• No results found

Calais territory – Pas-de- A new and particular tool to operate strategic retreat in costal areas for the Nord EPF Nord - Pas de Calais:

N/A
N/A
Protected

Academic year: 2022

Share "Calais territory – Pas-de- A new and particular tool to operate strategic retreat in costal areas for the Nord EPF Nord - Pas de Calais:"

Copied!
38
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

EPF Nord - Pas de Calais:

A new and particular tool to operate strategic retreat in costal areas for the Nord – Pas-de-

Calais territory

Guillaume Lemoine september 2015

(2)

Two questions:

- A new tool ?

- A new tool to operate strategic retreat in

costal areas ?

(3)

A new tool ?

The EPF Nord – Pas de Calais was created in December 1990

Within the framework of a State/Region Planning Agreement The wish of the region’s elected officials for a tool that allows

brownfield redevelopment within a land recycling process

(4)

The EPF Nord – Pas de Calais A state EPIC

• Administrated by a board of 32 members composed of:

 8 regional councillors

 8 departmental councillors (4 for Nord and 4 for Pas de Calais)

 8 town communities representatives

 8 consular councillors

Myriam Cau (VP regional council) is the chairman since 12 december 2011

(5)

First step: in 1991, industrial brownfields redevelopment operations are started

using State/Region Planning Agreement funds and European funds ensuring a 100% financing of the

interventions

(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)

Assessment in 2006

4000 Ha redeveloped using 180 million Euros of public subsidies

(15)

Second step: in 1996, land action is started and supported by the collection of the Special Development Tax (TSE) voted in

December 1995

1. Financing temporary land ownership on behalf of the region’s local communities

2. Providing for the institution’s operation costs 3. Since 1st January 2007 : financing works

Annual amount of the tax :

from 1996 to 2000 : 4.6 M€

from 2000 to 2006 : 9.2 M€

from 2007 to 2013 : 32.0 M€

Since 2015 : 80 M€

(16)

Second step: in 1996, land action/acquisitions starts, and EPF develops the urban renewal

and economic projects offer

EPF :

- helps and supports the recycling of derelict built-up spaces to promote urban renewal and urban diversity - develops the land offer for housing, in particular for social

housing environment,

- supports the peri-urban sprawl control

- EPF develops particular aids for the support of economic activities (land acquisitions of companies in difficulty, and

financial providing for restructuration)

(17)
(18)

Assessment in 2011

1200 ha acquired and redeveloped using 330 million Euros

(19)

third step: in 2002, EPF purchased subsidiary mining company :Terril SA. (slag heaps

exploitation)

• With the coal extraction end and the State mining company (Charbonnages de France) closure, some public partners asked the Établissement Public Foncier (EPF) to intervene. Slag heaps (50 units, 2186 ha) have been compulsory acquired for the redevelopment of numerous mining sites (natural or architectural sites) for local communities, with the European Union, regional and State aids

(20)

third step: in 2002, EPF purchased

mining/quarries compagny :Terril SA. (slag heaps exploitation) for created leisure areas

:

(21)

third step: in 2002, EPF purchased :Terril SA.

compagny (slag heaps exploitation) for

nature reserves creation:

(22)

The aim is to plan new infrastructures, both for public access and for the biodiversity protection and development in these areas. Mining sites are now included in an ecological Green Belt (“Trame Verte”), which is the starting point for a new ecological sites « network » in the Nord- Pas-de-Calais coalfield.

(23)
(24)
(25)
(26)

Assessment of the land intervention during 2007 – 2014 period

• 60 frame agreements signed with 65 grouping municipalities

• 550 operational agreements carried out

• Activities volume of 700 million € : acquisitions, management, works and sales (lands transfers)

(27)

EPF’6-stage operational intervention

• Contracts : EPF signs « framework

partnerships agreement » with the inter- municipal authority

• Negociation and acquisition of property

• Managing property

• Works (demolition, reclamation, depollution…)

• Sale of property

• Monitoring and evaluation of public policy

(28)

Rules of temporary ownership operations

• Duration: 5-10 years

• Acquisition can be amicable, through pre-emption or compulsory

• Price is approved by the “Service des Domaines”

• Coverage of 100% of the demolition costs (since January 2015)

• Payment by local communities can be spread in

time

(29)

fourth step: in november 2011, EPF develops the offer for building green networks and

biodiversity protection

EPF :

- helps and supports the recycling of derelict houses, lands and factories… to promote green belt

constitution and hot spot of biodiversity protection -

- develops particular aids and actions for the treatment of spaces at risks (technologic factories, chemical pollutions

and natural risks (costal erosion, flooding… )

(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)

My firm is fantastic !

Referenties

GERELATEERDE DOCUMENTEN

Results from this interdisciplinary study, will give the water and wastewater authority a risk assessment to pinpoint areas where water infrastructure is more exposed to

In an at- tempt to evaluate the effectiveness of the non-laboratory absolute CVD risk score in a developing country setting, we compared the ranking of individuals using the

• Besmet zaaizaad en gewasresten in de grond • Via opspattend water aantasting onderste blad • Vervolgens over grote afstand via de wind • Snelle ontwikkeling onder

(2015) in testing for changes in the effect across two sub-sets of countries. Namely, these sub-sets are based on the financial development of a country. A country is denoted as

This policy brief describes three types of housing arrangements that are sought after by urban Internally Displaced People (IDPs) in the east of the Democratic Republic of

Equation 6 Difference of the current art sales with the previous month’s sales at Sotheby’s ( ) are regressed on a current and 12 lagged values of the monthly differences of

The existence of slum area cannot be separated from housing affordability problems. Urbanization phenomena and land use planning in urban areas also need to be considered in

The Ministry of Foreign Affairs may regard the New Urban Agenda as encouragement to proceed on its course of collaboration and capacity building, involving local parties and