• No results found

Development and implementation of a national programme for the management of severe and very severe pneumonia in children in Malawi

N/A
N/A
Protected

Academic year: 2021

Share "Development and implementation of a national programme for the management of severe and very severe pneumonia in children in Malawi"

Copied!
4
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Health in Action

Development and Implementation of a National

Programme for the Management of Severe and Very

Severe Pneumonia in Children in Malawi

Penelope Marjorie Enarson1*, Robert Gie2, Donald A. Enarson1, Charles Mwansambo3

1 International Union Against Tuberculosis and Lung Disease, Child Lung Health Division, Paris, France, 2 Department of Paediatrics and Child Health, Faculty of Health Sciences, Stellenbosch University, Tygerberg, South Africa,3 Kamuzu Central Hospital, Department of Paediatrics, Lilongwe, Malawi

Background

The reduction of child mortality by two-thirds from its 1990 level by 2015—the fourth United Nations Millennium Devel-opment Goal—is a major challenge. Pneu-monia accounts for much ($20%) of this mortality in poor countries, but standard case management (SCM) of pneumonia [1] has the potential to reduce overall child mortality. A recent meta-analysis estimated that SCM of pneumonia could reduce overall mortality in neonates, infants under 1 y old, and children aged 0–4 y, respec-tively, by 27%, 20%, and 24%, and pneumonia-specific mortality by 42%, 36%, and 36% in the same age groups [2]. However, even proven intervention strategies cannot function without an effective ‘‘delivery strategy’’ [3]. For, example, although the World Health Organization (WHO)/United Nations Children’s Fund has developed an Inte-grated Management of Childhood Illness (IMCI) strategy to reduce child mortality, of the 100+ low- and middle-income countries that introduced IMCI in the 1990s, only 48% had scaled up coverage by the end of 2002. Weak health systems were the main cause of this failure with the poorest countries doing worst [3].

We describe here the development and scaling-up of a country-wide delivery strategy of SCM for pneumonia in chil-dren in Malawi, a country where more than 200 children per thousand die before they are 5 y old.

The Health Service Delivery Model

The International Union Against Tu-berculosis and Lung Disease (The Union)

previously pioneered an effective delivery model for antituberculosis services [4] for patients in poor countries. The approach used in this framework, which is one of the most cost-effective health interventions [5] devised so far, was incorporated into the WHO Stop TB Strategy and, by 2005, it had been successfully introduced into 190 countries [6]. Its principles include polit-ical commitment, standardized diagnosis and treatment, training, logistics, record-ing and reportrecord-ing, supervision, and evalu-ation of services.

The Union has adapted this model to improve the management of severe and very severe pneumonia in children admitted to first-level (district) hospitals, institutions that are accessible to the whole population but where care is often deficient [7–9]. The framework allows accurate accounting of services, materials, and training, facilitates the calculation of outcome per unit of cost, and permits the management of supplies to avoid disruption of essential materials.

The model focuses on strengthening district hospitals and their associated health centres—the basic management unit. Thus, it should facilitate the management of pneumonia in institutions that are peripheral enough to promote access but central enough to facilitate monitoring and evaluation.

The core elements of this approach for the delivery of SCM for pneumonia are:

N

Political commitment of the govern-ment for countrywide implegovern-mentation within existing health systems and the support of a donor partner to assist until the programme is self-sustaining. This element implies that there is/are:

# an existing structure for

deliv-ering the services;

# access for all patients to the

services;

# financial resources to sustain

activities.

N

Diagnosis and treatment based upon SCM (Table 1) with a system of quality control.

N

Training of clinical staff in SCM.

N

Logistics to purchase and distribute uninterrupted supplies of standardized drugs.

N

Recording and reporting of clinical outcomes of pneumonia.

N

Supervision and evaluation of the services.

Implementation of a Child Lung Health Programme

In 1999 the Government of Malawi asked The Union to assist it in the development and implementation of a Child Lung Health

Citation: Enarson PM, Gie R, Enarson DA, Mwansambo C (2009) Development and Implementation of a National Programme for the Management of Severe and Very Severe Pneumonia in Children in Malawi. PLoS Med 6(11): e1000137. doi:10.1371/journal.pmed.1000137

Published November 10, 2009

Copyright: ß 2009 Enarson et al. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

Funding: Funded by the Bill & Melinda Gates Foundation grant ID#: 413 (http://www.gatesfoundation.org/ Pages/home.aspx). The funders had no role in study design, data collection and analysis, decision to publish, or preparation of the manuscript.

Competing Interests: The authors have declared that no competing interests exist.

Abbreviations: CLHP, Child Lung Health Programme; IMCI, Integrated Management of Childhood Illness; SCM, standard case management.

* E-mail: penarson@theunion.org The Health in Action section is a forum for

individuals or organizations to highlight their innovative approaches to a particular health prob-lem.

(2)

Programme (CLHP) to manage children under 5 y old hospitalized with severe/very severe pneumonia. The government identi-fied the following problems: (1) inadequate health-worker skills in district hospitals; (2) inadequate supplies of antibiotics and equip-ment to administer oxygen therapy; (3) deficient use of strategic information.

The resultant CLHP was incorporated into the existing paediatric wards and outpatient departments in first-level gov-ernment hospitals and implemented solely by the personnel within these services. It was coordinated with existing policies for the treatment of acute respiratory infec-tions (ARI) and for the implementation of the IMCI strategy and centrally managed by the ARI/IMCI team.

As part of the existing health system [6], the national Ministry of Health (MOH) contributed 70.8% of the CLHP’s running costs; these costs paid for facilities and human resources. The donor (The Bill and Melinda Gates Foundation) provided the remaining costs (a total of US$1.93 million over a 6-y period); 21% of these costs were used for investment and 79% covered operating costs.

CLHP implementation was carried out in four ‘‘work-packages’’ that identified activi-ties for each year and set a framework for preparing budgets (see Table 2). Implemen-tation across the country was done step-wise to ensure that the policies were adapted to

local circumstances; expansion used previ-ously developed sites as training facilities.

The CLHP in More Detail Signing a Formal Agreement

In 2000, The Union and the Govern-ment of Malawi signed a formal agree-ment outlining the governagree-ment’s commit-ment to the CHLP [10].

Situation Analysis

A standardized evaluation of the epide-miology of childhood lung disease, the nature of the health services available to deal with them, and the efficiency, equity, and accessibility of these services was carried out [11].

Developing a Plan of Action

A 5-y plan designed to achieve country-wide CLHP coverage was prepared on the basis of available documents and the situation analysis. The plan included a manual of policies and procedures, a calen-dar of activities, a budget, a description of the responsibilities of the parties involved in implementation, an evaluation mechanism, and the procedures to be followed.

Establishing Initial Implementation Sites

Initial implementation sites (administra-tive districts) were selected according to

the following criteria: presence of a functioning ARI and/or IMCI pro-gramme; commitment of the District Health Officer to the CLHP; availability of a designated health worker who, in addition to normal activities, assumed responsibility for implementation; and a catchment area of approximately 100,000 population. A plan for regular monitoring was then developed.

Training Health Management Personnel

The programme manager and staff at each implementation site participated in intensive training to enhance their man-agement skills and the computer skills needed to efficiently manage information.

Training Inpatient and Outpatient Health Care Workers in Case Management

A CLHP training manual and modules were adapted to local conditions and used as a standard operating and reference manual. The training curriculum for health care workers, although focused on SCM of childhood lung diseases (pneumo-nia, tuberculosis, asthma, and HIV-related lung disease), also included case manage-ment of other major childhood illnesses (malnutrition, diarrhoea, malaria, anae-mia, and meningitis) because children frequently presented with comorbid con-ditions. Annual training courses focused on theoretical and practical case manage-ment using local paediatric facilities and initially relied on an international course faculty. Local faculty gradually took on more responsibility for these courses. One-day follow-up training sessions took place 4–6 wk after the annual course plus ongoing in-service training.

Monitoring Progress

Information routinely collected to pro-vide patient care formed the core of the CLHP monitoring activities. Information

Summary Points

N

More than 20% of child mortality in poor countries is due to pneumonia.

N

Standard case management of pneumonia has the potential to reduce overall child mortality, provided it can be delivered effectively.

N

The government of Malawi recently introduced a national programme for the delivery of standard case management for pneumonia in children in Malawi with the help of technical and donor partners.

N

This Health in Action article describes the development, scale-up, and achievements of this national programme, which is based on a successful antituberculosis service delivery model, and discusses the challenges facing the implementation of this adapted service delivery model.

Table 1. Pneumonia SCM.

Diagnosis Presenting Signs and Symptoms Recommended Treatment Regimens Very severe

pneumonia

Respiratory rate: $50 aged 2–11 mo; $40 aged 12–59 mo; Lower chest wall in-drawing; Cyanosis; unable to drink; reduced level of consciousness; grunting (infants)

Chloramphenicol 25 mg/kg 8 hourly; or ampicillin 50 mg/kg IM four times daily plus gentamicin 7.5 mg/kg once daily; or if ampicillin unavailable, benzylpenicillin 50,000 units/ kg every 6 h plus gentamicin 10 d antibiotic treatment

Severe pneumonia Respiratory rate: $50 aged 2–11 mo; $40 aged 12–59 mo; lower chest wall in-drawing

Benzylpenicillin 50,000 units/kg every 6 h; or if injectable penicillin unavailable or referral is not possible, then oral amoxicillin 25 mg/kg twice daily for 5 d

Nonsevere pneumonia

Respiratory rate: $50 aged 2–11 mo; $40 aged 12–59 mo

Cotrimoxazole (trimethoprim 4 mg/kg–sulphamethoxazole 20 mg/kg) twice daily for 5 d; or amoxicillin 25 mg/kg twice daily 3 d antibiotic treatment

IM, intramuscularly; SCM, child aged 2–59 mo. doi:10.1371/journal.pmed.1000137.t001

(3)

was gathered using standard forms [12]. These documents were simple, clear, and kept to the absolute minimum required for adequate patient care and for monitoring and evaluating the CLHP. Monthly re-ports were generated on the number of pneumonia admissions by age and sever-ity, treatment outcomes by age, and severity and monthly supply requirements. This information was used for manag-ing materials, for monitormanag-ing the quality of care, and for epidemiological surveillance. It was also used to assess health service utilization, the efficiency of the services provided, and the transparency of man-agement procedures.

Focusing Services on Vulnerable Children

The target group of the CLHP was vulnerable children with severe/very se-vere pneumonia who were at greatest risk of dying and who required hospital care.

Managing Supplies and Materials

Uninterrupted supply of appropriate antibiotics was assured by using the routine reports to complete order forms to obtain annual supplies. To avoid ‘‘rupture of supply,’’ there was a ‘‘reserve’’ stock of medications (equivalent to 100% of the previous year’s order) within the country. The information system was crucial for accurate planning of drug requirements.

Evaluating the Services

The monthly reports on diagnosis, treatment, and outcomes provided the information needed to monitor the CLHP. They were also used to evaluate output and to advocate for resources. Systematic review identified and corrected problems in implementation. Completeness of the records was routinely evaluated.

Technical support by external experts twice a year focused on maintaining quality. Unit managers also met regularly to review their work and their problems.

In addition, an independent review un-dertaken during the third year of the implementation period provided in-depth evaluation of the services and of the role of all the collaborators in the agreement.

Scaling Up

Expansion was designed to achieve the widest possible access to the CLHP in the shortest time whilst maintaining quality. Five district/central hospitals were en-rolled in October 2000 with five, six, and eight more enrolling in each subsequent year. By the end of the fourth year, all 22 district hospitals and two of the four central hospitals in Malawi had imple-mented the CLHP. Another central hos-pital was enrolled in the programme in 2004.

See Text S1 for further discussion on the framework and why this approach was chosen.

Results Achieved

From October 2000 to December 2005, 312 health workers (approximately one-quarter of all nurses, clinical officers, and medical assistants working in government hospitals) participated in 5-d training courses.

N

The 22 district and three central hospitals reported 48,702 cases be-tween 1 October 2000 and 31 Decem-ber 2005. The annual numDecem-ber of pneumonia admissions increased from 3,673 in the first full year (2001) to 7,516, 13,149, 10,134, and 13,674 in the subsequent years. Although this annual increase was partly due to the addition of new sites, for individual districts the mean yearly increase of admissions varied between 61.8% and 68.6%. The most likely explanation for this increase is that increasing confi-dence of the health care workers and community members in the CLHP resulted in more children being brought for treatment.

N

The average cost per case managed in hospital was US$136 of which the investment cost for the international donor was US$8.34 per case.

N

10% of children treated were aged ,2 mo, 52% were aged 2–11 mo, and 37% were aged 12–59 mo.

N

In children aged 12–59 mo, 2% of cases were nonsevere pneumonia, 62.8% were severe pneumonia, and 25.2% were very severe pneumonia; in infants, 10.0% of cases had severe/ very severe pneumonia.

N

The proportion of children dying of pneumonia fell from 18.6% to 8.4%, a reduction of 54.8% over the baseline.

Challenges

The major challenge facing the imple-mentation of the CLHP in Malawi has been a shortage of health care workers. In particular, the attrition rate of trained workers has been high because of recruit-ment to the private sector, transfer of trained staff to other government hospi-tals, and deaths from HIV/AIDS. To address this problem, regular in-service and on-the-job training has been intro-duced and participation in the annual CLHP training course extended. The MOH has also increased the intake to nurses’ training institutes and restarted the Medical Assistant training programme.

A second challenge has been continuing high case fatality rates in some districts due to aggravating factors such as malaria, malnutrition, anaemia, and HIV/AIDS. Case management of these conditions has now been introduced into the CLHP training course.

A third challenge has been a lack of equipment. To deal with this challenge, the CLHP has funded vehicles, computers, and other electronic equipment to im-prove supervision and communication. Oxygen concentrators have been provided at each site [13].

Table 2. Key activities within each work package.

Coordination Training Monitoring/Evaluation Supply

Planning/budgeting; training/supervision; recording/reporting; supply management; sSectoral coordinationa

: define sectoral stakeholders; develop sectoral mechanisms; define stakeholders in other sectors; outline mechanism for inter-agency coordination

Standard operating manuals development; training materials development; training courses; training follow-up; supervision; describe frequency by levelb; define procedures; standardize forms; outline reporting mechanisms

Describe frequency by levelb ; define procedures; develop standardized forms; outline reporting mechanisms; analyze progress toward targets; prepare routine reports; establish peer review processes; establish quality assurance processes

Outline core requirements; define procurement plan; describe logistics system; monitor order/delivery; inspect/audit stock a

Coordination of CLHP with other sectors involved in health services. b

The frequency of training and monitoring/evaluation of regions and districts by more central bodies. doi:10.1371/journal.pmed.1000137.t002

(4)

A final challenge facing the CLHP has been sustaining the programme beyond the cycle of foreign assistance. Following the programme’s success, the MOH has included the CLHP in the Essential Health Package, which is funded through the Sector Wide Approach [14]. The CLHP has now been maintained for 3 y since the end of external project funding and is currently being expanded to nongovernment hospitals [15].

Conclusions

The implementation of the CLHP in Malawi demonstrates the feasibility and

effectiveness of a model programme based on the principles of the successful model for tuberculosis control to reduce case fatality in children hospitalized for pneu-monia within first-level referral hospitals. The experience shows that while external funding is required to introduce the CLHP, the other key elements of the model are also necessary. Although it has not been possible to compare this ap-proach, which has a substantial vertical component, with a locally integrated approach, the experience in Malawi sug-gests that this model could help the world achieve Millennium Development Goal 4.

Supporting Information

Text S1 Discussion on framework/why this approach was chosen.

Found at: doi:10.1371/journal.pmed. 1000137.s001 (0.11 MB DOC)

Author Contributions

ICMJE criteria for authorship read and met: PME RG DAE CM. Wrote the first draft of the paper: PME. Contributed to the writing of the paper: PME RG DAE CM.

References

1. WHO, Department of Child and Adolescent Health and Development (2005) Hospital care for children: guidelines for the management of common illnesses with limited resources. Geneva: WHO Press.

2. Sazawal S, Black RE (2003) Effect of pneumonia case management on mortality in neonates, infants, and preschool children: a meta-analysis of community-based trials. Lancet Infect Dis 3: 547–556.

3. Bryce J, El AS, Pariyo G, Lanata C, Gwatkin D, et al. (2003) Reducing child mortality: can public health deliver? Lancet 362: 159–164. 4. Bukhman G, Kidder A (2008) Cardiovascular

disease and global health equity: lessons from tuberculosis control then and now. Am J Public Health 98: 44–54.

5. World Bank (1993) World development report 1993: investing in health. Oxford: World Bank, Oxford University Press.

6. WHO (2007) Global tuberculosis control – surveillance, planning, financing. Geneva: WHO. 7. Nolan T, Angos P, Cunha AJ, Muhe L, Qazi S, et al. (2001) Quality of hospital care for seriously ill children in less developed countries. Lancet 357: 106–110.

8. English M, Esamai F, Wasunna A, Were F, Ogutu B, et al. (2004) Assessment of inpatient paediatric care in first referral level hospitals in 13 districts in Kenya. Lancet 363: 1948–1963. 9. English M, Esamai F, Wasunna A, Were F,

Ogutu B, et al. (2004) Delivery of paediatric care at the first referral level in Kenya. Lancet 364: 1622–1629.

10. Enarson DA (1991) Principles of IUATLD collaborative tuberculosis progammes. Bull Int Union Tuberc Lung Dis 66: 195–200. 11. Arnadottir T, Rieder H, Enarson DA (1998)

Tuberculosis programs: review, planning,

techni-cal support. A manual of methods and proce-dures. Reykjavik: SIBS.

12. Enarson P, Enarson DA (1997) Management of the child with cough or difficult breathing, a guide for low income countries. Paris: International Union Against Tuberculosis and Lung Disease. 13. Enarson P, La Vincente S, Gie R, Maganga E,

Chokani C (2008) Implementation of an oxygen concentrator system in district hospital paediatric wards throughout Malawi. Bull World Health Organ 86: 344–348.

14. Department of Planning, Ministry of Health (2004) A joint programme of work for a health sector wide approach (SWAp) 2004–2010. Li-longwe, Malawi: Department of Planning, Min-istry of Health.

15. Ministry of Health (2008) Annual report for the work of the Malawi health sector for the period July 2007 to June 2008. Lilongwe, Malawi: Ministry of Health.

Referenties

GERELATEERDE DOCUMENTEN

Binnen het juridisch kader ‘Grond en Waterbodem’ (Besluit Bodemkwaliteit) kan olivijn, verwerkt in een substraat, niet worden toegepast gezien de samenstellingseis voor nikkel.

Dit hoofdstuk beschrijft de impact van storten in diepe putten op de morfologie en hydrodynamica van de Westerschelde. De verspreiding van het zand op de stortlocatie

Dit criterium moet duidelijkheid geven over de periode waarin een regel verbindend is, de functie hiervan en de vraag of de nieuwe regel vanaf het werkingsmoment

Table 4 shows the coding scheme for the question, “Why do businesses collaborate with NGOs that use music in the peace fostering process?” The two codes Real Trust and

Business Environment Risks R1: Lack of executive management commitment and support in ERP solution design and implementation R2: The project is not organised and structured to

The results showed that participants did not make use of Smartphones as tool in order to establish connections or any other kind of relationships with alternative partners,

Sekere begrippe wat in hierdie navorsing gebruik word, moet uit die aard van hulle meerduidige gebruik gepresiseer word. 1.7.2.1 Begrippe wat met kultuur verband

The discontinuous jump in the total spectrum is caused by the fact that the BW/RB component is the sum of a small number of spectra that cut off at particular values of the