Appendix B The calculation of the lead time

N/A
N/A
Protected

Academic year: 2021

Share "Appendix B The calculation of the lead time "

Copied!
3
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Appendix A The calculation of the delivery reliability

System WeekT >LB <-2 LB -2 LB -1 LB 0 LB 1 LB 2 LB 3 LB >3 Total In timeToo lateReliability

SI 62 47 0 0 18 42 1 0 0 0 61 60 1 98%

SI 62 48 0 0 32 55 0 1 0 0 88 87 1 99%

SI 62 49 0 0 38 34 8 1 0 0 81 72 9 89%

SI 62 50 0 0 36 38 0 0 0 0 74 74 0 100%

SI 62 51 0 1 21 78 1 0 0 0 101 100 1 99%

SI 62 52 0 0 24 70 2 0 0 0 96 94 2 98%

SI 62 53 0 0 11 44 10 0 0 0 65 55 10 85%

SI 62 1 0 1 6 55 5 0 0 0 67 62 5 93%

SI 62 2 0 0 22 67 3 1 1 0 94 89 5 95%

SI 62 3 0 0 36 67 6 0 0 0 109 103 6 94%

SI 62 4 0 0 2 40 1 0 0 0 43 42 1 98%

SI 62 5 0 0 49 82 0 0 0 0 131 131 0 100%

SI 62 6 0 1 78 40 0 0 0 0 119 119 0 100%

SI 62 7 0 0 56 40 0 0 0 0 96 96 0 100%

SI 62 8 0 1 58 41 5 0 0 0 105 100 5 95%

SI 62 9 0 0 68 20 0 0 0 0 88 88 0 100%

SI 62 10 0 1 57 17 0 0 0 0 75 75 0 100%

SI 62 11 0 0 65 4 0 0 0 0 69 69 0 100%

SI 62 12 0 0 70 26 0 0 0 0 96 96 0 100%

SI 62 13 0 0 31 27 0 0 0 0 58 58 0 100%

SI 62 14 0 0 36 46 0 0 0 0 82 82 0 100%

SI 62 15 0 1 13 57 0 0 0 0 71 71 0 100%

SI 62 16 0 0 9 85 0 0 0 0 94 94 0 100%

SI 62 17 0 1 19 75 0 0 0 0 95 95 0 100%

SI 62 18 0 0 58 23 0 0 0 0 81 81 0 100%

SI 62 19 0 0 38 51 0 0 0 0 89 89 0 100%

Total shipments 2228

Average reliability 98%

This data is derived from the weekly generated administration on delivery reliability.

Therefore LB is a Dutch abbreviation and can be translated to Delivery reliability. If an order is delivered in the agreed upon week this would be stated as LB 0. One week earlier is LB –1 etc.

(2)

Appendix B The calculation of the lead time

OpCo System Period LT 0 LT 1 LT 2 LT 3 LT 4 LT avg

All OpCos SI 62 200447 0 7 50 2 0 1,9

All OpCos SI 62 200448 0 28 38 17 3 1,7

All OpCos SI 62 200449 0 28 34 11 3 1,8

All OpCos SI 62 200450 0 14 48 5 2 1,7

All OpCos SI 62 200451 1 6 73 19 0 1,9

All OpCos SI 62 200452 0 17 56 12 9 1,8

All OpCos SI 62 200453 0 0 33 4 7 2,4

All OpCos SI 62 200501 0 6 23 24 6 2,5

All OpCos SI 62 200502 0 0 37 43 2 2,7

All OpCos SI 62 200503 0 13 25 51 10 2,4

All OpCos SI 62 200504 1 0 27 14 1 2,3

All OpCos SI 62 200505 1 42 46 23 19 1,9

All OpCos SI 62 200506 1 58 31 8 5 1,3

All OpCos SI 62 200507 0 21 64 0 7 1,7

All OpCos SI 62 200508 1 42 36 7 1 2

All OpCos SI 62 200509 2 49 12 9 1 1,2

All OpCos SI 62 200510 1 44 14 0 16 1,2

All OpCos SI 62 200511 0 33 13 2 9 1,7

All OpCos SI 62 200512 0 41 39 0 16 1,5

All OpCos SI 62 200513 0 14 28 3 0 1,7

All OpCos SI 62 200514 1 9 49 16 7 2,1

All OpCos SI 62 200515 0 2 66 2 0 2

All OpCos SI 62 200516 0 0 71 1 0 2

All OpCos SI 62 200517 0 2 19 24 0 2,5

All OpCos SI 62 200518 0 0 6 15 0 2,7

All OpCos SI 62 200519 0 0 16 25 34 3,2

Total shipments 1934 1,992308

This data is derived from the weekly generated administration on delivery time. Therefore LT is an Dutch abbreviation for delivery time. LT 0 delivery found place the same week as the order was taken in. LT 1 means that delivery took place one week later.

(3)

Appendix C The calculation of value finished goods and components

The value of the inventory is calculated by the formula presented here with a Z value of 0,67 this corresponds with a service level of 75%

SI 62 SI 68 SI 92 IM 3003

Forecast 4000 3150 450 96

Value components 121.107 106.734 79.431 24.645

Fluctuation 0,50 0,50 0,50 -

Lead time 13 13 13 13

SI 62 SI 68

Forecast 4000 3150

Value components 116.356,06 102.546,24

Fluctuation 0,50 0,50

Lead time 12 12

SI 92

Forecast 450

Value components 79.431

Fluctuation 0,50

Lead time 14

ns fluctuatio factor

inventory = • 13• •

50 Forecast

The lead time accounts for the number of weeks Neopost Technologies needs to replenish the inventory. When the delivery time policy is shortened by one week the current lead time of 13 is reduced by one week and vice versa. The SI 62 and the SI 68 are therefore calculated with a lead time of 12 and the SI 92 with a lead time of 14. The inventory value of 3 for the IM 3003 is manually determined and is no relationship with the formula presented.

Referenties

GERELATEERDE DOCUMENTEN

The objective of this study is to identify how different time effects affect consumers’ choices for vices in an online channel. More specifically, this research seeks to explore

The research question is: How can future acute patients who need an MRI scan be diagnosed within 24 hours and how can access within 15 minutes be achieved for acute stroke

- This alternative uses a ‘cell layout’ for the test facilities resulting in a decrease of the lead time of TCS and the possibility of using a pull system in order to decrease

Appendix 14: Lead time of test facilities with new sequence of operations Appendix 15: Test facility occupation with new sequence of operations Appendix 16: Lead time of test

By using this tool, the process orders out of the melting department as well as the finishing process orders can be linked by campaign and lot numbers.. Nevertheless it is

It seems that the logistical performance can be significantly improved in inventory costs and delivery reliability by lengthening the delivery time of the SI 92 to four weeks

All calculated distributions are pseudo-Wigner distributions, but we will nevertheless call them Wigner distributions in this section, since the Wigner distribution and

In that case the common capacity provides the flexibility of scheduling in production orders of items for which a stockout occurs within the customer lead time, while scheduling