Appendix A: Throughput diagrams and utilization levels

The rods department

I-O Diagram Shortening

0 10000 20000 30000 40000 50000 60000 70000

17-01-05 27-01-05 06-02-05 16-02-05 26-02-05 08-03-05 18-03-05 28-03-05 07-04-05 Date

Cum. processing time (shortening min.)

Enquiry Acceptation

Release = Arrival (shortening) Completion (shortening) Order completion

Figure A.1: Throughput diagram shortening.

Shortening

0,0%

20,0%

40,0%

60,0%

80,0%

100,0%

19-1-2005 2-2-2005 16-2-2005 2-3-2005 16-3-2005 30-3-2005 13-4-2005

Utilisation Non-production

Figure A.2: Utilization curve shortening.

(2)

I-O Diagram Flattening-2

0 2000 4000 6000 8000 10000 12000 14000

17-01-05 27-01-05 06-02-05 16-02-05 26-02-05 08-03-05 18-03-05 28-03-05 07-04-05 Date

Cum. processing time (flattening-2 min.)

Enquiry Acceptation Release

Completion (shortening) Arrival (flattening-2) Completion (flattening-2) Order completion

Figure A.3 Throughput diagram flattening-2.

Flattening-2

0,0%

10,0%

20,0%

30,0%

40,0%

50,0%

60,0%

70,0%

80,0%

19-1-2005 2-2-2005 16-2-2005 2-3-2005 16-3-2005 30-3-2005 13-4-2005

Utilisation Non-production

Figure A.4: Utilization curve flattening-2.

(3)

I-O Diagram 160 Ton

0 5000 10000 15000 20000 25000

17-01-05 27-01-05 06-02-05 16-02-05 26-02-05 08-03-05 18-03-05 28-03-05 07-04-05 Date

Cum. processing time (160 Ton min.)

Enquiry Acceptation Release

Completion (shortening) Arrival (160 Ton) Completion (160 Ton) Order completion

Figure A.5: Throughput diagram 160 Ton.

160 Ton

0,0%

20,0%

40,0%

60,0%

80,0%

100,0%

120,0%

19-1-2005 2-2-2005 16-2-2005 2-3-2005 16-3-2005 30-3-2005 13-4-2005

Utilisation Non-production

Figure A.6: Utilization curve 160 Ton.

(4)

I-O Diagram Bulging

0 5000 10000 15000 20000 25000 30000 35000

17-01-05 27-01-05 06-02-05 16-02-05 26-02-05 08-03-05 18-03-05 28-03-05 07-04-05 Date

Cum. processing time (bulging min.)

Enquiry Acceptation Release

Completion (shortening) Arrival (bulging) Completion (bulging) Order completion

Figure A.7: Throughput diagram bulging.

Bulging

0,0%

20,0%

40,0%

60,0%

80,0%

100,0%

120,0%

19-1-2005 2-2-2005 16-2-2005 2-3-2005 16-3-2005 30-3-2005 13-4-2005

Utilisation Non-production

Figure A.8: Utilization curve bulging.

(5)

The assembly department

I-O Diagram Riveting-2

0 20000 40000 60000 80000 100000 120000

17-01-05 27-01-05 06-02-05 16-02-05 26-02-05 08-03-05 18-03-05 28-03-05 07-04-05 Date

Cum. processing time (riveting-2 min.)

Enquiry Acceptation Release

Completion (shortening) Arrival (pressing) Completion (pressing) Arrival (riveting-2) Order completion (riveting-2)

Figure A.9: Throughput diagram riveting-2.

Riveting-2

0,0%

10,0%

20,0%

30,0%

40,0%

50,0%

60,0%

70,0%

80,0%

19-1-2005 2-2-2005 16-2-2005 2-3-2005 16-3-2005 30-3-2005 13-4-2005

Utilisation Non-production

Figure A.10: Utilization curve riveting-2.

(6)

I-O Diagram Riveting-3

0 5000 10000 15000 20000 25000 30000 35000

17-01-05 27-01-05 06-02-05 16-02-05 26-02-05 08-03-05 18-03-05 28-03-05 07-04-05 Date

Cum. processing time (riveting-3 min.)

Enquiry Acceptation Release

Completion (shortening) Arrival (pressing) Completion (pressing) Arrival (riveting-3) Order completion (riveting-3)

Figure A.11: Throughput diagram riveting-3.

Riveting-3

0,0%

10,0%

20,0%

30,0%

40,0%

50,0%

19-1-2005 2-2-2005 16-2-2005 2-3-2005 16-3-2005 30-3-2005 13-4-2005

Utilisation Non-production

Figure A.12: Utilization curve riveting-3.

(7)

I-O Diagram Riveting-4

0 1000 2000 3000 4000 5000 6000 7000 8000 9000

17-01-05 27-01-05 06-02-05 16-02-05 26-02-05 08-03-05 18-03-05 28-03-05 07-04-05 Date

Cum. processing time (riveting-4 min.)

Enquiry Acceptation Release

Completion (shortening) Arrival (pressing) Completion (pressing) Arrival (riveting-4) Order completion (riveting-4)

Figure A.13: Throughput diagram riveting-4.

Riveting-4

0,0%

20,0%

40,0%

60,0%

80,0%

100,0%

120,0%

19-1-2005 2-2-2005 16-2-2005 2-3-2005 16-3-2005 30-3-2005 13-4-2005

Utilisation Non-production

Figure A.14: Utilization curve riveting-4.

Referenties

GERELATEERDE DOCUMENTEN

The specific study in this category included in the present literature review was carried out in the context of higher online education, but there are, of course, diverse

Our test for hypothesis one did not show any significant results, indicating there is no significant moderation effect of the ease of doing business of a target country on

The major finding of the paper is that while Nyabongo sees Western education as a threat to the survival of African indigenous education, as well as the norms, customs and beliefs it

Formalization in CTL∗ : For the path formula ψ that selects the “interesting” paths, the path formula ϕ denoting the additional requirement for completing paths, and the state

Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of

Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of

Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of

Aron rapport 183    Kortessem (Guigoven) – Sint‐Sebastiaanstraat   6 3. Onderzoeksresultaten    3.1  Bodemopbouw en gaafheid van het terrein