• No results found

Date compiled: 2011/05/03Borehole Construction and Geological LogSite Identifier:Number:Reg./BB.:G-Nr.:

N/A
N/A
Protected

Academic year: 2021

Share "Date compiled: 2011/05/03Borehole Construction and Geological LogSite Identifier:Number:Reg./BB.:G-Nr.:"

Copied!
1
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Date compiled: 2011/05/03

Borehole Construction and Geological Log

Site Identifier:

Number:

Reg./BB.:

G-Nr.:

2331CCX0026

NPM12S

Site Name/Des.:

Distr./Farm No.:

30

WEGSTEEK PTN. NORTH-EAST OF WASTE DUMP

23.964670

31.120370

165

BASIC SITE INFORMATION:

Depth [m]:

24.00

Altitude [m]:

430.00

Diam. [mm]:

Coord. acc.:

Topo-set.:

Drain. reg.:

B72K

Coord. meth.:

Col. ht. [m]:

Site type: Borehole

Equipment: No equipment

Site purp.:

Production (water supply)

Site status:

Domestic - all purposes

Use applic.:

Unused

Rep. inst.:

GOLD

Region Type:

Water supply authority

Region Descr.: BA-PHALABORWA LM

Coordinate System: Geographic Decimal Degrees (Longitude/Latitude), Hartebeesthoek94 (WGS 84)

Accurate to within 10 units

Global Positioning System

Latitude [°]:

Longitude [°]:

Lithology

D

e

p

th

[m

]

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

0

PYROXENIT E: Greyish green, fine to medium; Fill material

GRANIT E: Pinkish red, medium to coarse, very weathered;

GRANIT E: Pinkish red, medium to coarse, slightly fractured; Penetr. rate [Min./m] 2 1 0 Construction

D

e

p

th

[

m

]

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

0

254 165 165

Construction and Geohydrological Legend

Hole

Casing (plain / perforated, sloted)

Screen / Mesh Screen Waterlevel measured: 11/04/11 Hole diameter [mm] Casing diameter [mm] 165

0:50 152

Piezometer Piezometer (Nr. & Diameter [mm])

Sanitary seal Gravel ( > 2mm)

User name and adress

Page 1

Referenties

GERELATEERDE DOCUMENTEN

4.1.1 Geotechnical investigations for excavations and lateral support shall be carried out in accordance with the requirements of SAICE (1989) and the requirements of

Category

When a down has to be escalated to the headquarters, the 2 nd line engineers have to collect al the necessary data and information, fill in ASML-Q, and verbally communicate

The sources of evidences for hypothesis 1 (Appendix D) indicate mainly two categories of reasons related to the priority of energy efficiency in the management of an

Equipment: No equipment Site purp.:.

Coordinate System: Geographic Decimal Degrees (Longitude/Latitude), Cape Datum (Mod. & Diameter [mm]). Sanitary seal Drill

Global Positioning System Latitude [°]: Longitude [°]: Lithology D ep th [m] 60 55 50 45 40 35 30 25 20 15 10 5 0 OVERBURDEN: Dark brown, fi ne cl ayey;. PYROXENIT E: Greyish

PYROXENIT E: Greeni sh grey, fine to medium, sli ghtly fractured fresh; Mi caceous. PYROXENIT E: Greeni sh grey, fine to medium fresh