• No results found

Torture test for pdftex and etex

N/A
N/A
Protected

Academic year: 2021

Share "Torture test for pdftex and etex"

Copied!
2
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Torture test for pdftex and etex

1. Test for \NewList (and \ShowList)

BEGIN{MyList} (empty list) END{MyList}

2. Tests for \Insert...

With \InsertFirstItem BEGIN{MyList} (4 elements) MyList[0] = fourth MyList[1] = third MyList[2] = second MyList[3] = first END{MyList}

We test \ClearList since we’ll use it many times: BEGIN{MyList} (empty list)

END{MyList} With \InsertLastItem BEGIN{MyList} (4 elements) MyList[0] = first MyList[1] = second MyList[2] = third MyList[3] = fourth END{MyList}

With \InsertItem with indexes 0, 0, 2, 1 BEGIN{MyList} (4 elements) MyList[0] = second MyList[1] = fourth MyList[2] = first MyList[3] = third END{MyList}

(2)

With \InsertList

BEGIN{MyList} (4 elements) MyList[0] = first of Mylist MyList[1] = second of Mylist MyList[2] = third of Mylist MyList[3] = fourth of Mylist END{MyList}

BEGIN{OtherList} (4 elements) OtherList[0] = first of Otherlist OtherList[1] = second of Otherlist OtherList[2] = third of Otherlist OtherList[3] = fourth of Otherlist END{OtherList}

Insertion at index 2

BEGIN{MyList} (8 elements) MyList[0] = first of Mylist MyList[1] = second of Mylist MyList[2] = first of Otherlist MyList[3] = second of Otherlist MyList[4] = third of Otherlist MyList[5] = fourth of Otherlist MyList[6] = third of Mylist MyList[7] = fourth of Mylist END{MyList}

BEGIN{OtherList} (4 elements) OtherList[0] = first of Otherlist OtherList[1] = second of Otherlist OtherList[2] = third of Otherlist OtherList[3] = fourth of Otherlist END{OtherList}

Referenties

GERELATEERDE DOCUMENTEN

Complex manufacturing machines, like ASML wafer scanners, consist of thou- sands of components like electronic boards, software, mechanical parts and op- tics. These components

While the functional behavior of a circuit in the frequency domain may not be linear, or even in the dc domain as a result of a nonlinear function between output and input

If a user of the simulator wants to replace the application of the railroad crossing by another, he has to put the code of the tasks in this file, make new Event- and Task Tables

Deze nieuwe rating wordt bepaald met behulp van het aantal punten P dat de speler met de partij scoorde (0 of 0,5 of 1) en de vooraf verwachte score V bij de partij voor de

The cost component includes the shadow price for materials and equipment used, labour, contractor operating costs, project management costs, overhead costs, and normal profit —

Answer to the test for Eckert John

The Box-Cox power transformation of out- lier scores is unlikely to be useful when the range of the outlier scores is small (Hoaglin et al., 1983, pp. For outlier scores Of and G}

The item parameter estimates ( β) and discrimination indices (A) were used to evaluate the items with respect to differences between (a) the TIR-I and the TIR-II; (b) picture items