Documentation of the CWE FB MC solution as basis for the formal

approval-request

(Brussels, 9th May 2014)

(2)

LTA inclusion check and domain adjustment

The “LTA coverage” method consists in enlarging the FB domain so as to cover long term allocated capacities when they are not fully encompassed by the former. This coverage is performed automatically as a final step of the capacity calculation process (just before adjustment to LT nominations), in case some parts of the FB domain are exceeded by LT allocated capacities (which means that the realization of some long term rights would result in overloads on some flow based critical branches, that is a so called “LTA check failure”). This step results in the creation of “virtual flow based parameters”, in the sense that they are not directly related to a physical element of the grid, as illustrated in the sketch below:

In theory, such artifacts are not to be used: indeed the FB domain gives the reference in terms of security of supply, and CWE TSOs have at hand a wide variety of remedial actions, that can be considered at capacity calculation stage (that is, embedded in the critical branches definition) in order to enlarge the dimensions of the domain.

In practice, however, resorting to the “LTA coverage algorithm” can be necessary in case the FB model does not allow TSOs to reproduce exactly some complex operating conditions. This is typically the case when TSOs are considering so called complex remedial actions (as a matter of fact, a combination of remedial actions which are applied to cover very specific situations of the grid, and that cannot be modeled within the linear FB model) when they define cross-border capacities. Long term rights are safe and firm at the moment of capacity calculation, and therefore need to be covered by the day-ahead capacity domain: which is why CWE TSOs have designed and implemented an algorithm that ensures the coverage of the previously exceeding “LTA corner”, but in the same time minimizing the distortion of the initial FB domain. So, LTAs do not overcommit the grid. This algorithm has been implemented in the new version of the FB system used by TSOs since February 12th. Its usage is the object of careful analysis and will be monitored by CWE regulators.

LTA domain, safe, computed a month ahead, implicitely taking into account some complex remedial actions

FB domain computed in DA by CWE TSOs. Some complex variants, implicetly taken into accounts when defining LT capacities, cannot be explicitely integrated in the critical branches because of the linearity of the model. The « red CB » seems overloaded by the LTA corner in the right upper part, but not all the possible remedial actions have been considered yet.

The final FB domain, just before adjustment to LT nominations, covering LTA and remaining safe. No precongestions are possible.

Creation of « virtual FB parameters », not corresponding to physical elements of the grid, but designed so as to cover as closely as possible the LT capacities. These new parameters implicitely take into accounts the complex remedial actions that could not be modelled directly in the « red CB » Potential zone of

Referenties

GERELATEERDE DOCUMENTEN

Are there improvements in other areas than transparency you would like to suggest the project partners to implement for a future Flowbased 2.0?. 1 When writing FB(I), we refer to

CWE partners are now starting the daily publication (with a retroactive effect as of February 25th) of the shadow auctions ATCs which will be calculated and used for eventual

The Market Coupling algorithm (described later on in the document) will optimize the day-ahead market welfare for the whole region, based on the capacity constraints (Flow

If RTE accepts the proposed reduction of the French import by Swissgrid (partial or full acceptance), RTE translates this value in an External Constraint and submits it to the CWE

In which way and according to which procedure are indictments framed in Belgium, France, Italy, and Germany, to what extent are judges in those countries bound by the indictment

The individual TSOs are responsible to calculate on a daily basis the day-ahead Cross-Zonal Capacities (CZCs) for the operation of Mar- ket Coupling. In the context of FB MC, CZCs

Let us first emphase that the new extended formulation methodology presented on an example in Section 2.3 is much more scalable than the approach based on virtual branches: in

CWE NRAs acknowledge the introduction of the DE/LU-AT-border in CWE FB MC. CWE NRAs expect that the introduction of the DE/LU-AT border in CWE FB MC will increase the