• No results found

University of Groningen Not lean by default Ziengs, Nick

N/A
N/A
Protected

Academic year: 2021

Share "University of Groningen Not lean by default Ziengs, Nick"

Copied!
21
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Not lean by default Ziengs, Nick

IMPORTANT NOTE: You are advised to consult the publisher's version (publisher's PDF) if you wish to cite from it. Please check the document version below.

Document Version

Publisher's PDF, also known as Version of record

Publication date: 2018

Link to publication in University of Groningen/UMCG research database

Citation for published version (APA):

Ziengs, N. (2018). Not lean by default: Exploring practices, their design, and underlying mechanisms driving performance. University of Groningen, SOM research school.

Copyright

Other than for strictly personal use, it is not permitted to download or to forward/distribute the text or part of it without the consent of the author(s) and/or copyright holder(s), unless the work is under an open content license (like Creative Commons).

Take-down policy

If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim.

Downloaded from the University of Groningen/UMCG research database (Pure): http://www.rug.nl/research/portal. For technical reasons the number of authors shown on this cover page is limited to 10 maximum.

(2)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 203PDF page: 203PDF page: 203PDF page: 203 195

R

References

Adams, J. S. (1963). Toward an Understanding of Inequity. Journal

of Abnormal Psychology, 67, 422–436.

Adams, J. S., & Freedman, S. (1976). Equity Theory Revisited:

Comments and Annotated Bibliography. Advances in

Experimental Social Psychology, 9, 43–90.

Albliwi, S., Antony, J., Abdul Halim Lim, S., & van der Wiele, T. (2014). Critical failure factors of Lean Six Sigma: a

systematic literature review. International Journal of Quality &

Reliability Management, 31, 1012–1030.

Anderson, J. C., Rungtusanatham, M., Schroeder, R. G., & Devaraj, S. (1995). A Path Analytic Model of a Theory of Quality

Management Underlying the Deming Management Method:

Preliminary Empirical Findings. Decision Sciences, 26, 637–658. Bendoly, E., Donohue, K., & Schultz, K. L. (2006). Behavior in

operations management: Assessing recent findings and

revisiting old assumptions. Journal of Operations Management,

24, 737–752.

Bertrand, J. W. M., & Van Ooijen, H. P. G. (2002). Workload based

order release and productivity: a missing link. Production

Planning & Control, 13, 665–678.

Bhamu, J., Sangwan, K. S., & Singh Sangwan, K. (2014). Lean

manufacturing: literature review and research issues.

International Journal of Operations and Production Management, 34, 876–940.

Bhasin, S., & Burcher, P. (2006). Lean viewed as a philosophy.

(3)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 204PDF page: 204PDF page: 204PDF page: 204 196

R

Birdi, K., Clegg, C., Patterson, M., Robinson, A., Stride, C. B., Wall, T. D., & Wood, S. J. (2008). The impact of human resource

and operational management practices on company

productivity: A longitudinal study. Personnel Psychology, 61,

467–501.

Boon, O. K., Arumugam, V., Safa, M. S., & Bakar, N. A. (2007).

HRM and TQM: association with job involvement. Personnel

Review, 36, 939–962.

Borenstein, M., Hedges, L. V., Higgins, J. P. T., & Rothstein, H. R. (2009). Introduction to Meta-Analysis (Statistics in Practice). Chichester, West Sussex: Wiley.

Bortolotti, T., Boscari, S., & Danese, P. (2015). Successful lean

implementation: Organizational culture and soft lean

practices. International Journal of Production Economics, 160,

182–201.

Bortolotti, T., Danese, P., Flynn, B. B., & Romano, P. (2015).

Leveraging fitness and lean bundles to build the cumulative performance sand cone model. International Journal of

Production Economics, 162, 227–241.

Bou-Llusar, J. C., Escrig-Tena, A. B., Roca-Puig, V., & Beltrán-Martín, I. (2009). An empirical assessment of the EFQM

Excellence Model: Evaluation as a TQM framework relative to the MBNQA Model. Journal of Operations Management, 27,

1–22.

Boyer, K. K., & Swink, M. L. (2008). Empirical elephants—why

multiple methods are essential to quality research in operations and supply chain management. Journal of

Operations Management, 26, 337–348.

Buzacott, J. A. (1989). Queueing models of Kanban and MRP

controlled production systems. Engineering Costs and

(4)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 205PDF page: 205PDF page: 205PDF page: 205 197

R

Chang, D., & Lee, S. M. (1995). Impact of JIT on organizational

performance of U.S. firms. International Journal of Production

Research, 33, 3053–3068.

Chang, T. M., & Yih, Y. (1994). Generic kanban systems for

dynamic environments. International Journal of Production

Research, 32, 889–902.

Cheung, M. W. L., & Chan, W. (2005). Meta-analytic structural

equation modeling: A two-stage approach. Psychological

Methods, 10, 40–64.

Choi, T. Y., & Eboch, K. (1998). The TQM Paradox: Relations

among TQM Practices, Plant Performance, and Customer Satisfaction. Journal of Operations Management, 17, 59–75.

Choi, T. M., Cheng, T. C. E., & Zhao, X. (2016). Multi‐

Methodological Research in Operations Management.

Production and Operations Management, 25, 379-389.

Clarke, S. (2013). Safety leadership: A meta-analytic review of

transformational and transactional leadership styles as antecedents of safety behaviours. Journal of Occupational and

Organizational Psychology, 86, 22–49.

Combs, J. G., Liu, Y., Hall, A., & Ketchen, D. J. (2006). How much

do high-performance work practices matter? A meta-analysis of their effects on organizational performance. Personnel

Psychology, 59, 501–528.

Conway, R., Maxwell, W., McClain, J. O., & Thomas, L. J. (1988).

The role of work-in-process inventory in serial production lines. Operations Research, 36, 229–241.

Cooper, H. M., Hedges, L. V., & Valentine, J. C. (2009). The Handbook of Research Synthesis and Meta-Analysis. New York: Russell Sage Foundation Publications.

(5)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 206PDF page: 206PDF page: 206PDF page: 206 198

R

Crook, T. R., Ketchen, D. J., Combs, J. G., & Todd, S. Y. (2008).

Strategic resources and performance: A meta-analysis.

Strategic Management Journal, 29, 1141–1154.

Crosby, P. B. (1979). Quality is free: The art of making quality certain. New York: McGraw-Hill.

Croson, R., Schultz, K., Siemsen, E., & Yeo, M. L. (2013).

Behavioral operations: The state of the field. Journal of

Operations Management, 31, 1–5.

Cua, K. O., McKone, K. E., & Schroeder, R. G. (2001). Relationships

between implementation of TQM, JIT, and TPM and manufacturing performance. Journal of Operations

Management, 19, 675–694.

D’Andreamatteo, A., Ianni, L., Lega, F., & Sargiacomo, M. (2015).

Lean in healthcare: A comprehensive review. Health Policy,

119, 1197–1209.

Dal Pont, G., Furlan, A., & Vinelli, A. (2008). Interrelationships

among lean bundles and their effects on operational

performance. Operations Management Research, 1, 150–158.

Dallery, Y., & Gershwin, S. B. (1992). Manufacturing flow line

systems: a review of models and analytical results. Queueing

Systems, 12, 3–94.

Dallery, Y., & Liberopoulos, G. (2000). Extended kanban control

system: Combining kanban and base stock. IIE Transactions

(Institute of Industrial Engineers), 32, 369–386.

de Freitas, J. G., Costa, H. G., & Ferraz, F. T. (2017). Impacts of

Lean Six Sigma over organizational sustainability: A survey study. Journal of Cleaner Production, 156, 262–275.

Dean, J. W., & Bowen, D. E. (1994). Management Theory and

Total Quality: Improving Research and Practice through Theory Development. The Academy of Management Review, 19,

(6)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 207PDF page: 207PDF page: 207PDF page: 207 199

R

Delasay, M., Ingolfsson, A., Kolfal, B., & Schultz, K. L. (2015). Load Effect On Service Times. SSRN Electronic Journal.

Deming, W. (1982). Out of the Crisis. Cambridge: Massachusetts Institute of Technology, Center for Advanced Engineering Study. Doerr, K. H., & Arreola-Risa, A. (2000). A worker-based approach

for modeling variability in task completion times. IIE

Transactions, 32, 625–636.

Doerr, K. H., Freed, T., Mitchell, T. R., Schriesheim, C. A., & Zhou, X. T. (2004). Work flow policy and within-worker and

between-workers variability in performance. The Journal of

Applied Psychology, 89, 911–921.

Doerr, K. H., Mitchell, T. R., Klastorin, T. D., & Brown, K. a. (1996).

Impact of material flow policies and goals on job outcomes.

Journal of Applied Psychology, 81, 142–152.

Doerr, K. H., Mitchell, T. R., Schriesheim, C. A., Freed, T., & Zhou, X. (2002). Heterogeneity and variability in the context of flow

lines. Academy of Management Review, 27, 594–607.

Dow, D., Samson, D., & Ford, S. (1999). Exploding the Myth: Do

All Quality Management Practices Contribute to Superior Quality Performance? Production and Operations

Management, 8, 1–27.

Fernandes, N. O., Thürer, M., Stevenson, M., & Carmo Silva, S. (2017). Load-Based POLCA: An Assessment of the Load

Accounting Approach. In Recent Advances in Information

Systems and Technologies (pp. 397–405). Springer, Cham.

Festinger, L. (1954). A Theory of Social Comparison Processes.

Human Relations, 7, 117–140.

Flynn, B. B. (1994). The Relationship between Quality

Management Practices , Infrastructure and Fast Product Innovation. Benchmarking for Quality Management &

(7)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 208PDF page: 208PDF page: 208PDF page: 208 200

R

Flynn, B. B., Sakakibara, S., & Schroeder, R. G. (1995). Relationship

between JIT and TQM: Practices and Performance.

Academy of Management Journal, 38, 1325–1360.

Flynn, B. B., Schroeder, R. G., & Sakakibara, S. (1994). A

framework for quality management research and an associated measurement instrument. Journal of Operations

Management, 11, 339–366.

Flynn, B. B., Schroeder, R. G., & Sakakibara, S. (1995). The Impact

of Quality Management Practices on Performance and Competitive Advantage. Decision Sciences, 26, 659–691.

Forza, C., & Filippini, R. (1998). TQM impact on quality

conformance and customer satisfaction: A causal model.

International Journal of Production Economics, 55, 1–20.

Fotopoulos, C. B., & Psomas, E. L. (2009). The Impact of “Soft”

And “Hard” TQM Elements on Quality Management Results. International Journal of Quality & Reliability

Management, 26, 150–163.

Furlan, A., Dal Pont, G., & Vinelli, A. (2011). On the

complementarity between internal and external just-in-time bundles to build and sustain high performance

manufacturing. International Journal of Production Economics,

133, 489–495.

Furlan, A., Vinelli, A., & Dal Point, G. (2011). Complementarity

and lean manufacturing bundles: an empirical analysis.

International Journal of Operations & Production Management, 3, 835–850.

Furlan, A., Vinelli, A., & Pont, G. D. (2011). Complementarity and

lean manufacturing bundles: an empirical analysis.

International Journal of Operations & Production Management, 31, 835–850.

(8)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 209PDF page: 209PDF page: 209PDF page: 209 201

R

Gaury, E. G. A., Kleijnen, J. P. C., & Pierreval, H. (2001). A

Methodology to Customize Pull Control Systems. Journal of

the Operational Research Society, 52, 789–799.

Gaury, E. G. A., Pierreval, H., & Kleijnen, J. P. C. (2000).

Evolutionary approach to select a pull system among Kanban, Conwip and Hybrid. Journal of Intelligent

Manufacturing, 11, 157–167.

Germs, R., & Riezebos, J. (2010). Workload balancing capability of

pull systems in MTO production. International Journal of

Production Research, 48, 2345–2360.

Gino, F., & Pisano, G. (2008). Toward a Theory of Behavioral

Operations. Manufacturing & Service Operations Management,

10, 676–691.

González-R, P. L., & Framinan, J. M. (2009). The pull evolution:

from Kanban to customised token-based systems. Production

Planning & Control, 20, 276–287.

González-R, P. L., Framinan, J. M. J. M., Pierreval, H., Gonzalez-R, P. L., Framinan, J. M. J. M., Pierreval, H. (2012). Token-based

pull production control systems: An introductory overview.

Journal of Intelligent Manufacturing, 23, 5–22.

Gstettner, S., & Kuhn, H. (1996). Analysis of production control

systems kanban and CONWIP. International Journal of

Production Research, 34, 3253–3273.

Hasle, P., Bojesen, A., Jensen, P. L., & Bramming, P. (2012). Lean

and the working environment: A review of the literature.

International Journal of Operations and Production Management, 32, 829–849.

Heimbach, I., Grahl, J., & Rothlauf, F. (2012). The effects of

state-dependent human behavior on the design of a serial line.

(9)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 210PDF page: 210PDF page: 210PDF page: 210 202

R

Hertel, G., Deter, C., & Konradt, U. (2003). Motivation Gains in

Computer-Supported Groups. Journal of Applied Social

Psychology, 33, 2080–2105.

Hertel, G., Kerr, N. L., & Messé, L. A. (2000). Motivation gains in

performance groups: Paradigmatic and theoretical

developments on the Köhler effect. Journal of Personality and

Social Psychology, 79, 580–601.

Hines, P., Holweg, M., & Rich, N. (2004). Learning to evolve.

International Journal of Operations & Production Management, 24, 994–1011.

Hoffman, B. J., Blair, C. A., Meriac, J. P., & Woehr, D. J. (2007).

Expanding the criterion domain? A quantitative review of the OCB literature. Journal of Applied psychology, 92, 555–566.

Hopp, W. J., Iravani, S. M. R., & Yuen, G. Y. (2007). Operations

Systems with Discretionary Task Completion. Management

Science, 53, 61–77.

Hopp, W. J., & Spearman, M. L. (2004). To Pull or Not to Pull:

What Is the Question? Manufacturing & Service Operations

Management, 6, 133–148.

Hopp, W. J., & Spearman, M. L. (2008). Factory Physics (3rd ed.). Long Grove: Waveland Press, INC.

Hudson, S., McNamara, T., & Shaaban, S. (2014). Unbalanced lines:

where are we now? International Journal of Production

Research, 53, 1895–1911.

Huedo-Medina, T. B., Sánchez-Meca, J., Marín-Martínez, F., & Botella, J. (2006). Assessing heterogeneity in meta-analysis: Q

statistic or I2 index? Psychological Methods, 11, 193–206.

Hunter, J. E., & Schmidt, F. L. (2004). Methods of Meta-Analysis:

Correcting Error and Bias in Research Findings. CA: Sage.

(10)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 211PDF page: 211PDF page: 211PDF page: 211 203

R

Jak, S. (2015). Methods for meta-analytic structural equation

modeling. In Meta-analytic structural equation modelling (pp.

15–23). Springer, Cham.

Jayaram, J., Ahire, S. L., & Dreyfus, L. P. (2010). Contingency

relationships of firm size, TQM duration, unionization, and industry context on TQM implementation - A focus on total effects. Journal of Operations Management, 28, 345–356.

Jitpaiboon, T., & Rao, S. S. (2007). A meta-analysis of quality

measures in manufacturing system. International Journal of

Quality & Reliability Management, 24, 78–102.

Juran, D. C., & Schruben, L. W. (2004). Using worker personality

and demographic information to improve system

performance prediction. Journal of Operations Management,

22, 355–367.

Juran, J. M. (1988). Juran on planning for quality. New York: Free Press.

Karau, S. J., & Williams, K. D. (1993). Social Loafing: A

Meta-Analytic Review and Theoretical Integration. Interpersonal

Relations and Group Processes, 65, 681–706.

Katok, E. (2011). Using Laboratory Experiments to Build Better

Operations Management Models. Foundations and Trends in

Technology, Information and Operations Management, 5, 1–86.

Kc, D. S., & Terwiesch, C. (2009). Impact of Workload on Service

Time and Patient Safety: An Econometric Analysis of Hospital Operations. Management Science, 55, 1486–1498.

Khanchanapong, T., Prajogo, D., Sohal, A. S., Cooper, B. K., Yeung, A. C. L., & Cheng, T. C. E. (2014). The unique and

complementary effects of manufacturing technologies and lean practices on manufacturing operational performance.

(11)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 212PDF page: 212PDF page: 212PDF page: 212 204

R

Khojasteh-Ghamari, Y. (2009). A performance comparison between

Kanban and CONWIP controlled assembly systems. Journal

of Intelligent Manufacturing, 20, 751–760.

Kleijnen, J. P. C., & Gaury, E. G. A. (2003). Short-term robustness

of production management systems: A case study. European

Journal of Operational Research, 148, 452–465.

Krafcik, J. F. (1988). Triumph of the lean production system. Sloan

Management Review, 30, 41–53.

Krishnamurthy, A., & Suri, R. (2009). Planning and implementing

POLCA: a card-based control system for high variety or custom engineered products. Production Planning & Control,

20, 596–610.

Krishnamurthy, A., Suri, R., & Vernon, M. (2004). Re-examining the

performance of MRP and kanban material control strategies for multi-product flexible manufacturing systems.

International Journal of Flexible Manufacturing Systems, 16,

123–150.

Kumar, C. S., & Panneerselvam, R. (2007). Literature review of

JIT-KANBAN system. International Journal of Advanced

Manufacturing Technology, 32, 393–408.

Lage Junior, M., & Godinho Filho, M. (2010). Variations of the

kanban system: Literature review and classification.

International Journal of Production Economics, 125, 13–21.

Lakhal, L., Pasin, F., & Limam, M. (2006). Quality management

practices and their impact on performance. International

Journal of Quality & Reliability Management, 23, 625–646.

Land, M. J. (2009). Cobacabana (control of balance by card-based

navigation): A card-based system for job shop

control. International Journal of Production Economics, 117,

(12)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 213PDF page: 213PDF page: 213PDF page: 213 205

R

Land, M. J., & Gaalman, G. J. C. (1996). Workload control concepts

in job shops - A critical assessment. International Journal of

Production Economics, 46–47, 535–548.

Land, M. J., & Gaalman, G. J. C. (1998). The performance of

workload control concepts in job shops: Improving the

release method. International Journal of Production Economics,

56–57, 347–364.

Landis, R. S. (2013). Successfully Combining Meta-analysis and

Structural Equation Modeling: Recommendations and Strategies. Journal of Business and Psychology, 28, 251–261.

Laursen, K., & Foss, N. J. (2000). New human resource

management practices, complementarities and the impact on innovation performance. Cambridge Journal of Economics, 27,

243–263.

Law, A.M. Kelton, W. D. (2000). Simulation Modeling and Analysis. New York: McGraw-Hill.

Leuschner, R., Charvet, F. F., & Rogers, D. S. (2013). A

Meta-Analysis of Logistics Customer Service. Journal of Supply

Chain Management, 49, 47–63.

Leuschner, R., Rogers, D. S., & Charvet, F. F. (2013). A

Meta-Analysis of Supply Chain Integration and Firm Performance.

Journal of Supply Chain Management, 49, 34–57.

Li, D., Eden, L., Hitt, M. A., & Ireland, R. D. (2008). Friends,

acquaintances, or strangers? Partner selection in R&D alliances. Academy of Management Journal, 51, 315–334.

Mackelprang, A. W., & Nair, A. (2010). Relationship between

just-in-time manufacturing practices and performance: A meta-analytic investigation. Journal of Operations Management, 28,

(13)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 214PDF page: 214PDF page: 214PDF page: 214 206

R

Mackelprang, A. W., Robinson, J. L., Bernardes, E., & Webb, G. S. (2014). The relationship between strategic supply chain

integration and performance: A meta-analytic evaluation and implications for supply chain management research. Journal

of Business Logistics, 35, 71–96.

Meriac, J. P., Hoffman, B. J., & Woehr, D. J. (2014). A conceptual

and empirical review of the structure of assessment center dimensions. Journal of Management, 40, 1269–1296.

Mitchell, T. R., & Silver, W. S. (1990). Individual and group goals

when workers are interdependent: Effects on task strategies and performance. Journal of Applied Psychology, 75, 185–193.

Nair, A. (2006). Meta-analysis of the relationship between quality

management practices and firm performance-implications for quality management theory development. Journal of

Operations Management, 24, 948–975.

Naor, M., Goldstein, S. M., Linderman, K. W., & Schroeder, R. G. (2008). The role of culture as driver of quality management

and performance: Infrastructure versus core quality practices. Decision Sciences, 39, 671–702.

Netland, T. H. (2016). Critical success factors for implementing

lean production: the effect of contingencies. International

Journal of Production Research, 54, 2433–2448.

Oakland, J. S. (2008). Statistical process control. Oxford: Butterworth-Heinemann.

Öner-Közen, M., Minner, S., & Steinthaler, F. (2017). Efficiency of

paced and unpaced assembly lines under consideration of worker variability – A simulation study. Computers &

Industrial Engineering, 111, 516–526.

Ooi, K.-B., Arumugam, V., Teh, P.-L., & Chong, A. Y. (2008). TQM

practices and its association with production workers.

(14)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 215PDF page: 215PDF page: 215PDF page: 215 207

R

Oosterman, B., Land, M. J., & Gaalman, G. J. C. (2000). Influence of

shop characteristics on workload control. International

Journal of Production Economics, 68, 107–119.

Orlicky, J. A. (1976). Rescheduling With Tomorrow’s MRP

System. Production & Inventory Management, 17, 38–48.

Pereira, G. M., & Osburn, H. G. (2007). Effects of participation in

decision making on performance and employee attitudes: A quality circles meta-analysis. Journal of Business and

Psychology, 22, 145–153.

Piercy, N., & Rich, N. (2009). Lean transformation in the pure

service environment: the case of the call service centre.

International Journal of Operations & Production Management, 29, 54–76.

Portioli Staudacher, A., & Tantardini, M. (2012). Lean

implementation in non–repetitive companies: a survey and analysis. International Journal of Services and Operations

Management, 11, 385–406.

Powell, S. G., & Schultz, K. L. (2004). Throughput in Serial Lines

with State-Dependent Behavior. Management Science, 50,

1095–1105.

Powell, T. C. (1995). Total quality management as competitive

advantage: A review and empirical study. Strategic

Management Journal, 16, 15–37.

Prakash, J., & Chin, J. F. (2015). Modified CONWIP systems: a

review and classification. Production Planning & Control, 26,

296–307.

Qu, X. (2007). Multivariate Data Analysis. Technometrics, 49, 103– 104.

Radnor, Z., & Walley, P. (2008). Learning to walk before we try to

run: Adapting lean for the public sector. Public Money and

(15)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 216PDF page: 216PDF page: 216PDF page: 216 208

R

Riezebos, J. (2010). Design of POLCA material control systems.

International Journal of Production Research, 48, 1455–1477.

Samson, D., & Terziovski, M. (1999). The relationship between

total quality management practices and operational

performance. Journal of Operations Management, 17, 393–409.

Saraph, J. V., Benson, P. G., & Schroeder, R. G. (1989). An

Instrument for Measuring the Critical Factors of Quality Management. Decision Sciences, 20, 810–829.

Schroeder, R. G., Linderman, K. W., & Zhang, D. (2005). Evolution

of Quality: First Fifty Issues of Production and Operations Management. Production and Operations Management, 14,

468–481.

Schultz, K. L., Juran, D. C., & Boudreau, J. W. (1999). The Effects of

Low Inventory on the Development of Productivity Norms.

Management Science, 45, 1664–1678.

Schultz, K. L., Juran, D. C., Boudreau, J. W., McClain, J. O., Joseph, L., Thomas, L. J., & McClain, J. O. (1998). Modeling and

Worker Motivation in JIT Production Systems. Management

Science, 44, 1595–1607.

Schultz, K. L., McClain, J. O., & Thomas, L. J. (2003). Overcoming

the dark side of worker flexibility. Journal of Operations

Management, 21, 81–92.

Schultz, K. L., Schoenherr, T., & Nembhard, D. (2010). An Example

and a Proposal Concerning the Correlation of Worker Processing Times in Parallel Tasks. Management Science, 56,

176–191.

Seta, J. J. (1982). The impact of comparison processes on coactors’

task performance. Journal of Personality and Social

(16)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 217PDF page: 217PDF page: 217PDF page: 217 209

R

Shadish, W. R., Cook, T. D., & Campbell, D. T. (2002). Experimental and Quasi-Experimental Designs For Generalized Causal Inference. Independence: Wadsworth Cengage Learning.

Shah, R., Chandrasekaran, A., & Linderman, K. (2008). In pursuit of

implementation patterns: the context of Lean and Six Sigma.

International Journal of Production Research, 46, 6679–6699.

Shah, R., & Ward, P. T. (2003). Lean manufacturing: Context,

practice bundles, and performance. Journal of Operations

Management, 21, 129–149.

Shah, R., & Ward, P. T. (2007). Defining and developing measures

of lean production. Journal of Operations Management, 25,

785–805.

Shenawy, E. El, Baker, T., & Lemak, D. J. (2007). A meta-analysis

of the effect of TQM on competitive advantage. International

Journal of Quality & Reliability Management, 24, 442–471.

Shunko, M., Niederhoff, J., & Rosokha, Y. (2017). Humans Are Not

Machines: The Behavioral Impact of Queueing Design on Service Time. Management Science.

Sivasubramaniam, N., Liebowitz, S. J., & Lackman, C. L. (2012).

Determinants of New Product Development Team

Performance: A Meta-analytic Review. Journal of Product

Innovation Management, 29, 803–820.

Slomp, J., Bokhorst, J. a. C., & Germs, R. (2009). A lean production

control system for high-variety/low-volume environments: a case study implementation. Production Planning & Control,

20, 586–595.

Sousa, R. (2003). Linking quality management to manufacturing

strategy: An empirical investigation of customer focus practices. Journal of Operations Management, 21, 1–18.

(17)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 218PDF page: 218PDF page: 218PDF page: 218 210

R

Sousa, R., & Voss, C. A. (2001). Quality Management: Universal

or Context Dependent? Production and Operations

Management, 10, 383–404.

Sousa, R., & Voss, C. A. (2002). Quality management re-visited: A

reflective review and agenda for future research. Journal of

Operations Management, 20, 91–109.

Spearman, M. L., Woodruff, D. L., & Hopp, W. J. (1990). CONWIP,

a pull alternative to kanban. International Journal of

Production Research, 28, 879–894.

Steiner, I. D. (1972). Group process and productivity. New York. Academic Press.

Stentoft Arlbjørn, J., & Vagn Freytag, P. (2013). Evidence of lean: a

review of international peer‐reviewed journal articles.

European Business Review, 25, 174–205.

Stevenson, M., Hendry, L. C. L., Kingsman, B. G., Stevenson, M., & Hendry, L. C. L. (2005). A review of production planning and

control: the applicability of key concepts to the make-to-order industry. International Journal of Production Research,

43, 869–898.

Sugimori, Y., Kusunoki, K., & Cho, F. (1977). Toyota production

system and Kanban system Materialization of just-in-time and respect-for-human system. International Journal of

Production Research, 15, 553–564.

Suls, J., Martin, R., & Wheeler, L. (2002). Social comparison: Why,

with whom, and with what effect? Current Direction in

Psychological Science, 11, 159–163.

Suri, R. (1998). Quick response manufacturing : a companywide approach to reducing lead times. Productivity Press.

Tan, T., & Netessine, S. (2014). When Does the Devil Make Work?

An Empirical Study of the Impact of Workload on Worker Productivity. Management Science, 60, 1574–1593.

(18)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 219PDF page: 219PDF page: 219PDF page: 219 211

R

Thomas, J. P., Whitman, D. S., & Viswesvaran, C. (2010).

Employeeproactivity in organizations: Ac omparative meta-analysis of emergent proactiveconstructs. Journal of

Occupational & Organizational Psychology, 83, 275–300.

Thürer, M., Fernandes, N. O., Stevenson, M., & Qu, T. (2017). On

the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an

assessment by simulation. International Journal of Production

Research, 55, 4695–4711.

Thürer, M., Land, M. J., & Stevenson, M. (2014). Card-based

workload control for job shops: Improving

COBACABANA. International Journal of Production

Economics, 147, 180-188.

Thürer, M., Stevenson, M., & Protzman, C. (2016a). Card-based control systems for a lean work design : the fundamentals of kanban, ConWIP, POLCA, and COBACABANA. Boca Raton: CRC Press.

Thürer, M., Stevenson, M., & Protzman, C. W. (2016b). Card-based

production control : a review of the control mechanisms underpinning Kanban , ConWIP , POLCA and

COBACABANA systems. Production Planning & Control, 27,

1–15.

Thürer, M., Stevenson, M., & Silva, C. (2016). Three decades of

workload control research : a systematic review of the

literature of the literature. International Journal of Production

Research, 49, 6905–6935.

Tortorella, G. L., Miorando, R., & Marodin, G. (2017). Lean Supply

Chain Management: Empirical research on practices,

contexts and performance. International Journal of Production

(19)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 220PDF page: 220PDF page: 220PDF page: 220 212

R

Van Eerde, W., & Thierry, H. (1996). Vroom’s Expectancy Models

and Work-Related Criteria: A Meta-Analysis. Journal of

Applied Psychology, 81, 575–586.

Vandaele, N. J., Van Nieuwenhuyse, I., Claerhout, D., & Cremmery, R. (2008). Load-Based POLCA: An Integrated Material

Control System for Multiproduct, Multimachine Job Shops.

Manufacturing & Service Operations Management, 10, 181–197.

Viswesvaran, C., & Ones, D. S. (1995). Theory testing: Combining

psychometric meta-analysis and structural equations modeling. Personnel Psychology, 48, 865–885.

Vroom, V. (1964). Expectancy theory. Work and motivation. San Francisco: Jossey-Bass.

Weber, B., & Hertel, G. (2007). Motivation gains of inferior group

members: A meta-analytical review. Journal of Personality

and Social Psychology, 93, 973–993.

Weber, B., Wittchen, M., & Hertel, G. (2009). Gendered ways to

motivation gains in groups. Sex Roles, 60, 731–744.

White, G. P. (1996). A meta-analysis model of manufacturing

capabilities. Journal of Operations Management, 14, 315–331.

White, R. E., Pearson, J. N., & Wilson, J. R. (1999). JIT

Manufacturing : A Survey of Implementations in Small and Large US Manufacturers, 45, 1–15.

Wittchen, M., Schlereth, D., & Hertel, G. (2007). Social

indispensability in spite of temporal and spatial separation: motivation gains in a sequential task during anonymous cooperation on the internet. International Journal of Internet

Science, 2, 12–27.

Zhang, G. P., & Xia, Y. (2013). Does quality still pay? A

reexamination of the relationship between effective quality management and firm performance. Production and

(20)

517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM 517640-L-bw-Ziengs-SOM Processed on: 14-3-2018 Processed on: 14-3-2018 Processed on: 14-3-2018

Processed on: 14-3-2018 PDF page: 221PDF page: 221PDF page: 221PDF page: 221 213

R

Ziengs, N., Riezebos, J., & Germs, R. (2012). Placement of effective

work-in-progress limits in route-specific unit-based pull systems. International Journal of Production Research, 50,

4358–4371.

Zimmermann, F., & Foerstl, K. (2014). A Meta-Analysis of the

“Purchasing and Supply Management Practice-Performance Link.” Journal of Supply Chain Management, 50, 37–54.

Zu, X. (2009). Infrastructure and core quality management

practices: how do they affect quality? International Journal of

Quality & Reliability Management, 26, 129–149.

Zu, X., Fredendall, L. D., & Douglas, T. J. (2008). The evolving

theory of quality management: The role of Six Sigma. Journal

of Operations Management, 26, 630–650.

Zu, X., Robbins, T. L., & Fredendall, L. D. (2010). Mapping the

critical links between organizational culture and TQM/Six Sigma practices. International Journal of Production

(21)

Referenties

GERELATEERDE DOCUMENTEN

Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of

Therefore, the high accident risk of novice drivers may partly be associated with driving behaviour itself, but also partly with the circumstances under which the young drivers

No part of this publication may be reproduced, stored in a retrieval system of any nature, or transmitted in any form or by any means, electronic, mechanical, now known

As another example, manufacturers can use different types of cards and different implementations of work-in-progress restrictions to create a unique implementation of the lean

The first stage examines the correlation between the set of quality management practices as a whole (process management; production design and management; quality data

Figure 3.4 shows the absolute throughput time performance of the route-specific unit-based pull production system for the three and four- stage topology given the

The average processing times of the middle participants in the conjunctive with no work-in-progress restriction and conjunctive with separate work-in-progress restrictions

In this study, we showed how the placement of route- specific work-in-progress restrictions affects the effective workload balancing capability of a unit-based pull