• No results found

Formulier Aanvraag CAR-573 Maintenance Organisation Approval

N/A
N/A
Protected

Academic year: 2022

Share "Formulier Aanvraag CAR-573 Maintenance Organisation Approval"

Copied!
2
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Note: This application form is to be addressed to the CAA-NL

(ILTdocumentmanagement@ilent.nl) together with documents supporting the application, and in particular the TCCA Supplement to the AMO Maintenance Policy Manual.

Transport Canada Form 24-0093

European Maintenance Organisation (MO) application for initial/continuation/change of a Maintenance Approval in accordance with the Bilateral Agreement between the European Union and Canada on Civil Aviation Safety.

Page 1/2

For the Applicant:

1.EASA Part 145 MO name:

2.Address of MO:

3.Mailing Address (if different from 2 above):

4.Tel: Fax: Main Contact E-Mail:

5.Please select the type of application and complete the section 6 of the Form

a.Initial b. Continuation c. Change

(in case of continuation and or change) TCCA CAR 573 AMO number:

6. Application:

I wish to apply on behalf of this MO for an approval to perform maintenance on Canadian products in accordance with the Agreement concluded between the European Union and Canada on Civil Aviation Safety.

I understand that a maintenance approval granted under the terms and conditions of the

bilateral agreement between the European Union and Canada is subject to the charges described in the CAR 104 and that failure to submit the applicable charge may result in the suspension or

cancellation of an existing maintenance approval.

I additionally understand that no technical investigation in relation with an initial application to a maintenance approval will be carried out until payment of applicable charge has been submitted.

Date:

Name & Signature of the MO Accountable Executive:

CAA-NL Action:

Please forward this application together with the TCCA supplement approval letter to:

Transport Canada Civil Aviation Operational Airworthiness (AARTM) e-mail: TCCA-EASA@tc.gc.ca

Rev2.1/CAA-NL

Signature: ...

. Aircraft Rated:

EASA Part 145 certificate number:

Component Rated:

Note: In the context of this agreement, when the component rated AMO's Certificate includes an aircraft rating, they must apply as an aircraft rated AMO

(2)

Transport Canada Civil Aviation Form 24-0093

European MO application for initial/continuation/change of a Maintenance Approval in accordance with the Bilateral Agreement between the European Community and Canada on Civil Aviation Safety.

Page 2/2

For TCCA:

7. Initial Application

TCCA hereby confirms that the applicant: EASA Part 145 # ………., has paid the fees in relation with the above described application, and therefore TCCA authorises the granting by the CAA-NL of the TCCA CAR 573 approval:

……….

to perform maintenance on Canadian products once it has been satisfied compliance of the AMO to applicable regulatory requirements.

Name: ………...

Date: ………...

Please forward this acknowledgement to: Civil Aviation Authority CAA-NL

attn: Aviation Approvals

E-mail: ILTdocumentmanagement@ilent.nl 8.

To be filled by TCCA in case of non-compliance

TCCA hereby informs the CAA-NL that the applicant has failed to demonstrate compliance with the fees and charges and that the application/continuation of the TCCA approval is

rendered invalid.

(This information is to be forwarded to the CAA-NL at the above mentioned address) Name: ………

Date: ……….

Note on fees and charges

1. For information regarding the current fees and charges please refer to the TCCA fees and charges regulation which can be found on the TCCA website: www.tc.gc.ca;

2. Upon receipt of an application Form 24-0093 for initial approval, TCCA will address to the applicant an invoice containing details related to payment methods;

3. For continuation of TCCA approval, TCCA will invoice the applicant every two years;

Rev2.1/CAA-NL

Referenties

GERELATEERDE DOCUMENTEN

This is similar to the explanation of Geraerds (1992); the total of activities serving the purpose of retaining the production units in or restoring them to the

The decision elements: maintenance facilities, maintenance technology, maintenance policies, maintenance planning and control system, human resources and maintenance

subsidence rates, thereby also reducing future damage to the World Heritage Site, such as decay of archaeological deposits and subsidence damage with secondary damage to

The (used) simulation output is a dataset with 2.6 million time steps and 9 features. These are: time stamp, engine load, fuel rate, engine speed, wind speed, generator load,

maintenance department since the production team is involved as well. As mentioned in the total productive maintenance roles, the production team at company X is responsible for

This paper is a revised version of the one written in the framework of the European Union research network project - ‘Forum for European research in

The most important factors that impact on the competitiveness of the South African deciduous fruit industry are availability of skilled labour; cost and quality of

The vision of each staff member within Yeast is obtained by a staff questionnaire (annex 9) which is set up during the internship. The results give an idea of the current