Photovoltaic system and components price development in the Netherlands

Wilfried van Sark1,2, Tony Schoen3

1 Stichting Monitoring Zonnestroom (SMZ), Utrecht, The Netherlands 2 Utrecht University, Copernicus Institute, Utrecht, The Netherlands 3 New-Energy-Works (NEW), Utrecht, the Netherlands

Introduction

The Dutch photovoltaic (PV) market has been growing very fast in the past years, with 2 GW installed capacity at the end of 2016.

Market research to assess the development of the cost of modules, inverters, and complete systems has been performed since October 2011 [1,2].

Average selling price of modules, inverters, and systems decreased considerably, predominantly in the year 2012.

Here, we provide an update, status end 2016, based on publically available data. Note: data is including VAT.

Market status December 2016

References

[1] W.G.J.H.M. van Sark, P. Muizebelt, J. Cace, A. de Vries, P. de Rijk, Price Development of Photovoltaic Modules, Inverters, and Systems in the Netherlands in 2012, Renewable Energy 71 (2014) 18-22.

[2] CBS Statline, http://statline.cbs.nl/statweb/, last access date 18 September 2017

With support from

Modules

Price reduction of 48.4% since October 2011, stable since 2014.

Dynamic market, expensive modules replaced by cheaper ones, and new brands/types ~25% each quarter.

Module country of origin

Average module price:

All: 1.11 €/Wp

From China: 0.97 €/Wp

From other than China: 1.18 €/Wp

Faculty of Geosciences Copernicus Institute Energy & Resources

Inverters

Price reduction of 40.2% since October 2011, steady decrease.

Systems (excluding installation)

Price reduction of 20% since 2011, however increase in 2013 and 2016 observed.

System price is size dependent

Typical system prices, including installation. Levelized cost of electricity calculated with 900 kWh/kWp, 3% interest rate, 1% O&M, 25 year lifetime

Conclusion

PV module price is stable, while inverter price decreases System price increases, however grid parity is obvious PV modules October 2011 December 2016

Average price 2.28 €/Wp 1.109 €/Wp Average

capacity 140 Wp/m2 151 Wp/m2

# modules 166 1348

Technology c-Si (mono/poly) 52% c-Si, 43%

p-Si, thin film

Inverters October 2011 December 2016

Average price 0.45 €/Wp 0.29 €/Wp

EU efficiency 95.1% 96.1 %

# inverters 98 777

Systems April 2012 December 2016 Average price

(ex installation) tilted: 1.63 €/Wp

flat: 1.67 €/Wp tilted: 1.32 €/Wp flat: 1.39 €/Wp

# systems tilted: 1557

flat: 1477 tilted: 24234 flat: 24234 Average

installation 0.40 €/Wp 0.34 €/Wp

System size

kWp Price

€/Wp Installation

€/Wp Total

€/Wp LCoE

€/kWh

0.6 1.50 0.60 2.10 0.157

2.5 1.37 0.40 1.77 0.133

5 1.26 0.30 1.56 0.117

50 1.14 0.20 1.34 0.100

Referenties

GERELATEERDE DOCUMENTEN

• The Akaike Information Criterion score indicates that using the “cheapest basket” as price level gives the best performing model  lowest price products could be an

So since it is expected that because of high information transparency consumers will especially perceive durable products as less complex in the online channel, and with that

In the first FE panel regression model without control variables the mean sea level is positively associated with the average house price and is significant.. A sea

In order to further refine this result, Model (4) includes dummies for the length of the time gap in between listings (Rel07 and Rel830). Results show a significant and

We have systematically varied motor speed and density in filaments confined to a pressurised cylindrical cell, and have uncovered four qualitatively different types of steady

(1997) report that contractionary monetary policy accounts for the decline in aggregate economic activity following an oil price increase. If prices are sticky downward, an oil

We have presented two ways in which to achieve coordination by design: concurrent decomposition, in which all agents receive tasks with an additional set of constraints prior

The game contains five stages (see fig. In stage zero, one of the incentive systems of TIS and PIS, !'", is established and fixed for both periods. While this probability is