37
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

SPIN ® INJECTIE TECHNOLOGIE

VERLEGT DE GRENZEN VAN IN SITU BODEMSANERING :

THEORIE EN CASE STUDIES

OVAM STUDIENAMIDDAG INNOVATIE, MECHELEN - 10/03/2020

(2)

Overzicht

INLEIDING: theoretische achtergrond

CASE 1: Lage permeabiliteit, schuin

(KORTRIJK, BE)

CASE 2: Eolische leem

(ANDERLECHT, BE)

CASE 3: Heterogene aquifer

(VORST, BE)

CASE 4: Glauconiethoudend zand

(SCHOTEN,BE)

CASE 5: Mergel

(DIJON, FR)

CASE 6: Slurry “injectie” (deeltjes)

CASE 7: Maasgrind

(GENK, BE)

(3)

BODEM- SANERING

IN SITU

EXTRACTIE PROCESSEN

WATERFASE

GASFASE

MULTI-FASE

IMMOBILISATIE PROCESSEN

PRECIPITATIE

SORPTIE

DEGRADATIE PROCESSEN

BIOLOGISCH

CHEMISCH

EX SITU

INLEIDING: theoretische achtergrond

(4)

INLEIDING: theoretische achtergrond

RENDEMENT VAN “FYSISCHE” VERWIJDERINGSPROCESSEN

0 500 1000 1500 2000 2500 3000

0,001 0,01 0,1 1 10 100 1000 10000 100000

Kostprijs (€/kg vuilvracht)

Concentratie (mg/L) 0

500 1000 1500 2000 2500 3000

0,001 0,01 0,1 1 10 100 1000 10000 100000

Kostprijs (€/kg vuilvracht)

Concentratie (mg/L) 0

500 1000 1500 2000 2500 3000

0,001 0,01 0,1 1 10 100 1000 10000 100000

Kostprijs (€/kg vuilvracht)

Concentratie (mg/L)

Fysische verwijderingsprocessen

In situ immobilisatie- of afbraakprocessen

0 500 1000 1500 2000 2500 3000

0,001 0,01 0,1 1 10 100 1000 10000 100000

Kostprijs (€/kg vuilvracht)

Concentratie (mg/L)

Optimale saneringstraject = hoogste rendement

- ontgraving - pump & treat - multifase extractie - PLI & BLE

- thermisch - ISCO - ISCR

- BIO: ENA, bio-augmentatie - Precipitatie (zware metalen) - sorptie

RENDEMENT = GLOBALE SANERINGSEFFICIËNTIE

≈ (TOTALE KOSTPRIJS)-1

≈ (CO2-UITSTOOT)-1

(5)

INLEIDING: theoretische achtergrond

BODEM- SANERING

IN SITU

EXTRACTIE PROCESSEN

WATERFASE

GASFASE

MULTI-FASE

IMMOBILISATIE PROCESSEN

PRECIPITATIE

SORPTIE

DEGRADATIE PROCESSEN

BIOLOGISCH

CHEMISCH

EX SITU

BODEMSANERING GESTIMULEERD DOOR TOEDIENING VAN “REAGENTIA”

(6)

INLEIDING: theoretische achtergrond

“INJECTIE-GEBASEERDE” BODEMSANERING

FYSIEK CONTACT

BINNEN WERKINGSDUUR PRODUCT

VOLLEDIG FYSIEK CONTACT

= VOORWAARDE VOOR REACTIE

CSM

(7)

INLEIDING: theoretische achtergrond

CLOU VOOR “FYSIEK” CONTACT = INJECTIE IN BODEMPORIËN

Injection Window

INJECTIEDRUK

= SLEUTELPARAMETER VOOR VOLLEDIG CONTACT

Injectie “window” is functie van:

- bodemdiepte

- diepte onder grondwatertafel - poriëngrootte (= bodemtextuur)

!

(8)

INLEIDING: theoretische achtergrond

CONVENTIONELE INJECTIETECHNIEKEN

Injection Window

- Infiltratie / injectie op vaste filters - Recirculatie van grondwater

Injectiedruk meet- en regelbaar in functie van:

- Individuele bodemlaag/diepte - Diepte onder grondwaterniveau - Poriëngrootte (= bodemtextuur)

!

(9)

INLEIDING: theoretische achtergrond

CONVENTIONELE INJECTIETECHNIEKEN

Injection Window

- Infiltratie / injectie op vaste filters - Recirculatie van grondwater

- Soil mixing*

- Direct (push) injectie

Injectiedruk meet- en regelbaar in functie van:

- Individuele bodemlaag/diepte - Diepte onder grondwaterniveau - Poriëngrootte (= bodemtextuur)

(10)

Tot 2015:

Enige directe injectietechniek wereldwijd gebruikt

INLEIDING: theoretische achtergrond

CONVENTIONELE INJECTIETECHNIEKEN

(11)

D I R E C T P U S H : T H E O R I E

V S

P R A K T I J K

T O P - D O W N I N J E C T I E T H E O R I E

T O P - D O W N I N J E C T I E P R A K T I J K

BLOW-OUT LANGSHEEN INJECTIESTANGEN ONGEWENSTE FRACTURING

GEEFT AANLEIDING TOT KORTSLUITSTROMING VAN DE REAGENTIA PREFERENTIËLE FLUX NAAR EN

IN MEER DOORLATENDE BODEMLAGEN

INLEIDING: theoretische achtergrond

CONVENTIONELE INJECTIETECHNIEKEN

(12)

COMPACTIE VERSMERING

Porositeit ↘ thv injectie-openingen

 Permeabiliteit (Ksat) ↘↘ (factor 10-10.000)

INLEIDING: theoretische achtergrond

CONVENTIONELE INJECTIETECHNIEKEN

(13)

INLEIDING: theoretische achtergrond

CONVENTIONELE INJECTIETECHNIEKEN

Injection Window

- Infiltratie / injectie op vaste filters - Recirculatie van grondwater

- Soil mixing*

- Direct (push) injectie

Bodemlagen met hoogste capillaire druk (= fijnere texturen)

zijn meest onderhevig aan compactie…

Injectiedruk meet- en regelbaar in functie van:

!

- Individuele bodemlaag/diepte - Diepte onder grondwaterniveau - Poriëngrootte (= bodemtextuur)

(14)

COMPACTIE VERSMERING

KANAALVORMING

 PERMEABILITEIT (Ksat)↘↘

 PERMEABILITEIT (Ksat) ↗↗

+ Pinj ↗↗

Blow-out langsheen injectiestangen

INLEIDING: theoretische achtergrond

CONVENTIONELE INJECTIETECHNIEKEN

(15)

INLEIDING: theoretische achtergrond

CONVENTIONELE INJECTIETECHNIEKEN

(16)

INLEIDING: theoretische achtergrond

SPIN

®

INJECTIE TECHNOLOGIE

Injection Window

- Geen compactie thv injectie-openingen - Injectiedruk aanpasbaar in functie van:

- bodemdiepte ;

- diepte onder grondwatertafel ; - poriëngrootte (= bodemtextuur) !

Date Hour

Injection point Project_IP1 Start 10/09/2019 10:13:45 End 10/09/2019 16:32:16 SPIN INJECTION LOG

-18 -16 -14 -12 -10 -8 -6 -4 -2 0

0 500 1000 1500

Depth (m)

Total V (L)

0 200 400 600 800

Q (L/h)

0 2 4 6

P (bar)

0 250 500 750 1000

Ks,rel

(17)

• Injecteren bij lagere injectiedrukken

• Injecteren van grotere volumes

• Homogene en kwalitatieve verspreiding

• Efficienter en duurzaam gebruik van reagentia

• Injecteren over ganse diepte-interval

• Gedetailleerde logging en rapportage

• Real-time detectie van permeabiliteit bodemlagen

• Toegang tot kleinere ruimtes dankzij kleinere machine

• Injectie mogelijk op grotere dieptes en hardere bodemlagen

• Automatisch afdichten van injectiepunten

• Hoge graad van flexibiliteit (bottom-up, top-down,…)

INLEIDING: theoretische achtergrond

SPIN

®

INJECTIE TECHNOLOGIE: DE VOORDELEN

(18)

2016 2017 2018 2019 2020

FINALE DESIGN SPIN® INJECTIE

TECHNOLOGIE

NICOLE INNOVATION AWARD 2019

> 60 PROJECTEN IN EUROPA

> 20 VERSCHILLENDE BODEMTYPES

INLEIDING: theoretische achtergrond

(19)

CASE 1: Lage permeabiliteit, schuin

Locatie : actief staalverwerkingsbedrijf nabij Kortrijk, Belgium

Geologie : heterogeen, vnl. slecht doorlatende klei (Formatie van Kortrijk) Verontreiniging : VOCl, vnl. TCE (VDA: 3.500 mg/kg.ds; GW: 260.000 µg/L)

Uitdagingen : geologie, onbereikbare bronzone en midden in actieve productie Reagentia : 10% 3DMe® (Regenesis), 100 l/m, 4 m spacing

(20)

CASE 1: Lage permeabiliteit, schuin

(21)

CASE 1: Lage permeabiliteit, schuin

Project Kortrijk, BE

Vinj (l/m) 100

Pinj (bar) 1,8 / 3,8 / 2,0

Spacing (m) 4

ROIobserved (m) 1,5 / 5,0 / 2,5

ROIobserved : 1,5 m

ROIobserved : 5,0 m

ROIobserved : 2,5 m

(22)

CASE 1: Lage permeabiliteit, schuin

Project Kortrijk, BE

Vinj (l/m) 100

Pinj (bar) 1,8 / 3,8 / 2,0

Spacing (m) 4

ROIobserved (m) 1,5 / 5,0 / 2,5

(23)

CASE 2: Eolische leem

Locatie : voormalige lampenfabriek, nu residentieel Anderlecht (B) Geologie : homogene eolische leem (windafzetting)

Verontreiniging : VOCl, mainly PCE (17 mg/kg, 23.800 µg/L) langs oude riolering

Uitdagingen : geologie en residentiële omgeving

Reagentia : 10% ELS® (PeroxyChem) + 10% Brenntaplus VP1 (Brenntag), 200 l/m, 3 m

Voorkomen loess-belt in Belgium

(24)

CASE 2: Eolische leem

Project Anderlecht, BE

Vinj (l/m) 200

Pinj (bar) <0,5 / <1,5

Spacing (m) 3

ROIobserved (m) <1,8 / >1,8

ROIobserved : > 1,8 m

ROIobserved : < 1,8 m

(25)

CASE 3: Heterogene aquifer

Locatie : voormalige chemische site in Vorst (B) Geologie : heterogene afzettingen van de Zenne Verontreiniging : VOCl, vnl. PCE

Uitdagingen : heterogene geologie en voorkomen grind (?!)

Reagentia : 7% 3DMe® (Regenesis) + 7% Brenntaplus VP1 (Brenntag), 150 l/m

Gravel-SPIN ®

(26)

CASE 3: Heterogene aquifer

Date Hour

Injection point IP1 Start 20/08/2019 11:05:47 End 20/08/2019 16:03:25 SPIN INJECTION LOG

-14 -12 -10 -8 -6 -4 -2 0

0 500 1000 1500 2000

Depth (m)

Total V (L)

-14 -12 -10 -8 -6 -4 -2 0

0 500 1000 1500

Q (L/h)

-14 -12 -10 -8 -6 -4 -2 0

0 5 10

P (bar)

-14 -12 -10 -8 -6 -4 -2 0

0 250 500 750

Ks,rel

Project Vorst, BE

Vinj (l/m) 150

Pinj (bar) <2 / <5

Spacing (m) 3

ROIobserved (m) 1,5 / >3,0

ROIobserved: 1,6 – 1,7 m ROIobserved: 1,5 – 1,6 m ROIobserved: 1,6 – 1,7 m ROIobserved: 2,5 – 3,0 m

(27)

CASE 4: Glauconiethoudend zand

Locatie : voormalige metaalverwerking, momenteel baanwinkel in Schoten (B) Geologie : glauconiethoudend zand (mariene sedimenten: sand + glauconite) Verontreiniging : VOCl, vnl. TCE (26.000 µg/l)

Uitdagingen : geologie (glauconiet)

Reagentia : 10% ELS® (PeroxyChem) + 10% Brenntaplus VP1 (Brenntag), 200 l/m, 4 m

(28)

CASE 4: Glauconiethoudend zand

Injection point IP 10 Date Hour

Upper limit 2,0 m-bgl 23/01/2020 10:43:10

Lower limit 12,0 m-bgl 23/01/2020 13:07:09

Dosage 150 L/m 31/01/2020 17:22:49

SPIN ® INJECTION LOG

Start injection End injection Processing

0

2

4

6

8

10

12

0 500 1000 1500 2000

Cumulative volume (L)

0

2

4

6

8

10

12

0 5 10 15

Injection pressure (bar)

0

2

4

6

8

10

12

0 10 20 30

Injection flow rate (L/min)

0

2

4

6

8

10

12

0 5 10

Hydraulic conductivity (L/min.bar)

Project Schoten, BE

Vinj (l/m) 150

Pinj (bar) 2 => 10

Spacing (m) 2,5

ROIobserved (m) n.d.

(29)

CASE 4: Glauconiethoudend zand

Project Schoten, BE

Vinj (l/m) 150

Pinj (bar) 2 => 10

Spacing (m) 2,5

ROIobserved (m) n.d.

(30)

CASE 5: Mergel

Locatie : actieve industriële site nabij Dijon (Fr) Geologie : mergel (clay-CaCO3)

Verontreiniging : VOCl, relatief hoge flux

Uitdagingen : mergelrots  Gravel-SPIN®

Reagentia : water, full-scale EDS-ERTM (Tersus Env. LLC)

(31)

Injection point IP2 Date Hour

Upper limit 2,0 m-bgl 2/09/2019 8:48:03

Lower limit 9,0 m-bgl 2/09/2019 10:29:12

Dosage 50 L/m 5/02/2020 15:48:01

SPIN ® INJECTION LOG

Start injection End injection Processing

0

1

2

3

4

5

6

7

8

9

0 200 400 600

Cumulative volume (L)

0

1

2

3

4

5

6

7

8

9

0 2 4 6 8

Injection pressure (bar)

0

1

2

3

4

5

6

7

8

9

0 5 10

Injection flow rate (L/min)

0

1

2

3

4

5

6

7

8

9

0 2 4 6

Hydraulic conductivity (L/min.bar)

CASE 5: Mergel

Injection point IP2 3,74 m-bgl

Upper limit 2,0 m-bgl 9,18 bar

Lower limit 9,0 m-bgl 6,15 L/min

Dosage 50,0 L/m 1,28 L

Time step 10,00 #meas/sec 0,49 L

SPIN ® micro-Frac data

Depth Max. pressure Max. flow rate Total volume Average Ks,rel

0 1 2 3 4 5 6 7 8 9 10

0 50 100 150 200 250

Injection pressure (bar)

0 1 2 3 4 5 6 7

0 50 100 150 200 250

Injection flow rate (L/min)

0 0,2 0,4 0,6 0,8 1 1,2 1,4

0 50 100 150 200 250

Cumulative volume (L)

0 0,2 0,4 0,6 0,8 1 1,2 1,4

0 50 100 150 200 250

Relative hydraulic conductivity

Number of timesteps

Connectie gecreëerd naar naturlijkefracture

(32)

Injection point IP2 Date Hour

Upper limit 2,0 m-bgl 2/09/2019 8:48:03

Lower limit 9,0 m-bgl 2/09/2019 10:29:12

Dosage 50 L/m 5/02/2020 15:48:01

SPIN ® INJECTION LOG

Start injection End injection Processing

0

1

2

3

4

5

6

7

8

9

0 200 400 600

Cumulative volume (L)

0

1

2

3

4

5

6

7

8

9

0 2 4 6 8

Injection pressure (bar)

0

1

2

3

4

5

6

7

8

9

0 5 10

Injection flow rate (L/min)

0

1

2

3

4

5

6

7

8

9

0 2 4 6

Hydraulic conductivity (L/min.bar)

CASE 5: Mergel

Injection point IP2 4,3 m-bgl

Upper limit 2,0 m-bgl 1,51 bar

Lower limit 9,0 m-bgl 7,11 L/min

Dosage 50,0 L/m 4,78 L

Time step 10,00 #meas/sec 4,42 L

SPIN ® micro-Frac data

Depth Max. pressure Max. flow rate Total volume Average Ks,rel

0 0,2 0,4 0,6 0,8 1 1,2 1,4 1,6

0 50 100 150 200 250 300 350 400 450 500

Injection pressure (bar)

0 1 2 3 4 5 6 7 8

0 50 100 150 200 250 300 350 400 450 500

Injection flow rate (L/min)

0 1 2 3 4 5 6

0 50 100 150 200 250 300 350 400 450 500

Cumulative volume (L)

0 1 2 3 4 5 6 7 8

0 50 100 150 200 250 300 350 400 450 500

Relative hydraulic conductivity

Number of timesteps

Injectie in porositeit

(33)

Injection point IP2 Date Hour

Upper limit 2,0 m-bgl 2/09/2019 8:48:03

Lower limit 9,0 m-bgl 2/09/2019 10:29:12

Dosage 50 L/m 5/02/2020 15:48:01

SPIN ® INJECTION LOG

Start injection End injection Processing

0

1

2

3

4

5

6

7

8

9

0 200 400 600

Cumulative volume (L)

0

1

2

3

4

5

6

7

8

9

0 2 4 6 8

Injection pressure (bar)

0

1

2

3

4

5

6

7

8

9

0 5 10

Injection flow rate (L/min)

0

1

2

3

4

5

6

7

8

9

0 2 4 6

Hydraulic conductivity (L/min.bar)

CASE 5: Marlstone

Injection point IP2 8,63 m-bgl

Upper limit 2,0 m-bgl 10,00 bar

Lower limit 9,0 m-bgl 8,33 L/min

Dosage 50,0 L/m 3,29 L

Time step 5,00 #meas/sec Average Ks,rel 0,48 L

SPIN ® micro-Frac data

Depth Max. pressure Max. flow rate Total volume

0 2 4 6 8 10 12

0 50 100 150 200 250 300 350 400 450 500

Injection pressure (bar)

-1 0 1 2 3 4 5 6 7 8 9

0 50 100 150 200 250 300 350 400 450 500

Injection flow rate (L/min)

0 0,5 1 1,5 2 2,5 3 3,5

0 50 100 150 200 250 300 350 400 450 500

Cumulative volume (L)

-0,2 0 0,2 0,4 0,6 0,8 1 1,2 1,4

0 50 100 150 200 250 300 350 400 450 500

Relative hydraulic conductivity

Number of timesteps

Injectie in naturlijkefracture

(34)

CASE 6: Slurry “injectie” (deeltjes)

Wat is een slurry ? “Een half-vloeibaar mengsel,

typisch van fijne, vaste deeltjes gesuspendeerd in water”

Wat is bodem? “Reageert als een zandfilter

ontworpen om vaste deeltjes

uit een vloeistof te filteren”

(35)

CASE 6: Slurry “injectie” (deeltjes)

Injection point IP1 12,31 m-bgl

Upper limit 12,0 m-bgl 3,08 bar

Lower limit 20,0 m-bgl 17,33 L/min

Dosage 66,0 L/m 5,76 L

Time step 2,00 #meas/sec Average Ks,rel 4,28 (-)

SPIN ® micro-data

Depth Max. pressure Max. flow rate Total volume

0 0,5 1 1,5 2 2,5 3 3,5

0 10 20 30 40 50 60 70 80

Injection pressure (bar)

0 2 4 6 8 10 12 14 16 18 20

0 10 20 30 40 50 60 70 80

Injection flow rate (L/min)

0 1 2 3 4 5 6 7

0 10 20 30 40 50 60 70 80

Cumulative volume (L)

0 2 4 6 8 10 12

0 10 20 30 40 50 60 70 80

Relative hydraulic conductivity

Number of timesteps

Injection Window

!

Willen we “fracturen”?

(36)

CASE 7: Maasgrind

Locatie : actieve industriële site te Genk (Be) Geologie : rolkeien (silex) (Pleistoceen (Quartair)) Verontreiniging : nvt (proof of concept)

Uitdagingen : rolkeien  Gravel-SPIN® Reagentia : water

(37)

Vragen?

Injectis BV

Achterstraat 35 B-8790 Waregem Belgium

www.injectis.com

Dr. ir. Jeroen Vandenbruwane Managing director

jeroen@injectis.com Mob.: +32 474 36 85 45

Eng. Alexandre Engels Account manager alex@injectis.com

Mob.: +32 494 94 72 35

WINNER OF THE NICOLE INNOVATION

AWARD 2019

Referenties

GERELATEERDE DOCUMENTEN

Als je enkel afvalstoffen meehebt voor de betaalzone, mag je onmiddellijk doorrijden naar de betaalzone (zie stap 3) ‚ let wel: vooraleer afvalstoffen te lossen die. beperkt zijn

De eerste prijs eerste prijs eerste prijs van de OVAM Ecodesign Award 2015 voor studenten in de categorie 'eindwerken' eerste prijs in de categorie 'eindwerken' in de

• Deze zijn bepalend voor aanwezigheid en verspreiding van verontreiniging?. • Voor zinvolle resultaten en goed begrip van situatie zijn onderzoeksmethoden met

Contaminant adsorbed onto passive flux meter over time to get Mass flux (J).. Tracer desorbs from passive flux meter over time to get

Bij de bouw van de woningen in het plangebied moet rekening gehouden worden met de gevolgen van een toename van verhard en bebouwd oppervlak. Door deze verdere verstedelijking

Artikel 8.2 (en daarvan in het bijzonder artikel 8.2.2 van de bestemmingsplanregels) bevat de bouwregels waaraan moet worden voldaan. Daarvan zijn met name van belang de regels dat de

In de beantwoording van vraag 15 over welke keuze de gemeente heeft gemaakt op grond van de door Tauw 1 geconstateerde overschrijdingen en gemaakte aanbevelingen, meldt de

door Peter Wind - Vijf jaar geleden begon Let’s Gro als festival voor goede initiatieven en ideeën voor en door de stad..