• No results found

Drought research & applications

N/A
N/A
Protected

Academic year: 2022

Share "Drought research & applications"

Copied!
3
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Drought research & applications

Drought Operations

 Drought briefing each month

 Objective drought monitoring : using drought indices to identify and classify drought and persistent wet spells

 Attribution

Drought related research Funding: CPPA

Our focus for the next few years:

 Drought prediction for the U. S. out to 3 months based on CFS

 Expand drought monitoring to cover Pan America based on the CFSR

 Use satellite derived indices for monitoring (CTB funding.

New project)

(2)

Drought research & applications

Project: Improve streamflow forecasts at the CBRFC

Funding source: TRACS Work on going:

A) Improve Evaporation by improve PET for the San Juan basin

B) Test whether dynamical downscaling will improve hydrological forecasts,

C) Test using daily forecast information to improve streamflow forecasts at the CBRFC

Benefits:

 Improve NLDAS models (EMC/NCEP)

 Improve drought prediction at the CPC

 Improve RFC streamflow prediction at the CBRFC

 Better coordination with the OHD , EMC and CPC

(3)

Drought research & applications

Project: Seasonal forecasts and hydrological applications over the Southeast

Funding source: TRACS Work on going:

A) Improve and test the EMC/Princeton system to forecast soil moisture, runoff and standardized precipitation

indices over the Southeast

B) Develop applications for specific river basins over the Southeast

C) Forecast SPI index out to 6 months based on the CFS forecasts after bias correction

Benefits:

 Improve CPC drought prediction :

 Improve RFC streamflow prediction at the SERFC

Referenties

GERELATEERDE DOCUMENTEN

provide a solution to solve the problems at Larsen Premium Precision Parts?” and “Are there alternative solutions that can/need to be considered?”. Results show that

A0 Road mapping A1 Function creation process A2 Product creation process A3 Mass production Business strategy Marketing information Technology forcast Product plan Product

More than 70% of the municipalities and building corporations want to see the reasons for the training, the learning goals, the approach to the training, the working model, the

The total number of returns is predicted using classification of return requests by the Logistic Regression and the timing by Poisson Regression and Negative Binomial Regression.

Process stage Horizon Aggregation level Time buckets Base demand forecast 24 Months FC Commercial Product Code Months Promotional demand forecast Year to go FC Commercial Product

Staff turnover rate at Gracesemi in 2007 is 66.7%; totally 6 employees left SA unit and the average total number employed during 2007 is 9. Literature searching shows that there is

It seemed that the project workers of project Aanmeer did the project almost without their project leader and that project BZVG had a project leader who did not have a

The functional design pattern contains a number of sub patterns, based on the type of history that the data is required to have in the Management Information System: without a