PROJECTS

Flood Risk

S

everal months would be needed to repair the weir, which was originally built in 1929. It was therefore proposed to build a temporary dam blocking half of the river Meuse. However, the dam would result in a situation in which high river discharges would lead to higher waterlevels upstream of the weir and an in creased risk of flooding. In order to decide about the installation of this temporary structure, Rijkswaterstaat needed more information to make an assess ment and decide

whether the increased risk was acceptable. Deltares has an agreement with Rijks­ waterstaat to provide advice on a 24/7

basis in case of emergencies. The emer gency advice procedure is trained regular­ ly using scenarios. On 6 January 2017, the procedure was activated for the damaged weir near Grave with the aim of assessing the impact of the temporary dam. During the course of a weekend, a plan was drawn up for this assessment, discussed with Rijkswaterstaat and imple mented, and a team of experts reported on the outcomes. Normally, this process would have taken weeks or months. With the intensive deployment of experts and the full use of Deltares computational facilities, the work was completed within three days. This type of advice is only possible with an excellent knowledge base and model infrastructure.

Computations were completed for mul ­ tiple discharge intensities and multiple design options for the proposed temporary structure. Hundreds of simulations were made using 1D (SOBEK3) and 2D modelling (WAQUA). The results showed that, in bank­full conditions, water levels would rise half a metre by comparison with the reference

situation. However, at higher discharges, the effect of the dam was reduced: increases in the water level were smaller. The effect of the dam on the occurrence of threshold water levels (“code orange” or “code red”) was limited.

Rijkswaterstaat used the results in their decision about the acceptance of the risks associated with the temporary dam. Building work on the dam began on Tuesday, 10 January. Within two weeks, the operational level of the weir was re­ stored and shipping traffic on the Meuse and the Meuse­Waal canal resumed. This concluded the emergency advice proce dure. However, the reduced width of the Maas at the weir also resulted in increased flow velocities. Additional research was requested in a longer project to evaluate the flow velocities near the river bed, for which the CDF modelling in STARCCM+ was used. Given the results of this longer study, grouting was applied to the river bed and rock was placed in the river to prevent the scouring of the bed.

Contact

Jurjen de Jong, Jurjen.dejong@deltares.nl t +31 (0)6 1588 2154

Further reading:

Jurjen de Jong et al. (2017). Definitief memo Spoedadvies Stuw Grave. Available on https:// www.deltares.nl/en/publications/

On the evening of 29 December 2016, a ship collided with the

weir at Grave in the Netherlands. In darkness and thick fog,

the inland vessel Maria Valentina missed the entrance to the

lock, and collided with the operational weir, which suffered

extensive damage, making it impossible to maintain water

levels upstream. This made navigation impossible for

day-to-day shipping, not only on the River Meuse but also on the

connected Meuse-Waal canal.

Left: The damage to the weir near Grave, right:Temporary dam structure

EMERGENCY ADVICE FOR A

TEMPORARY DAM NEAR GRAVE

PROJECTS

Flood Risk

Referenties

GERELATEERDE DOCUMENTEN

len naar de tuinkamer, achter, die, toen de Marcussen hun intrek hadden genomen in Pension Staring, was ingericht voor zit~ en ~speelvertrek voor de drie kleintjes en

Thus, the comparison of the current opportunity to the missed opportunity and the difference in attractiveness between the two opportunities are crucial elements for inaction inertia

Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of

The research has been conducted in MEBV, which is the European headquarters for Medrad. The company is the global market leader of the diagnostic imaging and

The goal is to consistently emphasise the importance of nocturnal darkness in the Wadden Region and to take physical measures together to reduce light emissions and to facilitate

The vitamin C MUPS capsule formulations, with AVG and SLS as functional excipients, showed an improvement in transport across the intestinal epithelium compared

In this overview of the nature of the contemporary effective school principalship,, elements of wide-ranging diversity have been identified. The role of a principal is found to

In summary, the preference for a thick version can rely on five different grounds: (1) the wish to provide a shorthand for an ideal state, or a substantial part of it; (2) the view