STEP DRAWDOWN TEST DATA PLOT = Drawdown data. X = Recovery data. LOCALITY
Phalaborwa
Foskor NPM Phase II
BOREHOLE NO:NPM7S
DATE TESTED 15/11/2009 DISCHARGE RATES (Q) Q1 = 0.30 l/s Q2 = 0.65 l/s Q3 = 0.90 l/s Q4 = 1.64 l/s Q5 = 0.00 l/s Q6 = 0.00 l/s S.W.L = 19.88 m.b.g.l.CONSTANT DISCHARGE TEST DATA PLOT
= Drawdown data. = Recovery data. LOCALITY
Phalaborwa
Foskor NPM Phase II
PUMPED B.H. NO:NPM7S
DATE TESTED 18/11/2009 Q = 0.60 l/s. S.W.L = 21.69 m.b.g.l. T = 1.25 m²/daySpec. Cap. = 0.023 m3/day/m
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 1 10 100 1000 D ra w d o w n s (m) Time t (min.) R e s id u a l D ra w d o w n s ' ( m) . (T+t)/t 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 0.1 1 10 100 1000 D ra w do w n s (m) Time ( t ) mins.