• No results found

last acc date 1 Risk: High/low Status: 2 Risk: High/low Status: 3 Risk: High/low Status: (8)F Customer change requests Date Name &amp

N/A
N/A
Protected

Academic year: 2021

Share "last acc date 1 Risk: High/low Status: 2 Risk: High/low Status: 3 Risk: High/low Status: (8)F Customer change requests Date Name &amp"

Copied!
16
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

APPENDIX

(1)Project schedule

Item : Date :

Ver :

Step Completed date

Filled date Remark

Initial hand make sample

Initial parts list

Initial tool plan

Hand make sample

hand make sample or drawing

confirmation

Parts list

Tool plan

Customer requirement(function,

cosmetic, reliability, safety) Info for

development

QA Prelim Product Spec.

Customer confirmation

Tooling start

Tooling development

Tooling Receive

First Shot

QA testing

1st

EP First shot send to customer

Evaluation & Modify

Second shot

QA testing

2nd EP

Second shot send to customer

Evaluation & Modify

E P

3rd

EP Third shot

(2)

QA testing

Third shot send to customer

LAB Send testing sample for Lab test

Evaluation & Modify

QA FEP testing(all test) Signed samples send to customer F E P

QA Product Spec.

Packaging information confirm

1st

PKG QA testing

Evaluation & Modify

Packaging

2nd

PKG QA testing

Production sample

Approval by

customer Packaging sample

Meeting for new item

New item

Meeting Tooling release

PP Pre-Production

Injection material ready

Injection

Assembly

QA random check from production Customer QC inspection Production

Ship

(3)

(2)general eng. form)

(engineering info) issuing

department) HK /Richbo China Sender Name time Date

Receiving

department dev eng/prod eng/QA receiver Name

EN 8365 Subject:

content:

approval:

re-confirm Necessary not necessary

Approved

by Confirmed by

(4)

(3) RICHBO PLASTIC MANUFACTORY (Meeting Record)

Date:

Time:

Location:

Main speaker:

People present:

Meeting Record:

(5)

(4) Customer Specification Document Product name:

Product No:

Date:

Spec version:

Brief product description

Requirements priority list

Product requirements A Functional requirements

Name Description/Drawing/Picture

1

Risk: High/low 2

Risk: High/low 3

Risk: High/low

(6)

B Cosmetic requirements

Name Description/Drawing/Picture

1

Risk: High/low 2

Risk: High/low 3

Risk: High/low

C Manufacturing requirements

Name Description/material/quantity

1

Risk: High/low 2

Risk: High/low 3

Risk: High/low

(7)

D Quality requirements

Name Description/Drawing/picture

Confirmed by QC?

1

Risk: High/low

y/n

2

Risk: High/low

y/n

3

Risk: High/low

y/n

E Open customer issues

Name & Requirement category Description & last acc date 1

Risk: High/low

Status:

2

Risk: High/low

Status:

3

Risk: High/low Status:

(8)

F Customer change requests

Date Name & Req. cat Description Reason

Status:

Status:

Status:

(9)

(5) Richbo development specification Document Product name:

Product No:

Date:

Spec version:

A Functional requirements

Name Concept (+ drawings/pictures)

1

Risk: High/low Status:

2

Risk: High/low Status:

3

Risk: High/low Status:

B Cosmetic requirements

Name Concept (+ drawings/pictures)

1

Risk: High/low Status:

2

Risk: High/low Status:

3

Risk: High/low Status:

(10)

C Manufacturing requirements

Name Concept (+ drawings/pictures)

1

Risk: High/low Status:

2

Risk: High/low Status:

3

Risk: High/low Status:

D Quality requirements

Name Concept (+ drawings/pictures)

Checked by QC?

1

Risk: High/low

y/n

Status:

2

Risk: High/low

y/n

Status:

3

Risk: High/low

y/n

Status:

(11)

G Open development issues

Name & Requirement category Description 1

Risk: High/low

Status:

2

Risk: High/low

Status:

3

Risk: High/low Status:

H Richbo change requests (Missing requirements)

Date Name & Req. cat Description Reason

Status:

Status:

Status:

(12)

I Experienced development problems

Date Name & Req. cat Description Reason

Status:

Status:

Status:

(13)

(6)Sample Feedback Requirement

Cat No Defect Req Acc level

Suggested method for improvement

Requirement

Cat No Defect Req Acc level

Requirement

Cat No Defect Req Acc level

ETC…………..

(14)

(7) Longshore Part Specification Part name:

Part supplier:

Part No:

Date:

Spec version:

List of agreements

Deliverables Expected Date

1 2 3 4 5

Consequences for not delivering on time 1

2 3 4 5

Part requirements Brief part description

A Functional requirements

Name Description/Drawing/Picture

1

2

3

(15)

B Cosmetic requirements

Name Description/Drawing/Picture

1

2

3

C Manufacturing requirements

Name Description/material/quantity

1

2

3

(16)

D Quality requirements (regulations and standards)

Name Description

Confirmed by QC?

1

2

3

Supplementary remarks

Referenties

GERELATEERDE DOCUMENTEN

In de praktische weidebouw werden deze verschillen in stikstofbenutting tussen rassen van Engels raaigras in Nederland ook waargenomen; deze hingen in hoge mate samen met de droge

In other words, the investor will demand a higher return in a downturn compared the return asked by the investors when the market is in an upturn than rational investors, holding

It appears from this table that the regular asynchronous coaching in situations 6,9 and 10 has a more positive effect than the synchronous variant on the quality of the

1) To combine molecular techniques with field trials to study the self-pollinating nature of soybean and determine the extent of maize pollen movement and

Dit geldt niet alleen voor een Segway met een vrije snelheidskeuze, maar ook als een maximumsnelheid van 6 km/uur bewerkstelligd zou kunnen worden.. Toelating van de Segway

Governments and organizations to: acknowledge de- creased male fertility as a major public health problem and to recognize the importance of male reproductive health for the survival

In the jointly determined CEO stock and stock option compensation package, I find that a higher sensitivity of CEO wealth to stock price (delta) will decrease corporate