Delta Infrastructure

DROUGHT EVENT SIMULATION

AND DROUGHT RISK ANALYSIS

p Updating the Jalaur River Basin Master Plan in the Philippines

Co-development of a meta-model for the Bangladesh Delta Plan 2100

25

R&D Highlights 2018

PARTICIPATORY AND COLLABORATIVE

MODELLING: KEY TO SUSTAINABLE

AND INCLUSIVE DEVELOPMENT

T

he lack of knowledge about the system of water resources, disagreements between water users and an inadequate focus on operationalisation are frequent causes of limited acceptance and problems with the practical implementation of IWRM plans. Informed decision-making and stakeholder engagement in the planning and decision-making processes are therefore important to create the enabling conditions for sus-tainable water-resource planning and management.

Participatory and collaborative modelling can further sustainable development since it supports informed decision- making and inclusive development. We have looked at how to develop and use computer-based simulation models with a participatory or collaborative modelling approach for managing water resources in

order to improve their use and strengthen ownership. In essence, participatory and collaborative modelling helps to bring modellers, stakeholders and makers together to improve the decision-making process. Typically, these parties are involved in water resources management but they tend to follow separate pathways. On the one hand, technical experts build analytical models to provide institutions with high-quality information. On the other, stakeholders engage in consultations about existing problems in the river basin and help to develop possible interventions. These two pathways are often in parallel and tend to meet only at the beginning of the process when data is being collected and at the end when model results are presented for discus sion and decision-making. Stakeholders often have little option but to accept the results obtained by the technical experts. They tend to see models as ‘black boxes’ which they understand poorly and in which they lack confidence; they are therefore often suspicious about the outcomes and decisions made. Participatory and collaborative modelling establishes strong connections between technical experts and stakeholders. Stakeholders feel they are part of the process as their knowledge, interests and needs are actively considered and valued. Together, technical experts and stakeholders build consensus, they have a sense of ownership of the solutions developed and they trust the decision-making process. Moreover, the use of participatory and collaborative modelling makes the modelling process

more efficient. The combination of both technical and local knowledge helps to establish a more accurate model. Data collection does not become a bottle neck in the modelling process and models can be validated faster.

Nine study cases were used to develop and test four methods for participatory and collaborative modelling. The topics and countries include river basin planning in Indonesia and the Philippines, water quality management in Turkey and Indonesia, adaptive planning in Bangladesh, groundwater management in the Netherlands, and flood risk management in the Netherlands and Tanzania.

Contact

Laura Basco Carrera, Laura.bascocarrera@ deltares.nl, t +31 (0)6 3063 1097

Further reading

https://publicwiki.deltares.nl/display/CM/ Collaborative+Modelling+in+Deltares

In line with the Sustainable

Development Agenda 2030,

Integrated Water Resources

Management (IWRM) is seen as

the process which promotes the

coordinated development and

management of water, land and

related resources to achieve

sustainable development.

Lessons learnt from the past

show that the implemen tation

of IWRM encounters major

difficulties if most stakeholders

continue to use tradi

tio

nal

planning mechanisms

Referenties

GERELATEERDE DOCUMENTEN

Weens die sukses wat hierdie Museum reeds behaal het in die maak van veselglasreplikas van groot soogdiere is daar gedurende 1973, toe te Skukuza vir hierdie

As the aim of this research is to see the implementation of collaborative planning in CBNRM, some of those characteristics can be visualized into three: public

As  one  of  the  main  improvement  points  of  the  Environment  and  Planning  Act  is  to  integrate  and  enhance   consistency  in  the  physical

Water quality management is not yet sufficiently integrated in river basin management in Indonesia, which mainly focuses on water quantity.. Women are comparatively highly impacted

This CIENS-report sums up the main findings from the project “Cultural Heritage and Water Management in Urban Planning” (Urban WATCH), financed by the Research Council of

1 – No assessment of erosion and sedimentation, and water quality and quantity and water flow condition or understanding of impacts on river morphology/or