The consultation of the BritNed access rules was held by BritNed Interconnectors Limited (hereinafter referred to as ‘BritNed’) from 2
Hele tekst
GERELATEERDE DOCUMENTEN
5.4 BritNed will notify each Unit Holder of its Intraday ICE in respect of Intraday Units with a Unit Validity Time of 00:00 to 15:59 hrs of the Contract Day D in each
“Rights Document” means a document issued by the Allocation Platform to a Registered Participant under the Harmonised Allocation Rules in respect of Long
Apart from these conforming changes, the predominant changes in the new version of the BritNed Access Rules are in relation to the removal of all the provisions which are specific
Chapter 3 Section 5 Calls on Collaterals Clarification that collateral provided under HARs for BritNed can be drawn upon in event of failure to pay under either
“Unit Holder” means a Participant who has been allocated Units under these Rules, any of which at the relevant time have not yet reached the end of their Product Period and, for
D8.6 If there is a Capacity Shortage in any Settlement Period, the capacity rights of all Participants and if necessary their (Mid North Sea) Nominations, in that Settlement
On the basis of the information made available to the Board by the Minister and BritNed, with a view to the management and allocation of capacity on the BritNed interconnector,
BDL proposes to continue to allocate long-term capacity on BritNed in the form of physical transmission rights (“PTR”) via explicit auctions on the