• No results found

Entrance

N/A
N/A
Protected

Academic year: 2021

Share "Entrance"

Copied!
14
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)
(2)

Introduction

Society

(3)

Background

• Region Energy Valley

• Hanze Research Energy focus on:

“People in Power”

• Process: Open Innovation • RenQi

(4)

Route

• EnTranCe: link in the knowledge circulation • EnTranCe a facility with focus and process

Focus: People in Power Process: open innovation

• Partners responsible for innovation projects • Research multidisciplinary

• Hanze UAS develops education in the centre of this process

(5)

Model EnTranCe

• Hanze UAS invest in the facility

• Operational costs covered by projects • Project specific investments covered by

(6)

Time line

• Summer 2011 : first project proposal ‘FlexiNet Pro’ with partners

• January 2012, First official notification on Energy Valley New Years event, by Max van den Berg

• June 2012, first live presentation EnTranCe on Flexines “end symposium” • Augustus 2012 start construction activities phase 0

• September 2012 opening on the Energy Academy Europe • October 2012 Start First Projects

• October 2012 engineering phase 1

• November 2012 Housing Student Company Sameen • December 2012 starting Centre of Expertise Energy • January 2012 building phase 2

(7)

EnTranCe 2013

Building/demonstr ation So la r So la r W in d W in d D ec en tra liz ed B ala cin g D ec en tra liz ed B ala cin g Bio Energy

Bio Energy OtherOther

Sustai-nable Traffic Sustai-nable Traffic Sh ac k Sh ac k Algae / heat Algae / heat

(8)

Projects

• First projects • FlexiNet Pro • I-Balance • I-Share • TCN-Algae

(9)

FlexiNet Pro

• Decentralized conversion and storage to achieve an optimum in renewable energy usage.

• Technical/law/social & economical research

• Partners (18): Alliander, BAM, Dorhout advocaten, Gasterra, Gasunie, Hanze University of Applied Sciences Groningen, Hogeschool Arnhem Nijmegen, i-NRG, Imtech, KEMA, N.V. NOM, Nedap, TenneT, TNO, Trinergy, Ubbink, Westland Infra, Zonnedak

(10)

I-Balance

Aims:

• Decentralized balancing renewable energy • Using results FlexiNet Pro to achieve

decentralized balanced system for intermittent energy supply (wind/solar)

• Modelling, forecasting, case study

(11)

I-Share

Aims:

• Involvement society with energy

• Close collaboration Minerva (Art academy) • Target group city of Groningen

• Open resources of research results

• Building a validated database with measurement results off energy data

• Target groups: researchers, society (NGO)

(12)

TCN Algae

Aims:

• Sustainable residual heat Data Centres • Optimizing algae installations

(13)

What we offer

• Multi utility facility:

– R&D units

– Decentralized energy production

• Common PR

• Demonstration space

• Open innovation network • Short link students

• Apprenticeship

(14)

What we ask

• Endorse the vision • Commitment

– Support focus and process

– Active role in project development • Participate in projects

– Funding – Expertise Overall:

Referenties

GERELATEERDE DOCUMENTEN

The research described in this thesis was carried out at the Groningen Biomolecular Sciences and Biotechnology (GBB) institute and Zernike Institute of Advanced Materials of

At this point, signal recognition particle (SRP) and peptidyl- prolyl cis-trans isomerase trigger factor (TF) compete for binding the ribosome nascent chain 4,5. In

Pudendal neuropathy leads to impaired voluntary con- traction of the external anal sphincter and puborectal muscle, but this does not necessarily lead to complete faecal

shifted block GMRES method with inexact breakdowns for solving multi-shifted and multiple right-hand sides linear systems. Carpentieri,

Why ERS Early Career Members should attend the International Congress 2019 in Madrid Ubags, Niki; Plate, Manuela; Almendros, Isaac; Bartel, Sabine.. Published in:

Iba-1 stained microglia images obtained from the CA1 region of the hippocampus with a 200x magnification showing control group stains (A) and hypoxia-light anaesthesia stains (B)

We make seven recommendations that are relevant to infrastructure projects: (1) companies should carefully consider the positioning of the community relations function

1) To avoid, and when avoidance is not possible, minimize displacement by exploring alternative project designs; 2) to avoid forced eviction; 3) to anticipate and avoid, or