Management of dredged Silt from

Ems-river

(2)

Area of Responsibility

Lower Ems Outer Ems

(3)

• 40 km navigable river for seagoing ships

(Papenburg to Emden)

• 2-3 Mio. m³ dredging material each year

• Mainly Silt (> 90 %)

• Dredging for new cruise liners and also regular shipping

• Narrow River

• Solution: Disposal on shore

Area Lower Ems

Leer Emden

Papenburg

(4)

Disposal on land

• Lake complex Neermoor: 3 former sand pits

• Ihrhove / Steenfelde:

Approx. 1000 ha filling fields on agricultural lands

• High costs for both options

(5)

• Northern Part: Ihrhove (completed since 2017)

• Southern Part: Steenfelde (since 2015, until 2025?)

• 1000 ha agricultural land

• At least 60% of dredged

material from Ems (approx.

1,5 Mio. m³)

• Second landfill planned in Ihrhove after completing

Steenfelde (due to significant settlement)

Filling fields Ihrhove/Steenfelde

(6)

Dam Construction

• 2,5 m high

• 10 or 15 m distance to ditches

• Build of top soil from the

surrounding (mostly peat)

• Geotextile at the foundation for structural safety

Filling fields Ihrhove/Steenfelde

(7)

• 2 transfer stations at the river Ems

Filling fields Ihrhove/Steenfelde

(8)

• 2 transfer stations at the river Ems

• 25 km pipelines, lots of valves

Filling fields Ihrhove/Steenfelde

(9)

• 2 transfer stations at the river Ems

• 25 km pipelines, lots of valves

• 1 pumping station to increase the

pressure

• Several pumps to transport excess water back to the river

Filling fields Ihrhove/Steenfelde

(10)

• 2 transfer stations at the river Ems

• 25 km pipelines, lots of valves

• 1 pumping station to increase the

pressure

• Several pumps to transport excess water back to the river

• Several filling fields are used parallel

• Each field is in

operation for approx.

2 years

Filling fields Ihrhove/Steenfelde

(11)

Filling fields Ihrhove/Steenfelde

(12)

Filling fields Ihrhove/Steenfelde

(13)

Filling fields Ihrhove/Steenfelde

(14)

All filling fields have to be recultivated to pastureland.

1. Draining 2. Mowing

Recultivation

(15)

All filling fields have to be recultivated to pastureland.

1. Draining 2. Mowing

3. Slit opening the Dam 4. Trenching the field

Recultivation

(16)

All filling fields have to be recultivated to pastureland.

1. Draining 2. Mowing

3. Slit opening the Dam

4. Trenching the field 5. Spreading the

material

6. Deep plowing

Recultivation

(17)

All filling fields have to be recultivated to

pastureland.

1. Draining 2. Mowing

3. Slit opening the Dam 4. Trenching the field 5. Spreading the

material

6. Deep plowing 7. Gras sowing 8. Return (after 2

years)

Recultivation

(18)

• Area was used as a clay pit for dyke construction in 2013

• Re-filling with dredged material 2013-2017

• Clay-riping since 2017

• Planned: Removal of 100.000 m³ beginning 2021

Clay pit Jarssumer Polder

Lower Ems

(19)

Clay pit Jarssumer Polder

Problem: (Partially) high amount of sand Solution: deviding the material

• Green: Deichacht Moormerland (Dyke embankment, fine material)

• Blue: Deichacht Krummhörn (core, sandy material)

(20)

• High dredging amounts in river Ems expected in future

• Masterplan Ems: Reduction of dredging amounts, or only relocation?

• More dumping in the future?

• Creation of new filling fields difficult (high challenges for approvals)

• Environmental protection restricts new filling fields

• Second filling in Ihrhove planned

• Rebuilding filling fields in Jarssum

Prospect

(21)

Management of dredged Silt from Ems- river

Thank you for your attention!

Referenties

GERELATEERDE DOCUMENTEN

The answers returned by the classifier and pattern match- ing are then merged and post-processed to match the task-specific guidelines (Section 2.7): Redun- dant answers are removed

For example, Morris and Mitchell ( 1995 ) used simulated annealing to find approximate maximin LHDs for up to five dimensions and up to 12 design points, and a few larger values,

For other points of action (fewer disturbances by urgent orders, use of filling buffers, Process and Product Control Paint during two shifts, planning on mobile tanks and

When the batch is approved by Process and Product Control Paint, it stays in the buffer, until it is needed by Filling Paint.. Some batches are mixed

ON THE IMPACT OF DIFFERENT SYSTEM STRATEGIES ON THE MATERIAL PERFORMANCE OF SELECTIVE LASER MELTING- MANUFACTURED TI6AL4V COMPONENTS..

international domain the position of law is different. In the international realm law is only mutually recognised among equal actors, which are the states themselves. Kant’s theory

However, the subsidy has been important for the development of the network (Sadowski et al., 2006) in particular as it allowed the network operator to deploy the FttH

Binnen dit onderzoek is de focus gericht op het risicomanagement van Nederlandse beursgenoteerde ondernemingen die moeten voldoen aan de Code Tabaksblat bestpracticebepalingen