2012 update of OPTA’s fixed and mobile BULRIC models
25 March 2013
Response to operator consultation Ref: 35097-52
.
Hele tekst
.
GERELATEERDE DOCUMENTEN
We propose that the cost model should be based on Option 2 (hypothetical existing operator) since this enables the model to determine a cost consistent with the existing suppliers
Model with MT traffic Expenditures with MT (asset, time) Output profile with MT (asset, time) Model without MT traffic Expenditures without MT (asset, time) Output profile
Urban 60% Analysys Mason estimate Suburban 65% Analysys Mason estimate Rural 70% Analysys Mason estimate Micro/indoor 70% Analysys Mason estimate RNC, in terms of E1
With regard to the comment on concept 22, we would observe that during the original model construction, five parties submitted that a maximum of four to five
Integration is not a single process but a multiple one, in which several very different forms of "integration" need to be achieved, into numerous specific social milieux
So, chromosome cohesion defects can result in premature sister chromatid separation, which bypasses the spindle assembly checkpoint and leads to incorrectly attached and
The aim of this study is to come to a fuller understanding of the present educational system of Bophuthatswana so as to ascertain whether this system of
This can obstruct the development of construction logistics calculation models because valid data regarding logistics flows are only known in a later stadium of the