grows, land acquisitions are on the rise around the world (World Bank, 2017). Companies and investors are increasingly seeking to acquire land for long periods of time. As this competition intensifies, land that communities, including Indigenous Peoples (hereafter com-munities) hold under customary tenure arrangements1is vulnerable to acquisition by powerful political and economic elites, particularly if the land rights are not entered in a government registry or cadaster and the government has not issued the community an official document, such as a land certificate or title (Alden Wily, 2011a,2011b,2011c;Anseeuw et al., 2011).

While customary tenure systems historically provided communities with tenure security, the growing threats are leading to new insecurity (Chimhowu, 2019; Alden Wily, 2011b). Many communities across

Africa, Latin America, and Asia are applying for formal land rights to integrate their customary rights into official legal systems and to pro-tect their lands. The stakes are high, given that more than 50 percent of the world’s land is community land and as many as 2.5 billion people depend heavily on these lands for their livelihood (Pearce, 2016). Even where formalization is not needed for legal recognition, communities are registering their land to “double-lock” their rights (Alden Wily, 2017). While formalization is not a guarantee of tenure security and can bring challenges (e.g., property taxes), for many communities facing growing threats to their customary land, the benefits now outweigh the costs.

Globally, national laws recognize just 10 percent of land as be-longing to communities, and another 8 percent is designated by gov-ernments for community use (RRI, 2015). Further, not all legally-re-cognized community land is registered and documented. Community land formalization is rarely a government priority (RRI, 2017). In many

https://doi.org/10.1016/j.landusepol.2020.104461

Received 12 August 2019; Received in revised form 2 January 2020; Accepted 4 January 2020

Corresponding author at: World Resources Institute, 10 G Street, NE, Suite 800, Washington, DC 20002, USA.

E-mail addresses:laura.notess@gmail.com(L. Notess),peterv@wri.org(P. Veit),I.Monterroso@cgiar.org(I. Monterroso),andi.ko.ko@gmail.com(Andiko), esulle@plaas.org.za(E. Sulle),a.larson@cgiar.org(A.M. Larson),asgindroz@rightsandresources.org(A.-S. Gindroz),quaedvlieg@iss.nl(J. Quaedvlieg), andrew.mazingira@gmail.com(A. Williams).

1Community (including indigenous) land is defined as land (and natural resources) collectively held and governed by a community, regardless of recognition under

national statutory law. Community land may include both common resource areas or land that the community has allocated to individuals, households, or subgroups.

0264-8377/ © 2020 Elsevier Ltd. All rights reserved.

(2)

countries, national laws do not recognize collectively-held land or es-tablish a formalization procedure (Alden Wily, 2017). Where such procedures are in place, the law is often poorly implemented (RRI, 2015). Many governments consider community land, especially the common property (e.g., forests, pastures, and wetlands), to be vacant, idle, and underused (Alden Wily, 2011a;De Schutter, 2011). For many officials, the promise of economic growth and foreign exchange trumps community land rights and justifies allocating this land to companies for investment purposes (Anseeuw et al., 2011).

Formal land documents can help communities convince others of their legal rights, ensuring that they will be recognized and respected by others. They can be used as evidence of legal possession in a court of law where they commonly carry more weight than oral testimony on customary rights. Land titles can also provide communities critical leverage in negotiations with outside investors (Knight, 2012).

Documented community land can also open opportunities for ac-cessing projectfinance using channels other than credit. Governments and banks fund against the viability and profitability of projects and consider documented community land to be more secure than custo-marily held land (Ding et al., 2017). In Mexico, the government sup-ports community forest enterprises, but communities with any out-standing land rights issues are not eligible to participate in such government programs (Bray et al., 2006;Guerra, 2015).

Tenure security creates incentives for community members to make land-related investments by providing them with high expectations of rights over the returns (Bledsoe, 2006;Deininger, 2003;Deininger and Feder, 2009). Coupled with other measures (e.g., payments for eco-system services), tenure security can promote long-term investments by communities in land stewardship that generate positive environment and development outcomes. In Bolivia, Brazil, and Colombia, the average annual deforestation rates on titled indigenous lands in the Amazon are two to three times lower than in similar forestlands not titled to Indigenous Peoples (Blackman and Veit, 2018). In the Peruvian Amazon, formalizing indigenous lands significantly reduces forest clearing and disturbance (Blackman et al., 2017).

Such investments can, in turn, enhance the productivity of the land, boost farmer income, and discourage unsustainable practices (Byamugisha and Fulgence, 2013;Knight, 2012;World Bank, 2018). In Mexico, India, Nepal, and other countries, many communities with documented land rights have established forest-based enterprises that produce benefits for local producers and restore ecosystem services for society (Hodgdon and Monzón, 2017;Hodgdon et al., 2013).

Understanding the challenges and opportunities for improving community land formalization procedures is central to securing cus-tomary lands and protecting rural livelihoods worldwide. To this end, this research was designed to better understand procedural pathways for communities and companies, and to assess whether communities and companies are treated differently in the formalization process, and why. This article provides thefindings of a review of 33 community and company procedures for acquiring formal land rights in 15 countries.

2. Methods

Data was collected on 19 community land formalization procedures in 15 countries—five each in Africa, Asia, and Latin America (Fig. 1).2 National laws were reviewed for all community procedures, and im-plementation for 6 procedures (Table 1). In addition, 14 company land acquisition procedures for agricultural, oil palm, forestry, tourism, or general economic purposes were examined in 12 research countries. The relevant laws were reviewed for all company procedures and

practice was investigated for 6 procedures (Table 2). All 33 procedures examined are established in law and administered by the government. The community procedures analyzed are the most common or, in some cases, the only legally established procedures for registering and documenting new community or preexisting customary land rights in the research countries. All procedures provide communities with a large, but not complete bundle of land rights. For example, no proce-dure provides communities with commercial use rights over high-value natural resources on or below their land (unlike company procedures). Further, some formalization procedures do not provide communities with rights in perpetuity, while others do not provide them with the rights to sell or lease their lands. A few procedures (e.g., Indonesia and India) focus on formalizing community tree and forest rights but were included in this research because they also grant significant land rights. All company land acquisition procedures examined are adminis-tered by the government, including the principal procedures for ac-quiring government and community land. While the granted bundle of rights varies by procedure, all provide companies with some commer-cial use rights. The research did not examine private market transac-tions to purchase or lease privately held land (e.g., willing seller, willing buyer transactions), compulsory land acquisition by the gov-ernment and the subsequent transfer of this land to companies, and illegal paths or procedures that are not established by law.

Data collection focused on eight key formalization issues (Box 1). To help ensure consistency in data collection across informants, proce-dures, and countries, multiple indicators for each issue were developed and scored. Three issues - number of steps, cost in dollars, and cost in time - are also used by the World Bank for measuring property regis-tration in the annual Doing Business reports (World Bank, 2018).

Data was collected by reviewing the literature on community and company procedures, and all relevant national (or federal) laws prior to December 2017, including the constitution, statutes, regulations, and court rulings of relevant cases, to the extent they were available. Subnational laws and government policies and statements that are not legally binding were not reviewed. Data was also collected by inter-viewing national and international experts on community and company procedures.

In addition,field research was conducted in Peru, Tanzania, and Indonesia, involving semi-structured individual and group interviews with stakeholders (e.g., government and company officials, local civil society organization [CSO] and non-governmental organization [NGO] leaders, and researchers). Site visits were also conducted to meet with community leaders and villagers with experience in land formalization. 3. Keyfindings

This section provides key datafindings for community and company procedures.

3.1. Community land formalization procedures 3.1.1. Preconditions and steps

Often, communities must meet certain legal preconditions before the formalization process can start. Preconditions typically include re-quirements regarding the nature of eligible communities, such as in-digenous status, or mandatory ties to the land. Ten of the 19 community procedures are reserved for Indigenous Peoples, one for Quilombola communities (Afro-Brazilian communities), and the remaining eight apply to communities defined more broadly in national laws.

Communities must demonstrate historic ties to the land in 12 pro-cedures with several defining what constitutes a historic link in light of challenging evidentiary or other requirements. In Guyana, the com-munity must consist of at least 150 persons and have existed for 25 years. In Chile, communities must possess a specific, historic govern-ment docugovern-ment.

In 12 of the 19 procedures, communities must form a legal entity or

2A community or company procedure is defined as a process that registers

land rights in government records and grants the community or investor a unique legal document. Procedures were treated separately if recorded in a different registry or conveyed via a different legal instrument.

(3)

obtain government certification that they constitute a community. This requirement varies in complexity but often, involves completing an application, electing a village council, and drafting bylaws.

In practice, meeting preconditions can be burdensome, time con-suming, and sometimes disqualifying for communities. Often govern-ment policies or priorities create new preconditions beyond those re-quired in law.

The number of steps and involved government agencies mandated by law varies by procedure (Table 3). Typical steps include submitting the application; notifying other agencies, the public, or neighbors; a field visit or technical verification; surveying and/or boundary agree-ment with neighbors; settling opposition to the application or disputes; entry into an official registry; and issuance of a deed or certificate.

All procedures require mapping or surveying, of varying degrees of technicality, except Chile (with no implementing regulations). Further, all 19 procedures require some level of screening for third-party claims via public notice followed by contestation periods, government ver-ification for such claims, or alternate forums for oppositions to be brought.

In practice, communities must complete additional steps in the 6 community procedures examined (no data was collected on demarca-tion in Mozambique) (Table 4). Implementing authorities can add steps in the form of non-binding guidelines or project-specific plans. Many extra stepsfill gaps in the law and may have been designed to reduce the discretion of officials.

The total number of steps communities navigate highlights the Fig. 1. Map of Research Countries.

Table 1

Community Land Formalization Procedures Reviewed. Source: WRI.

COUNTRY PROCEDURE REVIEW OF LAW REVIEW OF PRACTICE

Brazil Collective Land Titling of Quilombolas •

Brazil Indigenous Territories •

Cambodia Collective Land Title •

Cameroon Land Title •

Chile Art. 20(b) Land Transfer •

Côte d'Ivoire Land Certificate •

Guyana Amerindian Land • •

India Community Forest Rights •

Indonesia Customary Forest • •

Mozambique Delimitation • •

Mozambique Demarcation •

Panama Indigenous Community Land Title •

Peru Native Community Land Title • •

Peru Usufruct Contract for Classified Forestland • •

Philippines Certificate of Ancestral Domain •

Papau New Guinea Registered Customary Land •

Tanzania Certificate of Village Land • •

Uganda Certificate of Customary Occupation •

Uganda Group Freehold •

(4)

Table 2

Company Land Acquisition Procedures Reviewed. Source: WRI

COUNTRY PROCEDURE REVIEW OF LAW REVIEW OF PRACTICE

Cambodia Economic Land Concessions •

Cameroon Provisional Concessions on National Land •

Côte d'Ivoire Emphyteutic Lease •

Guyana State Land Grant or Lease • •

Indonesia HGU Land Use Right/Palm Oil Plantations • •

Indonesia HTI/Industrial Forests • •

Mozambique DUAT Acquisition for Economic Purposes • •

Panama Concessions for Tourist Investment •

Peru Rights to Forests on Classified Agricultural Land • •

Philippines Lease of (Public) Alienable and Disposable Land •

Papau New Guinea SABL •

Tanzania Granted Right of Occupancy/Derivative Right • •

Uganda Freehold Land from District Land Board •

Uganda Grant/Leasehold from ULC •

TOTAL 14 6

Box 1

Eight Key Community Land Formalization and Company Land Acquisition Issues

PRECONDITIONS AND STEPS. * The eligibility criteria and preconditions to formalize land rights and the various steps and government agencies involved in the procedures.

COST IN TIME. The cost in time to formalize land rights, including reasons for variations. COST IN MONEY. The cost in money to formalize land rights, including reasons for variations.

LAND SIZE. The minimum and maximum amount of formal land set in the law and anyfloors or ceilings that exist in practice. RIGHTS DURATION. The duration in time of the formal land rights in law and practice (e.g., granted in perpetuity or a set term). RIGHTS GRANTED. The bundle of formal land rights granted in law and practice under each reviewed procedure.

RIGHTS MAINTENANCE. Affirmative obligations to maintain the formal land rights over time (e.g., property taxes and environment and development conditions).

RIGHTS REVOCABILITY. Actions that may result in the formal land rights being revoked or extinguished and the government entity with the authority to limit or extinguish the formal land rights.

* A precondition is a requirement that must be completed prior to the formalization or land acquisition process and is not part of the procedure itself or linked to the formalization or acquisition of land rights. In the methodology for this report, a precondition is distinct from a step. Thus, obtaining general recognition of indigenous status is a precondition, but if the recognition requires a showing of landholdings or is established for land management purposes, it is a step.

A step is any interaction between two separate entities, including between the entity acquiring the land, the person the land is acquired from, government agencies, consultants, and lawyers. This means that interactions between government agencies or offices are considered separate steps. Intra-community interactions or internal company actions are not considered separate steps.

Table 3

Steps in Community Land Formalization Procedures in Law.

PROCEDURE NUMBER OF STEPS NUMBER OF GOVERNMENT

AGENCIES

COMMENTS*

Brazil: Indigenous Territories 18–21 8

Brazil: Quilombola Collective Titles 15–21 6 Open-ended steps

Cambodia: Collective Land Title 11–25 5–9

Cameroon: Land Title 12–17 8–9 Open-ended steps

Chile: Article 20(b) Land Transfer 6 2 Missing implementing regulations

Côte d’Ivoire: Land Certificate 14–15 9

Guyana: Amerindian Land Title 10–12 3 Significant ambiguities in the law. Open-ended steps

India: Community Forest Rights 13–22 5

Indonesia: Customary/Adat Forest 12 12 Some steps governed at the regional level

Mozambique: DUAT Delimitation 7 1–2

Mozambique: DUAT Demarcation 10 5

Panama: Indigenous Collective Land Title 11–18 5–6

Peru: Native Community Land Title 19 7

Peru: Usufruct Contract of Forestland 20 8 Implementing regulations are enacted at the regional level

Philippines: Certificate of Ancestral Domain 54–61 19 Open-ended steps

PNG: Certificate of Title to Customary Land 10–13 5–6

Tanzania: Certificate of Village Land 3 2 Implementing regulations do not provide more detailed steps

Open-ended steps

Uganda: Certificate of Customary Occupation 14–16 5 Open-ended steps

Uganda: Group Freehold 15–17 5 Open-ended steps

Average (low and high) 14.4–17.6 6.3–6.7

Median (low and high) 12–17 5–6

(5)

complexity of land formalization processes. Often, however, one step in the process or one institution (often a government agency) is re-sponsible for the procedure breaking down in practice. Interagency politics and inaction by specific administrative departments are common sources of delays. Where third parties have competing claims to the land, the process can breakdown, as the procedures generally do not establish workable disputes resolution mechanisms.

In other cases, problems result from the lack of crucial im-plementation regulations that establish a framework for formalization. Some countries lack key government institutions. Capacity and co-ordination issues are also common both for communities and the re-sponsible government agencies.

3.1.2. Time and expense of the formalization process

For all 19 community procedures examined, the law does not es-tablish overarching time frames within which the procedure must be completed. However, legally-mandated deadlines are imposed for cer-tain steps in most procedures, commonly related to notice require-ments, or timelines within which oppositions or contestations must be made. Time frames on entry of rights into a registry or on signatures of approval are rare and, where they exist, not consistently established.

In practice, the time to complete the formalization procedures varies significantly among communities within a country, and across countries (Table 5). Overall, completing the procedures take from around a year to 30 years or more. Boundary disputes with neighbors, competing claims to the land from third parties, or opposition from

concession holders for mining, forestry, or other purposes are common and significant sources of delay.

Lack of government capacity or prioritization is problematic. Authorities may have insufficient budget, qualified personnel, or re-quisite supplies. Lack of political will, commitment from local and/or national authorities, and accountability for government staff are further concerns. Technical requirements, such as a soil analysis in Peru re-quired to determine what legal category the land should be classified as, are particularly time-consuming and costly. Communities sometimes struggle to meet requirements, due to a lack of literacy, translation is-sues, or intra-community divisions.

Regarding expenses, no procedure has detailed provisions in law on the costs of formalization, although 14 of the 19 procedures provide general allocation of costs among parties. The often-high costs of land surveying are more likely to be allocated to the government. Where communities bear the costs of formalization, the law often establishes some nominal fees.

In practice, costs vary. In Tanzania, the cost of obtaining a Certificate of Village Land ranges from US$500 to $1000 per commu-nity Byamugisha and Fulgence, 2013. In Peru, the cost for titling agricultural land ranges from $1000 to $13,000. In Mozambique, de-limitation costs in the early 2000s ranged from $2000 to $8000 and between 2010 and 2012 they averaged around $13,000De Wit and Norfolk, 2010;Quan et al., 2013). The cost of boundary demarcation, technical requirements and resolving conflicts where rights overlap are often high, especially where communities are remote.

Table 4

Steps in Community Land Formalization Procedures in Practice.

PROCEDURE STEPS GOVERNMENT AGENCIES KEY BARRIES TO COMPLETING THE PROCESS

LAW PRACTICE LAW PRACTICE

Column1 Column2 Column3 Column4 Column5 Column6

Guyana: Amerindian Land 10–12 37–44 (Guidelines) 29–32 (actual practice)

3 8–9

Resolving conflicting concessions

Demarcation errors and disagreements over maps

Institutional disputes

Process restarts when a request is changed Indonesia: Customary/ Adat

Forest

12 17 12 21

Obtaining recognition as a community from the local

legislative body

Lack of technical regulations at the national level

Mozambique: DUAT Delimitation 7 9 1–2 2

Boundary harmonization and settling land disputes

Translating participatory map to the technical map

Issuance of certificate Peru: Native Community Land

Title

19 28 7 12

Resolving overlaps with concessions/productive forests

Completing registration in various cadastres

Soil analysis (potentially simplified by new laws) Peru: Usufruct Contract of

Forestland

20 33 8 15

Confusion over institutional responsibility

Lack of implementing regulations and guidelines Tanzania: Certificate of Village

Land

3 18 2 5–6

Resolving boundary conflicts

Delays in issuing documents/misplaced documents

Obtaining district level approval

Surveying (lack of capacity/expense) Note: For Guyana Amerindian Land, recent nonbinding guidelines have been developed but not yet implemented.

Table 5

Community Land Formalization Procedures in Practice.

Source: Field research led by CIFOR, AsM Law Office, UCRT, and RRI. Comments by APA/FPP. Sources:Amerindian Land Titling Project Board, 2016;Atkinson et al., 2016;Almås et al., 2014;Byamugisha and Fulgence, 2013;De Wit and Norfolk, 2010;Donovan et al., 2012;Fairley, 2012;Ghebru et al., 2015;GOG/OP, 2010; Knight et al., 2013;TFCG, 2015;Quan et al., 2013, andSchreiber, 2017.

PROCEDURE COST IN TIME COST IN $ (USD) SIZE OF LAND DURATION OF

RIGHTS

REVOCABILITY

Guyana: Amerindian Land Up to∼30 years outstanding claims (since 1960s)

No Data 259–8,288 ha (limited data)

Unlimited 1 report: extinguished arbitrarily

Indonesia: Customary Forest 4–15 years No Data No Data Unlimited None reported

Mozambique: Delimitation 2–3 years 2,000–13,329 < 10–500,000 ha Unlimited None reported

Peru: Native Community Land Up to 20+ years 10–25 years 1,000–13,000 19–452,735 ha Unlimited None reported

Peru: Usufruct Contract (same as above) plus 30 days–1 year No Data No Data Unlimited None reported

Tanzania: Certificate of Village Land

1–3 years outstanding claims: 5+ years

(6)

Financing typically comes from a combination of governments, in-ternational organizations, CSOs, NGOs, and communities themselves. Even where under the law governments bear responsibility for paying costs, communities often have expenses in practice and are reliant on donor organizations to meet them.

3.1.3. Duration of the rights, requirements to maintain them, and revocability

The rights granted to communities are mandatorily of unlimited duration for 17 of the 19 procedures. Only under group freehold titles in Uganda and land certificates in Côte d’Ivoire are the rights not in perpetuity.

Of the 19 community procedures, only Côte d’Ivoire mandates af-firmative obligations on communities to retain the recognition of their rights, requiring that the land be under an agricultural or other op-eration (a “mise en valeur” condition). For the three procedures in Guyana and Uganda, government has the discretion to impose condi-tions as it seesfit. No country requires the regular submission of land-use or development plans.

It is common, however, for laws to include requirements related to environmental, conservation, or land use, without clearly establishing that the rights will be revoked if they are not met. For example, many countries have legal provisions that, while not constituting explicit conditions, penalize landholders who do not develop or use their land. There is significant ambiguity in the law, however, as to what re-quirements may result in revocation of rights if violated. For 8 proce-dures, the law is silent as to whether or how the rights may be revoked (implying irrevocability but without necessarily establishing it). The remaining 11 variously have provisions allowing for revocation if a condition of the right has been violated, the land is abandoned or left undeveloped, or there was fraud or mistake in the allocation process.

In practice, the rights for all 6 procedures examined are granted for the full duration specified in law (in perpetuity). And except for Guyana (Almås et al., 2014), the research did not identify any instances of rights being revoked once they were granted. There are examples of rights being lost through other means, however, such as when a village is subdivided in Tanzania which invalidates the prior Certificate of Village Land (Schreiber, 2017).

3.1.4. Scope of the rights granted

In law, the rights granted to communities may be limited geo-graphically, or in terms of which rights may be exercised over the land. No community procedure had a numeric acreage ceiling or cap placed on how much land can be formalized. However, 7 of the 12 procedures which require a showing of historic status or land use link this re-quirement specifically to the land that may be formalized. This means the amount of land may be restricted to that for which communities can meet the evidentiary requirements of historic use. Similarly, some procedures exclude certain types or legal classifications of land, or land that has been granted or leased to third parties. For example, 5 of the 19 procedures either exclude classified forested land or classified non-forest land (these are legal categories that may or may not correspond with actual geography).

In practice, government officials impose unofficial caps or arbitrary criteria restricting the size of land granted in 5 of the 6 procedures examined for practice. In Indonesia, Guyana, and Mozambique, officials have refused to process applications that they consider too large, ar-guing the area exceeds community management capacities. There are also problems in translating maps that communities prepare to the government cadaster.

The ability of communities to take and use natural resources (withdrawal rights) is restricted. Many natural resources, including minerals, hydrocarbons, water, and other high-value natural resources are the property of the state or are public resources held in trust by the government. In law, most communities are granted only general man-agement rights. With some exceptions, however, subsistence rights to

water and forests are protected for communities while rights to wildlife for subsistence purposes show greater variation and are fully guaran-teed in only 6 procedures. Seven procedures allow for subsistence use of certain minerals for building resources (e.g., sand and gravel). Rights to hydrocarbons are not granted to any communities on a subsistence or commercial basis through the formalization of land rights.

Commercial rights to trees (forests), water, wildlife, minerals, and hydrocarbons almost universally require further government approval or licensing. The complexity of licensing requirements varies sig-nificantly among countries but permits and requisite forms are typically not well adapted for collective entities (as opposed to individuals or companies). Commercial uses of mineral resources, even at an artisanal level, is not possible or almost always requires meeting significant li-censing requirements, such as technical plans, fees, or forming a com-pany or cooperative.

Finally, alienation rights are inconsistent across procedures. In law, 5 of the 19 community procedures grant communities full rights to sell their land, 10 procedures did not give them any rights, and 4 proce-dures allow alienability with conditions or additional proceproce-dures. Four procedures fully grant communities the right to lease land, 6 procedures disallow leasing, with the remainder allowing leases in some circum-stances.

In practice, communities are not always able to exercise manage-ment and exclusion rights to the full extent allowed by law. Many communities are unable to exclude third parties from entering their land or to effectively control high-value natural resources targeted by external interests through legal and illegal means. This is linked to a lack of protection for the right to free, prior, and informed consent (FPIC).

Subsistence natural resource use rights, however, are generally protected the same in practice and law with some exceptions, typically due to encroachment by third parties or restrictions near conservation areas. In other cases, communities enjoy some resource rights for sub-sistence use even where the law is ambiguous or disallows such use, principally due to lack of enforcement of laws.

Commercial use of natural resources, however, is less likely to be exercised in practice than in law because of the difficulties obtaining the requisite licenses. Most communities that obtain this authorization and meet compliance requirements do so because of support from donor organizations (CIFOR, 2016).

Alienation rights are protected more or less in practice as compared to the law. Informal leasing, for example, occurs in Peru on a looser basis than the law provides. In contrast, in Mozambique, leasing is al-lowed by the law but does not commonly occur because implementing regulations have not been developed (Cabral and Norfolk, 2016;Rose, 2014).

3.2. Company land acquisition procedures 3.2.1. Preconditions and steps

There are legally-mandated preconditions for companies in all countries, such as registering with an investment agency. In several countries, foreign investors must meet specific certification require-ments or are barred from accessing the procedure. Further, for most of the 13 company procedures surveyed for this issue, companies can only access land in specific legal or geographic categories. In the Philippines, only alienable lands of the public domain may be subject to agricultural concessions.

In practice, companiesfind ways around restrictive preconditions related to nationality, such as registering a domestic subsidiary. Further, companies do not always meet preconditions associated with legal land classification because the classifications do not always reflect reality on the ground.

The number of procedural steps that companies face, and the number of government agencies involved are generally higher where national laws impose environmental licensing requirements as part of

(7)

Table 6 Steps in Company Land Acquisition Procedures in Law. NUMBER OF STEPS GOVERNMENT AGENCIES NUMBER OF STEPS THAT INCLUDE ENVIRONMENTAL LICENSING NUMBER OF STEPS INVOLVING SOME LEVEL OF COMMUNITY CONSULTATIONS a DOES PROCEDURE INCORPORATE STEPS TO ENSURE FPIC? COMMENTS b Cambodia: Economic Land Concession 14 –17 5– 75 –6 steps 0 steps No Open-ended steps Cameroon: Provisional Concessions on National Land 5– 7 5 0 steps 0 steps No ? Guyana: State Land Grant or Lease 6– 7 3 0 steps 0 steps No ? Indonesia: HGU Land Use Right/ Palm Oil Plantations 19 –26 22 8 steps 2 steps No ? Indonesia: HTI/Industrial Forests 14 9 8 steps 0 steps No ? Mozambique: DUAT Acquisition for Economic Purposes 11 –15 8– 13 0 steps 2– 3 steps Yes, but legal ambiguity Open-ended alternative steps Panama: Concessions for Tourist Investment 19 10 7 steps 0 steps No Open-ended alternative steps Papua New Guinea: Special Agriculture Business Lease 3 2 0 steps 1 step No Missing implementing regulations Peru: Rights to Forests on Classi fi ed Agricultural Land 28 11 5 steps 0 steps No Open-ended alternative steps Philippines: Lease of Agricultural Land of the Public Domain 9– 33 4– 10 0 steps 0– 19 steps Yes, if land is an ancestral domain Open-ended steps Tanzania: Granted Right of Occupancy/Derivative Right 4– 14 2– 5 0 steps 0– 5 steps Yes, but legal ambiguity Open-ended alternative steps Uganda: Freehold Land from District Land Board 8– 13 4 0 steps 0 steps No Open-ended steps Uganda: Grant/Leasehold from ULC 5– 7 2 0 steps 0– 1 step No Open-ended steps Averages (Low and High) 11.2 –15.6 6.7 –7.9 Median (Low and High) 9– 14 5– 7 Notes: a) Community consultations are noted here even if they do not rise to the level of free, prior, and informed consent. However, they are not includ ed if only the presence or participation of a leader or local authority is required or if only a general opportunity for oppositions to be expressed is given. This also does not count consultation steps required as part of environmental licensing (i.e., consultations on the environmental impacts of a project). b) Open-ended steps refer to steps that could continue inde fi nitely.

(8)

the land acquisition procedure or where community consultations are required (Table 6). Technical requirements, such as land valuation, soil maps, and land clearing permits, add further complexity.

Ten of the 13 procedures involve applications to government, while two procedures also incorporate a bidding process. Twelve procedures presume government ownership of the land in question, and except for any requisite community consultations, the burden of verifying third-party claims lies with the government. Only 6 company procedures, incorporate community consultation around land issues, and only 3 require companies to engage in FPIC procedures. In Papua New Guinea and Tanzania, if the land has customary owners, it must first be ac-quired by the government, which then leases it to the investor. No procedure requires resettlement of people living on the land prior to the acquisition.

In practice, the number of steps companies complete to acquire formal land rights varies significantly across companies, including across those operating in the same country. Some companies complete the process with fewer steps than the law requires by, for example, abridging community consultations or failing to notify relevant gov-ernment agencies. Other companies undertake more steps than estab-lished in law. This variation appears to depend on company willingness to engage with the requirements of the law or in meaningful community consultations.

3.2.2. Time and expense of the formalization process

National laws contain few provisions governing the time or cost of the 14 company procedures. As with communities, no procedure has an overall time frame established in law. Step-specific deadlines are also uncommon, with some exceptions. Time frames are typically specified only for notice or publication and for environmental licensing re-quirements.

In practice, the time it takes companies to acquire formal land rights generally ranges from a few months up to between two years andfive years (Table 7). Required environmental permitting and community consultations can be time-intensive. Processing applications and se-curing the necessary government approvals can also extend the acqui-sition time. Conversely, some companiesfind shortcuts by, for example, undertaking inadequate community consultations (e.g., a single meeting or approval from one community leader).

Companies are expected to bear the costs of land acquisitions in all 14 procedures, including the cost of surveying and other technical re-quirements. They are also generally expected to pay registration fees, although laws incentivizing investment occasionally exempt certain companies from these fees. Procedures that include bidding (Cambodia and the Philippines) require initial deposits as part of the bid. Initial rent payments may also be required.

Data on company financial expenses in practice are not readily available but the data collected suggest high expenses for obtaining land rights. They also show that costs vary significantly depending on how long the procedure takes, what licenses and environmental permits are needed, the size and scope of the project, and other factors. Where paid, the cost of bribes may also be significant. These costs, however, should be contextualized by the overall capacity of companies, the tax incentives and other benefits offered to companies, and the possibility of deducting some expenses as business expenses.

3.2.3. Duration of the right, requirements to maintain it, and revocability By law, most companies may only acquire land rights for limited terms. Seven of the 14 company procedures have a potential life of 50–100 years and four procedures, as well as domestic investors in Uganda, are unlimited (Table 8). The remaining procedures have am-biguous provisions on renewal.

In practice, most concessions in the countries examined were granted for the full duration allowed by law. In Mozambique, compa-nies may continue operating past the expiration of the two- orfive-year provisional grants, given lack of government monitoring and capacity Table

7 Company Land Acquisition Procedure in Practice. Source: Field research led by CIFOR, AsM Law O ffi ce, UCRT, and RRI. Sources: Cabral and Norfolk, 2016 ; Chiziane et al., 2015 ; Cleaver et al., 2010 ; CPI, 2016 ; Di Matteo and Schoneveld, 2016 ; German et al., 2013 ; Ghebru et al., 2015 ; Hanemann, 2016 ; IFC, 2016 ; Makwarimba and Ngowi, 2012 ; Mandamule, 2017 ; MITADER, 2018 ; Mozambique Council of Ministers Resolution 83/(2014) ; Mei and Alabrese, 2013 ; Oakland Institute, 2011 , and Olenasha, 2013 . PROCEDURE NUMBER OF STEPS GOV. AGENCIES COST IN TIME SIZE OF LAND (HA) DURATION OF RIGHTS CONDITIONS Guyana: State Land Grant or Lease 11 –15* 3* 1 year –“ much longer ” ?2 5– 50 years Yes Indonesia: HGU Land Use Right/Palm Oil Plantations 18 –25 24 3– 5 years 100,000+ 35 years Yes Indonesia: HTI/Industrial Forests 13 10 1.5 –2 years 150,000+ 60 years Yes Mozambique: DUAT Acquisition for Economic Purposes 8– 13 Insu ffi cient data 3 months – 5+ years 3,56,000 50 years (de fi nitive DUATs) Yes Peru: Rights to Forests on Classi fi ed Agricultural Land 38 13 30 days – 3 years ? N/A Yes Tanzania: Granted Right of Occupancy/ Derivative Right 9– 20 60,000+ 99 years Yes Note: *Limited sources; data accuracy is limited.

(9)

to issue long-term definitive grants (Chiziane et al., 2015;CPI, 2016). National laws impose conditions on all company procedures, except freehold title in Uganda where imposing conditions is discretionary. Eleven of the 14 procedures include mandatory conditions to develop the land with a majority defining development subjectively around the company’s own development plan or contract obligations. The others use objective criteria with development defined in law. Other condi-tions include payment of rent, completion of technical requirements, implementation of community or small-holder projects, or compliance with environmental or other laws. Violating certain conditions can re-sult in revocation of the right for all 14 company procedures.

In practice, where companies breach conditions of a land grant, revocations of the land rights are inconsistent. Rights are sometimes revoked, often where projects have been abandoned. In some countries, revocations are made in response to public outcry, or are politically driven, instead of being based on systematic monitoring (Chiziane et al., 2015;Land Matrix, 2018;Mandamule, 2017). Governments may also negotiate with companies instead of revoking rights, by reducing concession size or allowing revisions to the development plan. 3.2.4. Scope of the rights granted

Eight of the 14 company procedures do not impose a numeric cap on the amount of land that investors may acquire (in Tanzania the law instructs a cap to be imposed by as yet unwritten regulations). Five procedures do impose specific caps, ranging from 500 ha for individual citizen investors in the Philippines up to 150,000 ha (in two 75,000-hectare plantations) for industrial forests in Indonesia. Panama restricts tourist concessions from exceeding a certain percentage of the land on an island.

Laws do not always clearly prohibit companies from evading these size limitations by combining multiple concessions or using creative ownership structures, such as shell companies. Only the three proce-dures in Indonesian and Cambodia restrict companies from combining multiple concessions. In practice, the laws are not effectively enforced. Caps on concession size are avoided by companies applying for multiple concessions or by creating subsidiaries.

In law, full management rights are granted to companies almost universally, excepting environmental and social regulations (restric-tions exist on clearing forests in some countries). Exclusion rights are also fully granted in the 14 procedures, although in some instances there are strong easement requirements mandating access to water or other subsistence resources for neighboring communities.

The rights to commercial use of water and wildlife are typically governed by separate legal frameworks but are available subject to a permitting process for most procedures. The granting of forest rights, however, varies significantly; the right is stronger where the underlying procedure is linked specifically to forestry operations. As with com-munities, investor commercial rights over minerals and hydrocarbons are limited and generally require the company to have the needed ex-pertise and complete the proper licensing processes.

Alienation rights for sale or transfer and for lease or sublease are fully granted in law for 6 of the 14 procedures. Transfer rights are only fully denied for industrial forests in Indonesia, and lease rights are fully denied for the Mozambique procedure and industrial forests in Indonesia. Several procedures allow alienation subject to government authorization. Laws that restrict alienation do not generally prevent the company holding the land rights to transfer shares, leaving a loophole by which companies may effectively transfer land, even where there are legal limitations on alienability.

In practice, companies enjoy strong management, exclusion, with-drawal, and alienation rights. The rights to use and withdraw natural resources on the land are occasionally exercised more freely than pro-vided in law, especially for timber extraction. However, the data also indicate significant variations, depending on the capacities of the company and whether it undertakes good-faith efforts to comply with permitting regulations. Some companies in Mozambique and Indonesia

Table 8 Duration of Company Land Acquisition Procedures in Law. Source: WRI PROCEDURE MAXIMUM TERM RENEWAL AND TERM OF RENEWAL TOTAL TERM IF RENEWAL GRANTED DEVELOPMENT CONDITION? Cambodia: Economic Land Concession 50 years (reduced in 2011) Once, 50 years (possible 99 year cap) 99 –100 years Yes (objective) Cameroon: Provisional Concessions on National Land 5 years (provisional) Yes (extended or converted) No limit Yes (subjective) Côte d’ Ivoire: Emphyteutic Lease 18 –99 years Yes, unclear time Unclear Yes (objective) Guyana: State Land Grant or Lease 99 years No; exceptionally 1 year 99 –100 years Yes (objective) Indonesia: HGU Land Use Right/Palm Oil Plantations 35 years Once, 25 years 60 years Yes (subjective) Indonesia: HTI/Industrial Forests 60 years Once, 35 years 95 years Yes (subjective) Mozambique: DUAT Acquisition for Economic Purposes 2 (foreign) or 5 (domestic) years (provisional) De fi nitive, 50 years (renew once) 100 years Yes (subjective) Panama: Concessions for Tourist Investment 40 –60 years Once, 30 years 90 years Yes (subjective) Papua New Guinea: Special Agriculture Business Lease 99 years Not speci fi ed Unclear No Peru: Rights to Forests on Classi fi ed Agricultural Land No limit N/A No limit Yes (subjective) Philippines: Lease of Agricultural Land of the Public Domain 25 years Once, 25 years 50 years Yes (objective) Tanzania: Granted Right of Occupancy/Derivative Right 98 –99 years Yes, no limit No limit Yes (subjective) Uganda: Freehold Land from District Land Board No limit N/A No limit No Uganda: Grant/Leasehold from ULC 99 years (foreign); none (domestic) Not speci fi ed (foreign), N/A (domestic) Unclear (foreign), None (domestic) No

(10)

avoid legal restrictions on selling or transferring land by transferring shares in the holding company. Informal extralegal leases are also common in Mozambique.

4. Comparing community and company procedures

The data collected on community and company procedures across three continents yieldfive significant findings, which highlight the in-equality between community and company procedures.

4.1. Community procedures are burdensome and inaccessible

In formalizing customary land rights, communities face complex and sometimes insurmountable legal, technical, and evidentiary re-quirements. For example, in Indonesia, Indigenous Peoples mustfirst lobby their regional legislature for formal recognition of their in-digenous status. In Chile, inin-digenous communities are not eligible for the procedure unless they possess a specified historic document. And in Uganda, communities must incorporate themselves into an association, elect officers, and write a constitution. In addition, formalization pro-cedures are rarely transparent. Communities are not always able to correct or contest government errors, obtain information, or find out why applications are delayed or rejected. They also may be excluded from crucial steps in the process such as boundary mapping. Procedures are often complicated by third parties who claim competing rights to the land, or due to border conflicts. These disputes are not well ad-dressed in law or in practice and may effectively halt the process. 4.2. With formalization, most communities must forfeit some customary land, lose certain customary rights, and accept new risks

In most research countries, significant areas of customary land may be excluded in certificates or titles granted to communities. For ex-ample, some communities cannot formalize any forested land, while others must exclude areas of land claimed by third parties. In addition, for all but one procedure assessed in practice, government officials impose arbitrary caps on the size of land granted to communities. Communities also do not receive full rights over the natural resources on their land. Governments retain the right to allocate overlapping concessions to high-value resources, such as timber, wildlife for trophy hunting, minerals and hydrocarbons,3and communities only had rights to exercise full FPIC to these transactions in 2 out of the 19 community procedures.

4.3. Procedures are generally more challenging for communities than companies

Community procedures generally take years to decades to complete, while land acquisition procedures for companies typically range from one month to five years. Many communities are unable to formalize their land, sometimes after decades of efforts. Company procedures can be complex due to environmental licensing or other permitting re-quirements, but these generally relate to commercial operations on the land rather than the underlying land rights. In contrast, when it comes to screening for and resolving competing claims to the land, commu-nities are subject to stricter standards. All community procedures re-quire a screening for third-party rights, and such third-party claims in

practice often prevent a community from successfully formalizing its land. By contrast, only 6 of the 14 corporate land acquisition proce-dures surveyed for this report require any form of community con-sultation, and only 3 of those contain provisions protecting commu-nities’ rights to FPIC. Instead, the law presumes that the government owns the land or has the right to give it away.

4.4. Community rights are restricted in practice, but companies have expanded opportunities, especially if they do not have strong social and environmental commitments

The legal community land formalization procedures are narrow and offer little flexibility and, in practice, a lack of resources and capacity means most communities have only one opportunity (if any) to for-malize their land. Similarly, in exercising rights over natural resources, communities are seldom able to realize those rights to the full extent allowed by the law. In contrast, for companies, land acquisition is fa-cilitated by a range of legal alternatives, as well as quasilegal, extra-legal, and illegal measures. Company engagement with key steps in the process, such as community consultations, varies widely. Across coun-tries, some companies exploit natural resources to which they have not legally been granted rights, and revocations of land rights when com-panies fail to meet conditions or comply with the law are inconsistent. These companies therefore have a competitive advantage in obtaining formal land rights against both communities and those companies that comply with legal and social or environmental standards.

4.5. Regulatory and policy frameworks favor investors over community formalization procedures

Communities receive inadequate and sporadic support from their government, compared to dedicated and sustained support for in-vestors. Companies often benefit from dedicated government invest-ment centers and recruitinvest-ment efforts, whereas governinvest-ment community land formalization programs are often under-resourced and im-plemented inconsistently. Some countries lack the requisite public in-stitutions to formalize customary land rights. In Uganda, government entities responsible for approving key steps have not been established, making implementation of the procedure impossible in some regions. Many communities that have formalized their land rights received ex-ternal support, often from CSOs or NGOs. Finally, in some countries, political and economic elites have successfully undermined community land formalization efforts that threaten their interests. As noted, boundary conflicts between communities and competing third-party claims are primary sources of delays and increased costs during com-munity land formalization. Unfair or inadequate dispute resolution procedures allow commercial interests or local elites to prevent com-munity land from being formalized.

5. Conclusion

In comparing the complexity of community and company proce-dures, the research uncovered several key distinctions, to the benefit of foreign corporations. This is the opposite of what might be expected, given that communities are seeking to formalize long-standing cus-tomary rights, which in some countries already have the force of law, while companies are applying to obtain new rights. The research highlights significant procedural challenges, encoded in the law and realized in practice, to communities obtaining formal land rights. It also highlights inequalities in how regulatory frameworks and im-plementing actors treat community procedures as compared to com-pany land acquisition procedures. There are many implications for governments, development agencies, companies, and communities, in-cluding the importance of clear, accessible procedures for communities to register and document their land rights; fair and accessible conflict resolution mechanisms to address competing third-party claims;

3

The rights to high-value, renewable and nonrenewable natural resources are commonly governed by separate laws and government agencies, distinct from those that govern community land. In many countries, national laws provide communities (which hold collectively-land rights) with rights to certain natural resources for subsistence purposes, but not for commercial use. Commercial use of high-value natural resources by communities almost universally requires specific government approval.

(11)

granting communities more rights to the variety of resources on their land; establishing avenues for communities to make complaints, appeal decisions, and request information about the status of their applica-tions; and establishing stronger monitoring and oversight of company behavior.

Acknowledgements

The authors would like to acknowledge several individuals for their valuable guidance, critical reviews, and research support, including Jon Anderson (independent consultant on rural development, natural re-source management and policy, and empowerment and poverty), Darragh Conway (Climate Focus), Penny Davies (Ford Foundation), David Kaimowitz (Ford Foundation), Caleb Stevens (U.S. Agency for International Development), and Nicholas Tagliarino (University of Groningen, Netherlands, and the Land Portal). At WRI, Dean Affandi, Celine Salcedo-La Viña, Rohini Chaturvedi, Fred Stolle, Rafael F. Barbieri, Mark Robinson, Daryl Ditz, and Laura Malaguzzi Valeri pro-vided valuable guidance and advice.

Christine Halvorson (Rainforest Foundation-United States), Tom Griffiths and Vanessa Jimenez (Forest Peoples Programme), and Laura George and Jean LaRose (Amerindian Peoples Association, Guyana) provided invaluable research support on Guyana.

WRI is indebted to the Climate and Land Use Alliance (CLUA) for its generousfinancial support.

This article represents the views of the authors alone. It does not necessarily represent the views of WRI, CIFOR, AsM Law Office, UCRT, RFUS, or the partners and affiliated networks of the RRI Coalition or their various funders. Nothing in this article constitutes legal advice, and the information contained in this report should not be relied upon to make decisions affecting legal rights.

References

Alden Wily, Liz, 2011a. The Global Land Rush: What This Means for Customary Land Rights. Rights to Resources in Crisis: Reviewing the Fate of Customary Tenure in Africa, Brief #5 of 5. Rights and Resources Initiative, Washington, DC (Accessed 5 August, 2019). https://dlc.dlib.indiana.edu/dlc/bitstream/handle/10535/7717/ global%20land%20rush.pdf.

Alden Wily, Liz, 2011b. Customary Land Tenure in the Modern World, Rights to Resources in Crisis: Reviewing the Fate of Customary Tenure in Africa, Brief #1 of 5. Rights and Resources Initiative, Washington, DC (Accessed 5 August, 2019). https:// rightsandresources.org/wp-content/exported-pdf/

rightstoresourcesincrisiscompiledenglish.pdf.

Alden Wily, Liz, 2011c. The Tragedy of Public Lands: the Fate of the Commons Under Global Commercial Pressure. International Land Coalition, Rome, Italy (Accessed 5 August, 2019). http://www.landcoalition.org/sites/default/files/documents/ resources/WILY_Commons_web_11.03.11.pdf.

Alden Wily, Liz, 2017. Customary tenure: remaking property for the 21st century. In: Graziadei, M., Smith, L. (Eds.), Comparative Property Law: Global Perspectives. Edward Elgar, Cheltenham, UK, pp. 458–478 2017.

Almås, Oda, Anselmo, Lawrence, George, Laura, Griffiths, Tom, Lunde, Solveig Firing, Rose, Jeanla, 2014. Indigenous Peoples’ Rights, Forests and Climate Policies in Guyana. Amerindian Peoples Association and Forest Peoples Programme., Georgetown, Guyana (Accessed 25 April 2018).http://www.forestpeoples.org/sites/ fpp/files/private/publication/2014/06/guyanaspecial-report-fpp-2014.pdf.

Amerindian Land Titling Project Board, 2016. A Guideline for Amerindian Land Titling in Guyana. Adopted by Ministry of Indigenous Peoples’ Affairs and United Nations Development Programme.

Anseeuw, Ward, Wily, Liz Alden, Cotula, Lorenzo, Taylor, Michael, 2011. Land Rights and the Rush for Land: Findings of the Global Commercial Pressures on Land Research Project. International Land Coalition (ILC)., Rome (Accessed 5 August, 2019).

https://www.landcoalition.org/sites/default/files/documents/resources/ILC% 20GSR%20report_ENG.pdf.

Atkinson, Sharon, Wilson, David, Da Silva, Andrew, Benjamin, Paul, Peters, Charles, Williams, Ignatius, Alfred, Roger, et al., 2016. Our Land, Our Life: A Participatory Assessment of the Land Tenure Situation of Indigenous Peoples in Guyana, Report for Region 1 and Region 2. Amerindian Peoples Association and Forest Peoples Programme, Georgetown, Guyana (Accessed 25 April 2018). http://www. forestpeoples.org/sites/fpp/files/publication/2016/12/fppguyanaltainternet.pdf. Blackman, Allen, Veit, Peter, 2018. Titled amazon indigenous communities cut Forest

carbon emissions. Ecological Economics, vol. 153(C. Elsevier, pp. 56–67. (Accessed 5 August, 2019). https://www.sciencedirect.com/science/article/pii/

S0921800917309746.

Blackman, Allen, Corral, Leonardo, Lima, Eirivelthon Santos, Asner, Gregory P., 2017.

Titling indigenous communities protects forests in the peruvian Amazon. PNAS 114 (16), 4123–4128. (Accessed 5 August, 2019). http://www.pnas.org/content/pnas/ 114/16/4123.full.pdf.

Bledsoe, David, 2006. Can Land titling and registration reduce poverty? In: Bruce, John W., Giovarelli, Renée, Rolfes, LeonardJr., Bledsoe, David, Mitchell, Robert (Eds.), Land Law Reform: Achieving Development Policy Objectives. World Bank, Washington, DC (Accessed 5 August, 2019). http://documents.worldbank.org/ curated/en/786221468175470235/pdf/374480Land0law01PUBLIC1.pdf. Bray, David Barton, Antinori, Camille, Torres-Rojo, Juan Manuel, 2006. The Mexican

Model of Community Forest Management: The Role of Agrarian Policy, Forest Policy and Entrepreneurial Organization. For. Policy Econ. 8, 470–484. (Accessed 5 August, 2019). http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.572.5105& rep=rep1&type=pdf.

Byamugisha, Frank, Fulgence, K., 2013. Securing Africa’s Land for Shared Prosperity: A Program to Scale up Reforms and Investments. World Bank, Washington, DC (Accessed 25 April 2018). http://documents.worldbank.org/curated/en/ 732661468191967924/Securing-Africas-land-for-shared-prosperitya-program-to-scale-up-reforms-and-investments.

Cabral, L.ídia, Norfolk, Simon, 2016. Inclusive Land Governance in Mozambique: Good Law, Bad Politics? Institute of Development Studies, Brighton, United Kingdom. Working Paper, Volume 2016, No. 478.https://opendocs.ids.ac.uk/opendocs/ bitstream/handle/123456789/12187/Wp478.pdf. (Accessed 25 April 2018). Chimhowu, Admos., 2019. The‘new’ African customary land tenure. Characteristic,

features and policy implications of a new paradigm. Land Use Policy 81 (February 2019), 897–903. (Accessed August 5 2019). https://www.sciencedirect.com/ science/article/pii/S0264837717310207.

Chiziane, Eduardo, Gift, Renée, Kibugi, Robert, Andrew Wardell, D., Segger, Marie-Claire Cordonier, Haywood, Caroline, 2015. Legal Frameworks Enabling Sustainable Land-Use Investment in Mozambique. CIFOR, Bogor, Indonesia. Working Paper 193http:// www.cifor.org/publications/pdf_files/WPapers/WP193Wardell.pdf. (Accessed 25 April 2018).

CIFOR (Center for International Forestry Research), 2016. What’s in a land title? Forest News(October 6) (Accessed 25 April 2018). https://forestsnews.cifor.org/44493/ whats-in-a-land-title?fnl=en.

Cleaver, Jacqueline, Schram, Rommert, Wanga, Godwil, 2010. Bioenergy in Tanzania: The Country Context.” in Bioenergy and Food Security: the BEFS Analysis for Tanzania, edited by Irini Maltsoglou and Yasmeen Khwaja. Food and Agriculture Organization of the United Nations, Rome, Italy, pp. 23–43. (Accessed 25 April 2018). http://www.fao.org/docrep/012/i1544e/i1544e.pdf.

CPI (Centro de Promoção de Investimentos), 2016. Laws and Regulations, 2016. (Accessed 25 April 2018). https://www.cpi.co.mz/assets/laws-andregulations-for-fdi-2016.pdf.

De Schutter, Olivier, 2011. How not to think of land-grabbing: three critiques of large-scale investments in farmland. J. Peasant Stud. 38 (2), 249–279.https://doi.org/10. 1080/03066150.2011.559008.(Accessed August 5, 2019). https://wedocs.unep. org/bitstream/handle/20.500.11822/18219/How_not_to_think_of_landgrabbing_ three_critiq.pdf?sequence=1&isAllowed=y.

De Wit, Paul, Norfolk, Simon, 2010. Recognizing Rights to Natural Resources in Mozambique. Rights and Resources Initiative, Washington, DC (Accessed 25 April 2018). http://www.rightsandresources.org/wp-content/exportedpdf/

mozambiquereportaug11.pdf.

Deininger, Klaus., 2003. Land Policies for Growth and Poverty Reduction. Policy Research Report 26384. World Bank, Washington, DC (Accessed August 5, 2019). http:// documents.worldbank.org/curated/en/485171468309336484/pdf/multi0page.pdf. Deininger, Klaus, Feder, Gershon, 2009. Land Registration, Governance, and

Development: Evidence and Implications for Policy. World Bank, Washington, DC (Accessed August 5, 2019). http://documents.worldbank.org/curated/en/ 869031468150595587/pdf/767960JRN0WBRO00Box374387B00PUBLIC0.pdf. Di Matteo, Filipe, Schoneveld, George Christoffel, 2016. Agricultural Investments in

Mozambique. Center for International Forestry Research, Bogor, Indonesia. Working Paper 201.http://www.cifor.org/publications/pdf_files/WPapers/

WP201Schoneveld.pdf. (Accessed 25 April 2018).

Ding, Helen, Faruqi, Sofia, Wu, Andrew, Altamirano, Juan-Carlos, Ortega, Andrés Anchondo, Cristales, RenéZamora, Chazdon, Robin, et al., 2017. Roots of Prosperity: The Economics and Finance of Restoring Land. World Resources Institute, Washington, DC (Accessed August 5, 2019). https://www.wri.org/sites/default/ files/roots-of-prosperity.pdf.

Donovan, Richard Z., Moore, Keith, Stern, Margaret, 2012. Verification of Progress Related to Indicators for the Guyana-Norway REDD+ Agreement, 2nd Verification Audit Covering the Period October 1, 2010–June 20, 2012, Final Report. Rainforest Alliance, Richmond, Vermont (Accessed 25 April 2018). http://www.forestpeoples. org/sites/fpp/files/news/2013/03/Rainforest_Alliance_NorwayGuyana_

ReddAgreement_2013.pdf.

Fairley, Elizabeth., 2012. Upholding Customary Land Rights Through Formalization: Evidence From Tanzania’s program of Land Reform. Paper presented at the World Bank Land and Poverty Conference, World Bank, Washington, DC. April 23–26.

http://www.landandpoverty.com/agenda/pdfs/paper/fairley_full_paper.pdf. (Accessed 25 April 2018).

German, Laura, Schoneveld, George, Mwangi, Esther, 2013. Contemporary processes of large-scale land acquisition in SubSaharan Africa: legal deficiency or elite capture of the rule of law? World Dev. 48, 1–18. (Accessed 25 April 2018). https://www. commdev.org/userfiles/Contemporary%20processes%20of%20land%20acquisition. pdf.

Ghebru, Hosaena, Pitoro, Raul, Woldeyohannes, Sileshi, 2015. Customary Tenure and Innovative Measures of Safeguarding Land Rights in Africa.” Discussion Paper 01484. International Food Policy Research Institute, Washington, DC (Accessed 25 April

(12)

2018). http://ebrary.ifpri.org/cdm/ref/collection/p15738coll2/id/129826. GOG/OP (Government of Guyana, Office of the President), 2010. LowCarbon

Development Strategy: Transforming Guyana’s Economy While Combating Climate Change. Office of the President, Republic of Guyana, Georgetown, Guyana (Accessed 25 April 2018). https://www.scribd.com/document/100974464/Low-Carbon-Development-Strategy-May-2010.

Guerra, Ernesto Herrera., 2015. Protecting Forests, Improving Livelihoods:Community Forestry in Mexico. FERN, Brussels, Belgium (Accessed August 5, 2019). http://fern. org/node/198.

Hanemann, L.Patrick, 2016. Costs of Compliance: Principal Constraints to Investment in Mozambique. U.S. Agency for International Development (USAID)/Support Program for Economic and Enterprise Development (SPEED). USAID-Mozambique, Maputo, Mozambique (Accessed 25 April 2018). https://www.growafrica.com/file/2016-speed-report-031-cost-complianceagriculture-enpdf.

Hodgdon, Benjamin, Monzón, Rudy, 2017. Smallholder Forestry Creating Benefits at Scale: The Case of the Quiche Forestry Association, Guatemala. Rainforest Alliance., New York (Accessed August 5, 2019). http://www.usaid-cncg.org/wp-content/ uploads/2017/02/AFORQ-Ingles-Digital.pdf.

Hodgdon, Benjamin D., Chapela, Francisco, Bray, David B., 2013. Mexican Community Forestry: Enterprises and Associations As a Response to Barriers. Center for People and Forests, Rights and Resources Initiative, and Rainforest Alliance, New York (Accessed August 5, 2019). https://www.rainforest-alliance.org/sites/default/files/ 2016-08/Mexicancommunity-forestry.pdf.

IFC (International Finance Corporation), 2016. IFC Project Information, Portucel Moz. July 20.https://disclosures.ifc.org/#/projectDetail/ESRS/32522. (Accessed 25 April 2018). .

Knight, Rachael, 2012. Empowering Communities to Document and Protect Their Land Claims: a Solution to the Global Land Grab? TerraNullius (blog) July 19.https:// terra0nullius.wordpress.com/2012/07/19/empowering-communities-to-document-and-protecttheir-land-claims-a-potential-solution-to-the-global-land-grab. (Accessed August 5, 2019). .

Knight, Rachael, Adoko, Judy, Auma Eilu, Theresa, 2013. Protecting Community Lands and Resources: Evidence From Uganda. Land and Equity Movement in Uganda, United Nation International Development Law Organization, and Namati, Rome, Italy (Accessed 25 April 2018). http://namati.org/wp-content/uploads/2013/05/10-namati-uganda-report-exec-summary-mr.pdf.

Land Matrix, 2018. Land Matrix: The Online Public Database on Land Deals. (Accessed 25 April 2018). http://www.landmatrix.org/en/get-the-idea/dynamics-overview. Makwarimba, Melissa, Ngowi, Prosper, 2012. Making Land Investment Work for

Tanzania: Final Report March 2012. Tanzania Natural Resource Forum, International Institute for Environment and Development, and Research on Poverty Alleviation, Arusha, Tanzania (Accessed 25 April 2018). https://tnrf.org/LBI-report.pdf. Mandamule, Uacitissa, 2017. Land registration, agricultural production and food security

in Mozambique. In: Paper Presented at the World Bank Land and Poverty Conference. World Bank, Washington, DC, March 20–24. . (Accessed 25 April 2018).. https:// www.conftool.com/landandpoverty2017/index.php?page=browseSessions&form_ session=639.

Mei, Giorgia, Alabrese, Mariagrazia, 2013. Communities’ Ability in Consultations and Land Transactions: Improving the“Empowering Effect” of Tenure Security Initiatives in Rural Mozambique. Paper presented at the World Bank Land and Poverty Conference, World Bank, Washington, DC. April 8–11. https://namati.org/wp-content/uploads/2017/04/Mei-2013_Mozamb-Comm-land-CaseSts.pdf. (Accessed 25 April 2018).

MITADER (Ministério da Terra, Ambiente e Desenvolvimento Rural), 2018. Processo

Simplificado De Autorização Do Direito De Uso E Aproveitamento Da Terra (DUAT). (Accessed 25 April 2018). http://mitader.info/atendiment.

Mozambique Council of Ministers Resolution 83, 2014. Autoriza Provisoriamente O Pedido Da Empresa ATFC (Moçambique) II Madeiras E Agricultura, Limitada, De Aquisição Do Direito De Uso E Aproveitamento Da Terra, Relativo a Uma Área De 107.492,78 Hectares, Localizada Nos Postos Administrativos De Regone E Mulumbo– Sede, Nos Distritos De Namarroi E Mulumbo, Província Da Zambézia, Destinada a Silvicultura (plantação De Eucalipto), Agricultura E Pecuária. Boletim Da Repúlica, 2nd Supplement, Series 1 Number 1, 23 December 2014.

Oakland Institute, 2011. Understanding Land Investment Deals in Africa, Country Report: Mozambique. Oakland Institute, Oakland, California (Accessed 25 April 2018).

https://www.oaklandinstitute.org/sites/oaklandinstitute.org/files/OI_country_ report_mozambique_0.pdf.

Olenasha, William Tate, 2013. Legal Tools for Citizen Empowerment: A Guide to the Laws Governing Land and Investment in Tanzania. Tanzania Natural Resource Forum and Institute for Environment and Development, Arusha, Tanzania (Accessed 25 April 2018). http://pubs.iied.org/pdfs/G03680.pdf.

Pearce, Fred., 2016. Common Ground: Securing Land Rights and Safeguarding the Earth.” Oxfam, International Land Coalition, and Rights and Resources Initiative. Oxfam International., Oxford, United Kingdom . (Accessed 25 April 2018). http://www. oxfamamerica.org/static/media/files/GCA_REPORT_EN_FINAL.pdf.

Quan, Julian, Monteiro, José, Mole, Paulo, 2013. The experience of Mozambique’s Community Land initiative (iTC) in securing Land rights and improving Community Land use. Paper Presented at the World Bank Land and Poverty Conference, World Bank, Washington, DC, April 8–11 (Accessed 25 April 2018).http://gala.gre.ac.uk/ 13137/1/13137_Quan_The_experience_of_Mozambiques_community_(conf_paper) _2013.pdf.

Rose, Ian M., 2014. Analysis of Proposed Regulation on‘Cessão De Exploração’” (draft). U.S. Agency for International Development (USAID)/Support Program for Economic and Enterprise Development (SPEED). USAID, Washington, DC (Accessed 25 April 2018). http://www.speed-program.com/wp-content/uploads/2014/06/2014- SPEED-Report-008-Analysisof-Proposed-Regulation-on-%E2%80%9CCess%C3%A3o-deExplora%C3%A7%C3%A3o%E2%80%9D-EN.pdf.

RRI, 2017. Securing Community Land Rights: Priorities and Opportunities to Advance Climate and Sustainable Development Goals. RRI., Washington, DC (Accessed August 5, 2019). https://rightsandresources.org/wp-content/uploads/2017/09/Stockholm-Prorities-and-Opportunities-Brief.pdf.

RRI (Rights and Resources Initiative), 2015. Who Owns the World’s Land? A Global Baseline of Formally Recognized Indigenous and Community Land Rights. RRI, Washington, DC (Accessed 25 April 2018). http://www.rightsandresources.org/wp-content/uploads/GlobalBaseline_web.pdf.

Schreiber, Leon, 2017. Registering Rural Rights: Village Land Titling in Tanzania, 2008–2017. Woodrow Wilson School of Public and International Affairs, Princeton, New Jersey (Accessed 25 April 2018). https://successfulsocieties.princeton.edu/ sites/successfulsocieties/files/LS_Tanzania_Land_GC.pdf.

TFCG (Tanzania Forest Conservation Group), 2015. Securing Village Land Certificates and Acquisition of Certificates of Customary Right of Occupancy: A Case Study of 10 Villages in Kilosa, Mpwapwa, Lindi and Rufiji Districts. Technical Report 50. Dar es Salaam, Tanzania: TFCG (Accessed 25 April 2018). http://www.tfcg.org/pdf/ TFCG%20Village%20Land%20Tenure%20Report%202015%20FINAL.pdf.

World Bank, 2017. Enabling the Business of Agriculture 2017. World Bank, Washington, DC.

World Bank, 2018. Doing Business 2018: Reforming to Create Jobs. World Bank, Washington, DC (Accessed 25 April 2018). http://www.doingbusiness.org.

Referenties

GERELATEERDE DOCUMENTEN

Prepare for the constructions phase on the political, technical and operational levels Continue close cooperation with Poland and Finland. Become an integral part of the European

Description of the processes means that the employees evaluate the customers of the company, what kind of products they deliver to their customers, what kind of product does not

AE: Adverse event; APACHE II: Acute Physiology and Chronic Health Evaluation II; BWSTT: Body weight-supported treadmill training; CRF: Case record form; DEMMI: de Morton Mobility

Because ESM is mainly a way to promote reinsertion, we will describe some general notes about reinsertion for young homeless people in the four participating countries (chapter 3).

Findings in Desari toll road development regarding type of compensation scheme and land acquisition techniques that would lead to a fair and affordable compensation can

Laparotomy / Intrauterine Balloon TRANEXAMIC ACID = 1 g, IV, SLOW INFUSION (100mg\min).. RETAINED PLACENTA. 30-45 min after delivery

 Maintain international momentum towards implementation of global climate ocean observing systems needed to go beyond ENSO based forecasts and attribution studies (Argo,

41 Obviously, overall development is a desirable goal for poor countries such as Ethiopia, with low GDP, poor facilities, a lack of legal security, massive poverty, no welfare