• No results found

Table 5.1: Descriptive Statistics

N/A
N/A
Protected

Academic year: 2021

Share "Table 5.1: Descriptive Statistics"

Copied!
9
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Table 5.1: Descriptive Statistics

N Minimum Maximum Mean

Std.

Deviation Skewness Kurtosis

Statistic Statistic Statistic Statistic Statistic Statistic

(2)

Table 5.2

Model Summary (b)

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,531(a) ,282 ,278 ,2335041

a Predictors: (Constant), Percentage of foreigners in TMT b Dependent Variable: Percentage of foreign sales

Coefficients (a)

Unstandardized Coefficients

Standardized

Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

(Constant) ,456 ,026 17,540 ,000

1

Percentage of

foreigners in TMT ,521 ,062 ,531 8,346 ,000 1,000 1,000

a Dependent Variable: Percentage of foreign sales

Table 5.3

Model Summary

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,299(a) ,090 ,079 ,2637486 2 ,551(b) ,304 ,292 ,2312474

a Predictors: (Constant), Total employee, total size of the complete board

b Predictors: (Constant), Total employee, total size of the complete board, Percentage of foreigners in TMT

Coefficients (a)

Unstandardized Coefficients

Standardized Coefficients

Model B Std. Error Beta t Sig.

(Constant) ,184 ,106 1,738 ,084

total size of the

complete board ,005 ,008 ,047 ,626 ,532

1

Total employee ,040 ,011 ,282 3,739 ,000

(Constant) ,247 ,093 2,645 ,009

total size of the

complete board ,003 ,007 ,025 ,384 ,701 Total employee ,021 ,010 ,145 2,112 ,036 2 Percentage of foreigners in TMT ,476 ,065 ,485 7,345 ,000

(3)

Table 5.4:

Model Summary (b)

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,532(a) ,284 ,279 ,2436399

a Predictors: (Constant), Percentage of foreigners in TMT b Dependent Variable: Percentage of foreign employee

Coefficients (a)

Unstandardized Coefficients

Standardized

Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

(Constant) ,416 ,027 15,333 ,000

1

Percentage of

foreigners in TMT ,545 ,065 ,532 8,369 ,000 1,000 1,000

a Dependent Variable: Percentage of foreign employee

Table 5.5

Model Summary

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,459(a) ,210 ,201 ,2564885 2 ,618(b) ,382 ,372 ,2275220

a Predictors: (Constant), Total employee, total size of the complete board

b Predictors: (Constant), Total employee, total size of the complete board, Percentage of foreigners in TMT

Coefficients (a)

Unstandardized Coefficients

Standardized Coefficients

Model B Std. Error Beta t Sig.

(Constant) -,108 ,103 -1,049 ,296

total size of the

complete board ,008 ,007 ,080 1,139 ,256

1

Total employee ,064 ,010 ,428 6,103 ,000

(Constant) -,049 ,092 -,539 ,590

total size of the

(4)

Table 5.6:

Model Summary (b)

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,228(a) ,052 ,047 50,092

a Predictors: (Constant), Percentage of foreigners in TMT b Dependent Variable: Number of countries active

Coefficients (a)

Unstandardized Coefficients

Standardized

Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

(Constant) 44,014 5,575 7,895 ,000

1

Percentage of

foreigners in TMT 41,783 13,388 ,228 3,121 ,002 1,000 1,000

a Dependent Variable: Number of countries active

Table 5.7:

Model Summary

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,353(a) ,124 ,114 48,282 2 ,376(b) ,141 ,126 47,956

a Predictors: (Constant), Total employee, total size of the complete board

b Predictors: (Constant), Total employee, total size of the complete board, Percentage of foreigners in TMT

Coefficients (a)

Unstandardized Coefficients

Standardized Coefficients

Model B Std. Error Beta t Sig.

(Constant) -38,254 19,374 -1,975 ,050

total size of the

complete board ,666 1,381 ,036 ,483 ,630

1

Total employee 9,097 1,976 ,340 4,604 ,000

(Constant) -34,997 19,325 -1,811 ,072

total size of the

complete board ,553 1,373 ,030 ,403 ,688 Total employee 8,077 2,039 ,302 3,961 ,000 2 Percentage of foreigners in TMT 24,749 13,430 ,135 1,843 ,067

(5)

Table 5.8:

Model Summary (b)

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,486(a) ,236 ,232 38,261

a Predictors: (Constant), Percentage of foreigners in TMT b Dependent Variable: Number of foreign subsidiaries

Coefficients (a)

Unstandardized Coefficients

Standardized

Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

(Constant) 30,160 4,258 7,083 ,000

1

Percentage of

foreigners in TMT 75,602 10,226 ,486 7,393 ,000 1,000 1,000

a Dependent Variable: Number of foreign subsidiaries

Table 5.9

Model Summary

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,443(a) ,196 ,187 39,355 2 ,577(b) ,333 ,322 35,939

a Predictors: (Constant), Total employee, total size of the complete board

b Predictors: (Constant), Total employee, total size of the complete board, Percentage of foreigners in TMT

Coefficients (a)

Unstandardized Coefficients

Standardized Coefficients

Model B Std. Error Beta t Sig.

(Constant) -48,026 15,792 -3,041 ,003

total size of the

complete board 1,311 1,125 ,083 1,165 ,246

1

Total employee 9,348 1,610 ,411 5,805 ,000

(Constant) -40,074 14,482 -2,767 ,006

total size of the

complete board 1,035 1,029 ,065 1,006 ,316 Total employee 6,859 1,528 ,302 4,489 ,000 2 Percentage of foreigners in TMT 60,422 10,064 ,388 6,003 ,000

(6)

Table 5.10:

Model Summary (b)

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,762(a) ,581 ,578 ,1784999

a Predictors: (Constant), Percentage of foreign experiences in TMT b Dependent Variable: Percentage of foreign sales

Coefficients (a)

Unstandardized Coefficients

Standardized

Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

(Constant) ,192 ,030 6,372 ,000

1

Percentage of foreign

experiences in TMT ,632 ,040 ,762 15,655 ,000 1,000 1,000

a Dependent Variable: Percentage of foreign sales

Table 5.11

Model Summary

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,299(a) ,090 ,079 ,2637486 2 ,763(b) ,583 ,575 ,1791187

a Predictors: (Constant), Total employee, total size of the complete board

b Predictors: (Constant), Total employee, total size of the complete board, Percentage of foreign experiences in TMT

Coefficients (a)

Unstandardized Coefficients

Standardized Coefficients

Model B Std. Error Beta t Sig.

(Constant) ,184 ,106 1,738 ,084

total size of the

complete board ,005 ,008 ,047 ,626 ,532

1

Total employee ,040 ,011 ,282 3,739 ,000

(Constant) ,152 ,072 2,114 ,036

total size of the

complete board ,004 ,005 ,036 ,703 ,483 Total employee ,002 ,008 ,017 ,318 ,751 2 Percentage of foreign experiences in TMT ,624 ,043 ,752 14,374 ,000

(7)

Table 5.12:

Model Summary (b)

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,707(a) ,499 ,497 ,2036668

a Predictors: (Constant), Percentage of foreign experiences in TMT b Dependent Variable: Percentage of foreign employee

Coefficients

(a)

Unstandardized Coefficients

Standardized

Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

(Constant) ,173 ,034 5,027 ,000

1

Percentage of foreign

experiences in TMT ,612 ,046 ,707 13,287 ,000 1,000 1,000

a Dependent Variable: Percentage of foreign employee

Table5.13 Model

Summary

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,459(a) ,210 ,201 ,2564885 2 ,742(b) ,550 ,542 ,1942042

a Predictors: (Constant), Total employee, total size of the complete board

b Predictors: (Constant), Total employee, total size of the complete board, Percentage of foreign experiences in TMT

Coefficients (a)

Unstandardized Coefficients

Standardized Coefficients

Model B Std. Error Beta t Sig.

(Constant) -,108 ,103 -1,049 ,296

total size of the

complete board ,008 ,007 ,080 1,139 ,256

1

Total employee ,064 ,010 ,428 6,103 ,000

(Constant) -,136 ,078 -1,739 ,084

total size of the

complete board ,007 ,006 ,071 1,330 ,185 Total employee ,031 ,008 ,209 3,698 ,000 2 Percentage of foreign experiences in TMT ,540 ,047 ,624 11,489 ,000

(8)

Table 5.14:

Model Summary (b)

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,460(a) ,212 ,207 45,680

a Predictors: (Constant), Percentage of foreign experiences in TMT b Dependent Variable: Number of countries active

Coefficients (a)

Unstandardized Coefficients

Standardized

Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

(Constant) 9,097 7,728 1,177 ,241

1

Percentage of foreign

experiences in TMT 71,276 10,336 ,460 6,896 ,000 1,000 1,000

a Dependent Variable: Number of countries active

Table 5.15

Model Summary

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,353(a) ,124 ,114 48,282 2 ,503(b) ,253 ,240 44,733

a Predictors: (Constant), Total employee, total size of the complete board

b Predictors: (Constant), Total employee, total size of the complete board, Percentage of foreign experiences in TMT

Coefficients (a)

Unstandardized Coefficients

Standardized Coefficients

Model B Std. Error Beta t Sig.

(Constant) -38,254 19,374 -1,975 ,050

total size of the

complete board ,666 1,381 ,036 ,483 ,630

1

Total employee 9,097 1,976 ,340 4,604 ,000

(Constant) -41,290 17,959 -2,299 ,023

total size of the

complete board ,560 1,279 ,030 ,438 ,662 Total employee 5,490 1,945 ,205 2,822 ,005 2 Percentage of foreign experiences in TMT 59,375 10,835 ,383 5,480 ,000

(9)

Table 5.16

Model Summary (b)

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,602(a) ,363 ,359 34,945

a Predictors: (Constant), Percentage of foreign experiences in TMT b Dependent Variable: Number of foreign subsidiaries

Coefficients (a)

Unstandardized Coefficients

Standardized

Coefficients Collinearity Statistics

Model B Std. Error Beta t Sig. Tolerance VIF

(Constant) ,263 5,912 ,044 ,965

1

Percentage of foreign

experiences in TMT 79,349 7,907 ,602 10,035 ,000 1,000 1,000

a Dependent Variable: Number of foreign subsidiaries

Table 5.17

Model Summary

Model R R Square Adjusted R Square Std. Error of the Estimate 1 ,443(a) ,196 ,187 39,355 2 ,651(b) ,424 ,414 33,415

a Predictors: (Constant), Total employee, total size of the complete board

b Predictors: (Constant), Total employee, total size of the complete board, Percentage of foreign experiences in TMT

Coefficients (a)

Unstandardized Coefficients

Standardized Coefficients

Model B Std. Error Beta t Sig.

(Constant) -48,026 15,792 -3,041 ,003

total size of the

complete board 1,311 1,125 ,083 1,165 ,246

1

Total employee 9,348 1,610 ,411 5,805 ,000

(Constant) -51,466 13,415 -3,836 ,000

total size of the

complete board 1,191 ,956 ,075 1,246 ,214 Total employee 5,260 1,453 ,231 3,620 ,000 2 Percentage of foreign experiences in TMT 67,293 8,093 ,511 8,315 ,000

Referenties

GERELATEERDE DOCUMENTEN

The statistics package can compute and typeset statistics like frequency tables, cumulative distribution functions (increasing or decreasing, in frequency or absolute count

Stel bij deze situatie de recursieve formule op van de hoeveelheid water (W n ) en onderzoek beneden welke grenswaarde de hoeveelheid water in de tank niet komt. W n = 0,7W n-1

License: Licence agreement concerning inclusion of doctoral thesis in the Institutional Repository of the University of Leiden Downloaded.

In the Old Sumerian texts from Lagash, the dative case marker is written la after the proper noun d en-líl. This is probably only a conventional spelling reflecting an older

Afhankelijk van het soort werkwoordsvorm in het Soemerisch (perfectief of imperfectief, transitief of intransitief) drukken de achterste persoonsprefixen ofwel het

Activities span in several directions: some are specifically targeted at the local population (most events organised by MKCF), some aim to make Fulnek more

Multiple regression analysis with dummy variable (banks from developing countries). Dependent Variable: NIM Method:

Business Processes Organizational Structure Systems 17b) Was this mainly cost reduction, risk reduction or revenue creation? 18) In what area did the least value creation