WG 2

protocol

WG 2: protocol

TC BIM&ICT + Cluster BIM 19/01/2017

(2)

WG 2

protocol

Werking

TC CB

• Vandaag

+

CB CB CB TC

• Nadien

(3)

WG 2

protocol

Werking

TC CB

ENTREPRENEURS / AANNEMERS

27%

ASSOCIATIONS PROFESSIONELLES/B EROEPSVERENIGING

EN 8%

ARCHITECTES / ARCHITECTEN

11%

BUREAUX D'ETUDE/CONTROLE

/ STUDIE- en CONTROLEBUREAUS

19%

CONSULTANT 8%

MAITRES D'OUVRAGES /

BOUWHEREN 5%

SOFTWARE 11%

UNIVERSITES / UNIVERSITEITEN

3%

FACILITY MANAGERS 3%

FABRICANTS / FABRIKANTEN

5%

aannemer 50%

architect 5%

beroepsorganisatie 5%

consultant 10%

fabrikant 5%

studiebureau 20%

(4)

WG 2

protocol

Werking

TC CB

• Animatoren:

Charlotte Euben (WTCB) & Tim Lemoine (WTCB)

• Vertegenwoordiger:

Robin Collard (BAM Contractors)

&

(5)

WG 2

protocol

Agenda

• Werking TC BIM&ICT en Cluster BIM

• Stand van zaken WG 2 TC BIM&ICT

• Roadmap + taakverdeling

• Voorstel protocol

• Voorstel termen & definities

• Voorstel matrix WG 5

• Praktisch

&

(6)

WG 2

protocol

Stand van zaken

• DOEL

BIM protocol

Belgische gids

Projectniveau

Type contract?

(7)

WG 2

protocol

Stand van zaken

• DOEL

• Uitwerking

BIM protocol

Belgische gids Projectniveau Type contract?

Oplijsten ambities

Kijken naar bestaande documenten

The guide to Building Information Modelling van ADEB-VBA

ISO 19650-1 & ISO 19650-2 Eerste voorstel

(8)

WG 2

protocol

Stand van zaken

• DOEL

• Uitwerking

BIM protocol

Belgische gids Projectniveau Type contract?

Oplijsten ambities

Kijken naar bestaande documenten

The guide to Building Information Modelling van ADEB-VBA

ISO 19650-1 & ISO 19650-2 Eerste voorstel

Onderverdeling:

areas

assets 1. oplijsten 1. oplijsten

Termen en definities

Facility management?

2. Wat in model

2. Wat in model

Sub-werkgroep

(9)

WG 2

protocol

Roadmap

Deel 1: BIM algemeen Ambities BIM

Termen & definities

Deel 2: protocol Bestaand Inhoudstafel

Onderdelen verder uitwerken

Werkdocument binnen alle WG Publicatie voor Batibouw (16/02/2017)

Informatie verzamelen

Verantwoordelijkheden WG 5

Publicatie voor Batibouw (16/02/2017)

Juni 2016

Sep 2016

Okt 2016

Nov 2016

Dec 2016

Jan 2017

Feb 2017

Maa 2017

Apr 2017

Mei 2017

Juni 2017

Sep 2017

Okt 2017

Nov 2017

Dec 2017

?

(10)

WG 2

protocol

Voorstel protocol (inhoud)

BIM protocol 

BIM Implementatieplan

• bedrijfsniveau

BIM Strategie, bevraging & ILS

BIM Protocol & Uitvoeringsplan

• Projectniveau

• projectteam

• Projectniveau

• opdrachtgever

(11)

WG 2

protocol

WAAROM = BIM Strategie

o Projectdoelstellingen

o Informatie Leverings Vereisten

o Algemene Project Planning & Organisatie

o Eventueel vereisten voor Gemeenschappelijke Data Omgeving

o Aansprakelijkheden & Juridische Aspecten

WAT = BIM Protocol

o Proces (projectinfo, team, rollen, deliverables,...)

o Workflow (organisatie, samenwerking, kwaliteit en risico’s)

o Informatie en modelinhoud

o Technologie en IT

HOE = BIM Uitvoeringsplan

= invulling & aanvulling op protocol met praktische afspraken tussen project-partners

Voorstel protocol (inhoud)

opdrachtgever

Opdrachtgever - opdrachtnemer

Tussen projectpartners

(12)

WG 2

protocol

Wat? Gebruik?

template/checklist

e-document/evoluerend

referentie voor projecten (aanbeveling; hulp voor starters)

Termen & Definities & Acroniemen (voorlopig via BIMportal, maar zou als appendix opgenomen worden in een protocol)

Protocol = WAT (aanvulling op contract; van team naar opdrachtgever). Het protocol is een antwoord van het projectteam op de strategie van de opdrachtgever.

Engagement - wens & bereidheid tot samenwerking - intekenen op visie BIM

Contractueel Document (te ondertekenen door partijen die reeds gekend zijn) - stabiel tijdens project (te herzien als projectteam samenstelling wijzigt vb. aanstelling

aannemer bij klassieke aanbesteding)

Voorstel protocol (inhoud)

inleiding

(13)

WG 2

protocol

Voorstel protocol (vragen leden)

BIM protocol

• Contractvorm

• Vorm van publicatie

• Hiaten?

• Onderdelen verplicht of optioneel?

?

(14)

WG 2

protocol

Voorstel protocol (vragen leden)

• Contractvorm

• Vorm van publicatie

• Hiaten?

• Onderdelen verplicht of optioneel?

• Contractvorm

• Vorm van publicatie

!! • Hiaten? • Onderdelen verplicht of optioneel?

Eindgebruiker?

• bronvermelding

…?

CAD-to-CAM

Visualisatie en virtuel reality Ontwerp?

Nu versus later …

DIGITAAL: eventueel toolkit toegespitst op bouwberoepen en type contract?

BIMportal

(15)

WG 2

protocol

Voorstel protocol (bronvermelding)

Construction Industry Council. (2013). BUILDING INFORMATION MODEL (BIM) PROTOCOL.

Standard Protocol for use in projects using Building Information Models. (Beal and Company, Ed.) (1st ed.). London (UK): Construction Industry Council. (http://cic.org.uk/download.php?f=the-bim-

protocol.pdf)

Computer Integrated Construction Research Program. (2011). BIM Project Execution Planning Guide – Version 2.1. The Pennsylvania State University, University Park, PA, USA. (http://bim.psu.edu)

Denis, F. (2015). Building Information Modelling – Belgian Guide for the construction Industry (1st ed.).

Brussels (Belgium): ADEB-VBA.

BIM Task Group. (2013). PAS 1192-2:2013 - Specification for information management for the

capital/delivery phase of construction projects using building information modelling (Corr. 1). London (UK): BSI Standards Limited.

Richards, M., Churcher, D., Shillcock, P., & Throssel, D. (2013). Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP).

Richards, M., Churcher, D., Shillcock, P., & Throssel, D. (2013). Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP).

(16)

WG 2

protocol

Voorstel protocol (bronvermelding)

+ enkele vertrouwelijke documenten

Volgende documenten worden nog verder bekeken:

BIR BIM Uitvoeringsplan RVB BIM Norm

BIR ILS http://www.bimloket.nl/BIMbasisILS

(17)

WG 2

protocol

jan 2017

feb 2017

maart 2017

april 2017

mei 2017

juni 2017

juli 2017

aug 2017

sep 2017

okt 2017

nov 2017

dec 2017

jan 2018

feb 2018

maa 2018

Voorstel protocol (planning)

Zie excel

(18)

WG 2

protocol

Voorstel termen & definities

Voorstel o.a. op basis van

• ISO DIS 19650 (wordt nog herwerkt)

• document Ann Van den Borre

Termen en definities

TO DO:

• vergelijken + bronvermelding andere normen

• Doortrekken andere werkgroepen (vb BIM rollen)

vgl

(19)

WG 2

protocol

Voorstel matrix WG 5

NL FR

(20)

WG 2

protocol

Praktisch

• Volgende stappen:

• Inhoudstafel protocol publiceren

• Termen & definities publiceren

• Uitwerken eerste onderdeel

(21)

WG 2

protocol

Praktisch

• Volgende vergaderingen:

• Donderdag 23 februari: NM

• Donderdag 23 maart

• Maandag 27 maart: TC BIM&ICT

• Donderdag 20 april

• Woensdag 17 mei

(22)

WG 2

protocol

Praktisch

Contactgegevens

• Algemeen: cluster@bimportal.be

• Animatoren: charlotte.euben@bbri.be & tim.lemoine@bbri.be

• Algemeen: ctc-bimict@bimportal.be

• WG 2: wgt2@bimportal.be

• Animatoren: charlotte.euben@bbri.be & tim.lemoine@bbri.be

Referenties

GERELATEERDE DOCUMENTEN

During the last 3 years we investigated in 20 patients with hematological malignancies and solid tumors the use of non-myeloablative conditioning followed by T cell depleted allo-SCT

BIM-uitvoeringsplan: levend document dat regelmatig geëvalueerd en aangepast kan worden.... Rol van

Als de huisgenoot positief getest is en strikte zelfisolatie is mogelijk, dan kunnen de huisgenoten als zij zelf geen klachten hebben ontwikkeld zich vanaf de 5 e dag na het

Tijdens een koffie-met-gebak-bijeenkomst op 13 de- cember 2017 werd Minnie Middelberg in de bloemen gezet voor haar jarenlange inzet bij het verzamelen en editen van de kopij van

This leads to a proposed reference architecture and data platform to help overcome these barriers of Building Information Modeling (BIM) adoption by the Architecture, Engineering,

• Meerwaarde creëren voor eigenaar en gebruiker Waarom deze samenwerking.. • Elkaar in de kracht zetten en profiteren van

Als de huisgenoot positief getest is en strikte zelfisolatie is mogelijk, dan kunnen de huisgenoten als zij zelf geen klachten hebben ontwikkeld zich vanaf de 5 e dag na het

• Voor pedagogisch medewerkers die terugkeren uit een land of gebied in het buitenland kan aan de hand van de quarantaine reischeck bekeken worden of quarantaine geadviseerd wordt