STEP DRAWDOWN TEST DATA PLOT = Drawdown data.
X = Recovery data.
LOCALITY
Phalaborwa
Foskor PEP Phase III
BOREHOLE NO:
PEP5S
DATE TESTED 15/10/2009 DISCHARGE RATES (Q) Q1 = 5.05 l/s Q2 = 8.10 l/s Q3 = 12.20 l/s Q4 = 20.06 l/s Q5 = 25.60 l/s Q6 = 34.34 l/s S.W.L = 5.60 m.b.g.l.CONSTANT DISCHARGE TEST DATA PLOT = Drawdown data. = Recovery data.
LOCALITY
Phalaborwa
Foskor PEP Phase III
PUMPED B.H. NO:
PEP5S
DATE TESTED 00.01.00 Q = 25.0 l/s. S.W.L = 5.60 m.b.g.l. T = 0 m²/daySpec. Cap. = 0.0 m3/day/m
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 10 100 1000 10000 D ra w d o w n s (m) Time t (min.) R e s idua l D ra w d o w n s ' (m) . (T+t)/t 0 1 2 3 4 5 0.1 1 10 100 1000 D ra w do w n s (m) Time ( t ) mins.