Gll2288hh PPooss.. 33..22.. JJooiinntt PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
C
Coonnnneeccttiioonn
C
Crroossss tteennssiioonn rreeiinnffoorrcceem meenntt
JOINT 2
JOINT 3
JOINT 1
4 to 3 plates 25 mm S355 1 bolt 36 mm 10.9
2 plates 10 mm S355 4x7 dowels 16 mm Frame HEB140 S355
4x4 fully threaded screws 14x800 top/bottom 4x5 fully threaded screws 12x160
3 plates 10 mm S355 4x10 dowels 20 mm
connection via screwed plywood panel
Gl28h
cross section variable
Gl28h
cross section variable
Pavement/Green
EPDM waterproofing membrane monitoring layer
CLT subconstruction C24 t=15 cm Ventilation t=6cm
vapor permeable membrane Main carriers GL28h
CLT 15cm C24 LONGITUDINAL SECTION
JOINT 2
JOINT 3
JOINT 1 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
6 piles
pile head 5.0x3.0x1.5 6 piles
pile head 5.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
everywhere between pile heads 0.6x1.0
2 piles 2 piles
1 pile
2 piles
2 piles 1 pile 2 piles
1 pile
2 piles 2 piles
2 piles 1 pile
pile head 0.6x1.0 pile head 0.6x1.0
fully threaded screws
fully threaded screws Elastomer support
max. deformation 23,3 mrad
2 piles
pile head 0.6x1.0 2 piles
pile head 0.6x1.0 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
Dimension of piles and foundations according to BREED ID, Den Haag.
This plan is only valid in conjunction with the associated structural calculation and the valid technical drawings of ipv Delft and creative and Karres en Brands.
Section axis 1 S 1:100
Longitudinal section S 1:200 Position plan S 1:200
VO/DO02 Position, longitudinal section, details IB 2040
O
Osstteerrllooffff,, M Miillllss,, HHooyyeerr
Index Datum Name Änderung
VO/DO Zwolle, NL
Passerelle Station
Postbus 10007, 8000 GA Zwolle Tel.: +31 6 5007 0493
Gemeente Zwolle
7. 80
18.87 5 1.80 24.00 34.00 34.00 34.00 1.80 17.34 5
129.60
2. 55 2. 55 2. 55
Bearing situation n.S.
1.50% 1.50%
+2.79
10.00 10.00
5. 23
10.00
6. 43 3
10.00
6. 25 9
Section axis 2 S 1:100
Section axis 2 M 1:100 Section axis 3 S 1:100 Section axis 4 S 1:100 Section axis 5 S 1:100
10.00
5. 60
Standard Section S 1:50
10.00
2.20 75 1.40 90 1.40 75 2.20
9.60
22 22 22 22 22 24 20 36
1. 34
Detail CLT connection S 1:10 Detail joint axis 2,3 S 1:20 Detail connection bridge to stairs S 1:20
Detail cross beam S 1:20
1. 34
90 (75)
15 5 1. 03 15 5 1. 00
45 25 25 45
2.50
15 6
30
Foundation axis 4 S 1:50
3.00 3.50 3.00
1.69 1 4.40 3 6.80 5.12 86 1.80 1 1.00 10.91 10.55 1.54 1.66 10.03 10.03 10.03 2.25 2.44 4.00 1.041.04 8.49 8.49 1.041.04 5.38 1.041.04 10.03 10.03 11.02 1.88 1.80 89 3.62 4.00 3.84 3.61 8 1.65 6
5.00
50 2.00 2.00 50
1. 50 1. 50
50 2.00 50
3.00
Foundations S 1:50
Detail joint axis 2 S 1:20
125
126
Editor Date Size Scales
3300..0088..22002211 11117799 xx 883311 m mm m 11::220000 || 11::110000
Planinhalt: Planbezeichnung:
Projekt: Projektierung: Fachplanung Brückenbau:
Haus Sülz 7, 53797 Lohmar Tel. +49 2205 90 44 80 www.ib-miebach.de
Projektphase:
Tim van Muijden5
1 2 3 4
7800
+2.00
B.K. spoor
+2.79
B.K. PERRON
spoor 6500
spoor 6500 spoor 6500 spoor
busstation 4750 busstation 4750 6500
PVR-NL
SSiinnggllee bboolltt jjooiinntt
SSlliitttteedd ppllaattee aanndd ddoow weell C
Coonnnneeccttiioonn C Crroossss bbeeaam m
sslliitttteedd ppllaattee aanndd ddoow weell
B Buutttt JJooiinntt M
Maaiinn ttiim mbbeerr bbeeaam m
M
Maaiinn ttiim mbbeerr bbeeaam m free in all directions
I II III IV
stiff in cross section, free in longitudinal section stiff in longitudinal section, free in cross section stiff in all directions
TTyypp ooff bbeeaarriinngg
I I II I
III III IV III I I II I I I II I III III IV III
D
Deecckk ssuubbccoonnssttrruuccttiioonn
11:: 5500 || 11::2200 || 11::1100
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44..11 M Maaiinn bbeeaam m H
HEEB B 660000 SS335555
PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44..22 C Crroossss bbeeaam m H PPooss.. 33..11 C Crroossss bbeeaam m
H
HEEB B 114400 SS335555 PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 55 PPiieerrss 22xx H HEEB B 770000 SS335555
PPooss.. 66 FFoouunnddaattiioonnss
B Beeaarriinngg PPooss.. 44..11 M Maaiinn bbeeaam m H
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44 SSttaaiirrw waayy PPooss.. 44..11 M Maaiinn bbeeaam m
H
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 22xx H HEEB B 770000 SS335555
PPooss.. 55 PPiieerrss
PPooss.. 66 FFoouunnddaattiioonnss PPooss.. 33 M Maaiinn bbeeaam m
G
Gll2288hh PPooss.. 33..22.. JJooiinntt PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
C Coonnnneeccttiioonn
C
Crroossss tteennssiioonn rreeiinnffoorrcceem meenntt
JOINT 2
JOINT 3
JOINT 1
4 to 3 plates 25 mm S355 1 bolt 36 mm 10.9
2 plates 10 mm S355 4x7 dowels 16 mm Frame HEB140 S355
4x4 fully threaded screws 14x800 top/bottom 4x5 fully threaded screws 12x160
3 plates 10 mm S355 4x10 dowels 20 mm
connection via screwed plywood panel Gl28h
cross section variable
Gl28h
cross section variable
Pavement/Green
EPDM waterproofing membrane monitoring layer
CLT subconstruction C24 t=15 cm Ventilation t=6cm
vapor permeable membrane Main carriers GL28h
CLT 15cm C24 LONGITUDINAL SECTION
JOINT 2
JOINT 3
JOINT 1 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
6 piles
pile head 5.0x3.0x1.5 6 piles
pile head 5.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
everywhere between pile heads 0.6x1.0
2 piles 2 piles
1 pile
2 piles
2 piles 1 pile 2 piles
1 pile
2 piles 2 piles
2 piles 1 pile
pile head 0.6x1.0 pile head 0.6x1.0
fully threaded screws
fully threaded screws Elastomer support
max. deformation 23,3 mrad
2 piles pile head 0.6x1.0 2 piles
pile head 0.6x1.0 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
Dimension of piles and foundations according to BREED ID, Den Haag.
This plan is only valid in conjunction with the associated structural calculation and the valid technical drawings of ipv Delft and creative and Karres en Brands.
Section axis 1 S 1:100 Longitudinal section S 1:200 Position plan S 1:200
VO/DO02 Position, longitudinal section, details IB 2040
O
Osstteerrllooffff,, M Miillllss,, HHooyyeerr
Index Datum Name Änderung
VO/DO Zwolle, NL
Passerelle Station
Postbus 10007, 8000 GA Zwolle Tel.: +31 6 5007 0493 Gemeente Zwolle
7. 80
18.87
51.80 24.00 34.00 34.00 34.00 1.80 17.34
5129.60
2. 55 2. 55 2. 55
Bearing situation n.S.
1.50% 1.50%
+2.79
10.00 10.00
5. 23
10.00
6. 43
310.00
6. 25
9Section axis 2 S 1:100
Section axis 2 M 1:100 Section axis 3 S 1:100 Section axis 4 S 1:100 Section axis 5 S 1:100
10.00
5. 60
Standard Section S 1:50
10.00
2.20 75 1.40 90 1.40 75 2.20
9.60
22 22 22 22 22 24 20 36
1. 34
Detail CLT connection S 1:10 Detail joint axis 2,3 S 1:20 Detail connection bridge to stairs S 1:20
Detail cross beam S 1:20
1. 34
90 (75)
15
51. 03 15
51. 00
45 25 25 45
2.50
15 6
30
Foundation axis 4 S 1:50
3.00 3.50 3.00
1.69
14.40
36.80 5.12 86 1.80
11.00 10.91 10.55 1.54 1.66 10.03 10.03 10.03 2.25 2.44 4.00 1.041.04 8.49 8.49 1.041.04 5.38 1.041.04 10.03 10.03 11.02 1.88 1.80 89 3.62 4.00 3.84 3.61
81.65
65.00
50 2.00 2.00 50
1. 50 1. 50
50 2.00 50
3.00
Foundations S 1:50
Detail joint axis 2 S 1:20
127
Editor Date Size Scales
3300..0088..22002211 11117799 xx 883311 m mm m 11::220000 || 11::110000
Planinhalt: Planbezeichnung:
Projekt:
Projektierung:
Fachplanung Brückenbau:
Haus Sülz 7, 53797 Lohmar Tel. +49 2205 90 44 80 www.ib-miebach.de
Projektphase:
Tim van Muijden
5
1 2 3 4
7800
+2.00
B.K. spoor
+2.79
B.K. PERRON
spoor 6500
spoor 6500 spoor 6500 spoor
busstation 4750 busstation 4750 6500
PVR-NL
SSiinnggllee bboolltt jjooiinntt
SSlliitttteedd ppllaattee aanndd ddoow weell C
Coonnnneeccttiioonn C Crroossss bbeeaam m
sslliitttteedd ppllaattee aanndd ddoow weell
B Buutttt JJooiinntt M
Maaiinn ttiim mbbeerr bbeeaam m
M
Maaiinn ttiim mbbeerr bbeeaam m free in all directions
I II III IV
stiff in cross section, free in longitudinal section stiff in longitudinal section, free in cross section stiff in all directions
TTyypp ooff bbeeaarriinngg
I I II I
III III IV III I I II I I I II I III III IV III
D
Deecckk ssuubbccoonnssttrruuccttiioonn
11:: 5500 || 11::2200 || 11::1100
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44..11 M Maaiinn bbeeaam m H
HEEB B 660000 SS335555
PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 33 M Maaiinn bbeeaam m PPooss.. 33..11 C Crroossss bbeeaam m
H
HEEB B 114400 SS335555 PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 55 PPiieerrss 22xx H HEEB B 770000 SS335555
PPooss.. 66 FFoouunnddaattiioonnss
B Beeaarriinngg PPooss.. 44..11 M Maaiinn bbeeaam m H
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44 SSttaaiirrw waayy PPooss.. 44..11 M Maaiinn bbeeaam m
H
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 22xx H HEEB B 770000 SS335555
PPooss.. 55 PPiieerrss
PPooss.. 66 FFoouunnddaattiioonnss PPooss.. 33 M Maaiinn bbeeaam m
G
Gll2288hh PPooss.. 33..22.. JJooiinntt PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
C Coonnnneeccttiioonn
C
Crroossss tteennssiioonn rreeiinnffoorrcceem meenntt
JOINT 2
JOINT 3
JOINT 1
4 to 3 plates 25 mm S355 1 bolt 36 mm 10.9
2 plates 10 mm S355 4x7 dowels 16 mm Frame HEB140 S355
4x4 fully threaded screws 14x800 top/bottom 4x5 fully threaded screws 12x160
3 plates 10 mm S355 4x10 dowels 20 mm
connection via screwed plywood panel Gl28h
cross section variable
Gl28h
cross section variable
Pavement/Green
EPDM waterproofing membrane monitoring layer
CLT subconstruction C24 t=15 cm Ventilation t=6cm
vapor permeable membrane Main carriers GL28h
CLT 15cm C24 LONGITUDINAL SECTION
JOINT 2
JOINT 3
JOINT 1 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
6 piles
pile head 5.0x3.0x1.5 6 piles
pile head 5.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
everywhere between pile heads 0.6x1.0
2 piles 2 piles
1 pile
2 piles
2 piles 1 pile 2 piles
1 pile
2 piles 2 piles
2 piles 1 pile
pile head 0.6x1.0 pile head 0.6x1.0
fully threaded screws
fully threaded screws Elastomer support
max. deformation 23,3 mrad
2 piles pile head 0.6x1.0 2 piles
pile head 0.6x1.0 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
Dimension of piles and foundations according to BREED ID, Den Haag.
This plan is only valid in conjunction with the associated structural calculation and the valid technical drawings of ipv Delft and creative and Karres en Brands.
Section axis 1 S 1:100 Longitudinal section S 1:200 Position plan S 1:200
VO/DO02 Position, longitudinal section, details IB 2040
O
Osstteerrllooffff,, M Miillllss,, HHooyyeerr
Index Datum Name Änderung
VO/DO Zwolle, NL
Passerelle Station
Postbus 10007, 8000 GA Zwolle Tel.: +31 6 5007 0493 Gemeente Zwolle
7. 80
18.87
51.80 24.00 34.00 34.00 34.00 1.80 17.34
5129.60
2. 55 2. 55 2. 55
Bearing situation n.S.
1.50% 1.50%
+2.79
10.00 10.00
5. 23
10.00
6. 43
310.00
6. 25
9Section axis 2 S 1:100
Section axis 2 M 1:100 Section axis 3 S 1:100 Section axis 4 S 1:100 Section axis 5 S 1:100
10.00
5. 60
Standard Section S 1:50
10.00
2.20 75 1.40 90 1.40 75 2.20
9.60
22 22 22 22 22 24 20 36
1. 34
Detail CLT connection S 1:10 Detail joint axis 2,3 S 1:20 Detail connection bridge to stairs S 1:20
Detail cross beam S 1:20
1. 34
90 (75)
15
51. 03 15
51. 00
45 25 25 45
2.50
15 6
30
Foundation axis 4 S 1:50
3.00 3.50 3.00
1.69
14.40
36.80 5.12 86 1.80
11.00 10.91 10.55 1.54 1.66 10.03 10.03 10.03 2.25 2.44 4.00 1.041.04 8.49 8.49 1.041.04 5.38 1.041.04 10.03 10.03 11.02 1.88 1.80 89 3.62 4.00 3.84 3.61
81.65
65.00
50 2.00 2.00 50
1. 50 1. 50
50 2.00 50
3.00
Foundations S 1:50
Detail joint axis 2 S 1:20
128
Editor Date Size Scales
3300..0088..22002211 11117799 xx 883311 m mm m 11::220000 || 11::110000
Planinhalt: Planbezeichnung:
Projekt: Projektierung: Fachplanung Brückenbau:
Haus Sülz 7, 53797 Lohmar Tel. +49 2205 90 44 80 www.ib-miebach.de
Projektphase:
Tim van Muijden5
1 2 3 4
7800
+2.00
B.K. spoor
+2.79
B.K. PERRON
spoor 6500
spoor 6500 spoor 6500 spoor
busstation 4750 busstation 4750 6500
PVR-NL
SSiinnggllee bboolltt jjooiinntt
SSlliitttteedd ppllaattee aanndd ddoow weell C
Coonnnneeccttiioonn C Crroossss bbeeaam m
sslliitttteedd ppllaattee aanndd ddoow weell
B Buutttt JJooiinntt M
Maaiinn ttiim mbbeerr bbeeaam m
M
Maaiinn ttiim mbbeerr bbeeaam m free in all directions
I II III IV
stiff in cross section, free in longitudinal section stiff in longitudinal section, free in cross section stiff in all directions
TTyypp ooff bbeeaarriinngg
I I II I
III III IV III I I II I I I II I III III IV III
D
Deecckk ssuubbccoonnssttrruuccttiioonn
11:: 5500 || 11::2200 || 11::1100
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44..11 M Maaiinn bbeeaam m H
HEEB B 660000 SS335555
PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 33 M Maaiinn bbeeaam m PPooss.. 33..11 C Crroossss bbeeaam m
H
HEEB B 114400 SS335555 PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 55 PPiieerrss 22xx H HEEB B 770000 SS335555
PPooss.. 66 FFoouunnddaattiioonnss
B Beeaarriinngg PPooss.. 44..11 M Maaiinn bbeeaam m H
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44 SSttaaiirrw waayy PPooss.. 44..11 M Maaiinn bbeeaam m
H
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 22xx H HEEB B 770000 SS335555
PPooss.. 55 PPiieerrss
PPooss.. 66 FFoouunnddaattiioonnss PPooss.. 33 M Maaiinn bbeeaam m
G
Gll2288hh PPooss.. 33..22.. JJooiinntt PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
C Coonnnneeccttiioonn
C
Crroossss tteennssiioonn rreeiinnffoorrcceem meenntt
JOINT 2
JOINT 3
JOINT 1
4 to 3 plates 25 mm S355 1 bolt 36 mm 10.9
2 plates 10 mm S355 4x7 dowels 16 mm Frame HEB140 S355
4x4 fully threaded screws 14x800 top/bottom 4x5 fully threaded screws 12x160
3 plates 10 mm S355 4x10 dowels 20 mm
connection via screwed plywood panel Gl28h
cross section variable
Gl28h
cross section variable
Pavement/Green
EPDM waterproofing membrane monitoring layer
CLT subconstruction C24 t=15 cm Ventilation t=6cm
vapor permeable membrane Main carriers GL28h
CLT 15cm C24 LONGITUDINAL SECTION
JOINT 2
JOINT 3
JOINT 1 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
6 piles
pile head 5.0x3.0x1.5 6 piles
pile head 5.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
everywhere between pile heads 0.6x1.0
2 piles 2 piles
1 pile
2 piles
2 piles 1 pile 2 piles
1 pile
2 piles 2 piles
2 piles 1 pile
pile head 0.6x1.0 pile head 0.6x1.0
fully threaded screws
fully threaded screws Elastomer support
max. deformation 23,3 mrad
2 piles pile head 0.6x1.0 2 piles
pile head 0.6x1.0 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
Dimension of piles and foundations according to BREED ID, Den Haag.
This plan is only valid in conjunction with the associated structural calculation and the valid technical drawings of ipv Delft and creative and Karres en Brands.
Section axis 1 S 1:100 Longitudinal section S 1:200 Position plan S 1:200
VO/DO02 Position, longitudinal section, details IB 2040
O
Osstteerrllooffff,, M Miillllss,, HHooyyeerr
Index Datum Name Änderung
VO/DO Zwolle, NL
Passerelle Station
Postbus 10007, 8000 GA Zwolle Tel.: +31 6 5007 0493 Gemeente Zwolle
7. 80
18.87
51.80 24.00 34.00 34.00 34.00 1.80 17.34
5129.60
2. 55 2. 55 2. 55
Bearing situation n.S.
1.50% 1.50%
+2.79 +2.36
+2.86
10.00 10.00
5. 23
10.00
6. 43
310.00
6. 25
9Section axis 2 S 1:100
Section axis 2 M 1:100 Section axis 3 S 1:100 Section axis 4 S 1:100 Section axis 5 S 1:100
10.00
5. 60
Standard Section S 1:50
10.00
2.20 75 1.40 90 1.40 75 2.20
9.60
22 22 22 22 22 24 20 36
1. 34
Detail CLT connection S 1:10 Detail joint axis 2,3 S 1:20 Detail connection bridge to stairs S 1:20
Detail cross beam S 1:20
1. 34
90 (75)
15
51. 03 15
51. 00
45 25 25 45
2.50
15 6
30
Foundation axis 4 S 1:50
3.00 3.50 3.00
1.69
14.40
36.80 5.12 86 1.80
11.00 10.91 10.55 1.54 1.66 10.03 10.03 10.03 2.25 2.44 4.00 1.041.04 8.49 8.49 1.041.04 5.38 1.041.04 10.03 10.03 11.02 1.88 1.80 89 3.62 4.00 3.84 3.61
81.65
65.00
50 2.00 2.00 50
1. 50 1. 50
50 2.00 50
3.00
Foundations S 1:50
Detail joint axis 2 S 1:20
129
Editor Date Size Scales
3300..0088..22002211 11117799 xx 883311 m mm m 11::220000 || 11::110000
Planinhalt: Planbezeichnung:
Projekt:
Projektierung:
Fachplanung Brückenbau:
Haus Sülz 7, 53797 Lohmar Tel. +49 2205 90 44 80 www.ib-miebach.de
Projektphase:
Tim van Muijden
5
1 2 3 4
7800
+2.00
B.K. spoor
+2.79
B.K. PERRON
spoor 6500
spoor 6500 spoor 6500 spoor
busstation 4750 busstation 4750 6500
PVR-NL
SSiinnggllee bboolltt jjooiinntt
SSlliitttteedd ppllaattee aanndd ddoow weell C
Coonnnneeccttiioonn C Crroossss bbeeaam m
sslliitttteedd ppllaattee aanndd ddoow weell
B Buutttt JJooiinntt M
Maaiinn ttiim mbbeerr bbeeaam m
M
Maaiinn ttiim mbbeerr bbeeaam m free in all directions
I II III IV
stiff in cross section, free in longitudinal section stiff in longitudinal section, free in cross section stiff in all directions
TTyypp ooff bbeeaarriinngg
I I II I
III III IV III I I II I I I II I III III IV III
D
Deecckk ssuubbccoonnssttrruuccttiioonn
11:: 5500 || 11::2200 || 11::1100
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44..11 M Maaiinn bbeeaam m H
HEEB B 660000 SS335555
PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 33 M Maaiinn bbeeaam m PPooss.. 33..11 C Crroossss bbeeaam m
H
HEEB B 114400 SS335555 PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 55 PPiieerrss 22xx H HEEB B 770000 SS335555
PPooss.. 66 FFoouunnddaattiioonnss
B Beeaarriinngg PPooss.. 44..11 M Maaiinn bbeeaam m H
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 PPooss.. 44 SSttaaiirrw waayy
PPooss.. 44 SSttaaiirrw waayy PPooss.. 44..11 M Maaiinn bbeeaam m
H
HEEB B 660000 SS335555
PPooss.. 44..22 C Crroossss bbeeaam m H
HEEB B 440000 SS335555 22xx H HEEB B 770000 SS335555
PPooss.. 55 PPiieerrss
PPooss.. 66 FFoouunnddaattiioonnss PPooss.. 33 M Maaiinn bbeeaam m
G
Gll2288hh PPooss.. 33..22.. JJooiinntt PPooss.. 33..22.. JJooiinntt
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
PPooss.. 33..11 C Crroossss bbeeaam m H
HEEB B 114400 SS335555
C Coonnnneeccttiioonn
C
Crroossss tteennssiioonn rreeiinnffoorrcceem meenntt
JOINT 2
JOINT 3
JOINT 1
4 to 3 plates 25 mm S355 1 bolt 36 mm 10.9
2 plates 10 mm S355 4x7 dowels 16 mm Frame HEB140 S355
4x4 fully threaded screws 14x800 top/bottom 4x5 fully threaded screws 12x160
3 plates 10 mm S355 4x10 dowels 20 mm
connection via screwed plywood panel Gl28h
cross section variable
Gl28h
cross section variable
Pavement/Green
EPDM waterproofing membrane monitoring layer
CLT subconstruction C24 t=15 cm Ventilation t=6cm
vapor permeable membrane Main carriers GL28h
CLT 15cm C24 LONGITUDINAL SECTION
JOINT 2
JOINT 3
JOINT 1 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
6 piles
pile head 5.0x3.0x1.5 6 piles
pile head 5.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5 4 piles
pile head 3.0x3.0x1.5
everywhere between pile heads 0.6x1.0
2 piles 2 piles
1 pile
2 piles
2 piles 1 pile 2 piles
1 pile
2 piles 2 piles
2 piles 1 pile
pile head 0.6x1.0 pile head 0.6x1.0
fully threaded screws
fully threaded screws Elastomer support
max. deformation 23,3 mrad
2 piles pile head 0.6x1.0 2 piles
pile head 0.6x1.0 4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
4 piles
pile head 3.0x3.0x1.5
Dimension of piles and foundations according to BREED ID, Den Haag.
This plan is only valid in conjunction with the associated structural calculation and the valid technical drawings of ipv Delft and creative and Karres en Brands.
Section axis 1 S 1:100 Longitudinal section S 1:200 Position plan S 1:200
VO/DO02 Position, longitudinal section, details IB 2040
O
Osstteerrllooffff,, M Miillllss,, HHooyyeerr
Index Datum Name Änderung
VO/DO Zwolle, NL
Passerelle Station
Postbus 10007, 8000 GA Zwolle Tel.: +31 6 5007 0493 Gemeente Zwolle
7. 80
18.87
51.80 24.00 34.00 34.00 34.00 1.80 17.34
5129.60
2. 55 2. 55 2. 55
Bearing situation n.S.
1.50% 1.50%