MOTION ON THE WATER

Hele tekst

(1)

CULTURAL LOOP

WHY?

HOW?

WHAT?

- empty harbor

- poorly designed waterfront - lack of good public space

- lacking connection with other cultural venues

- by connecting two waterfronts

- by creating harmony in urban setting - by improving public space

- by adding extra layer of public activities - by brinign cultural events on water

- cultural hub with various events and activities - qualitative indoor and outdoor public space - adjustable space according to event and/or weather conditions

Dead end circulation

Maashaven is natural divider between Ka- tendrecht and Tarvewijk, creating circual- tion isues.

One circulation loop

A new bridge will tie together the cultural area by connecting landscape and cultural venues in a natural continuous loop.

URBAN LEVEL

MOTION ON THE WATER

DESIGN CONCEPT FOR ART PERFORMING CENTER

Inhabitable landscape as the epicenter of culture

Art filled urban space Public passage through the building

Connecting loop Panoramic roof terrace

Building/

cultural hub Link Sculptural structures

+

+ =

Cultural link

Conny Janssen Danst

Maassilo Lantaren

Venster

New Luxor

Floating pavilion

Loop of cultural venues

Sanita Krone

Master of Architecture FHK MA+U Tilburg sanitakrone@gmail.com

(2)

Maashaven

Maashaven The Netherlands Randstad

Rotterdam

tek.nr

VO -209

Amusement park

SS Rotterdam

Conny Janssen Danst

Maassilo

TARWEWIJK KATENDRECHT

Maashaven

Maashaven Zuidzijde

Maashavenkade

Inhabitnats 12,600 Inhabitnats 5,595

Type: public building

Client: Rotterdam municipality, funding Size: Indoor 5829 m2, outdoor 19516 m2 Location: Maashaven

Status: concept

Motion on the water creates a frame for contempo- rary art, films, festival performances, leisure, and wa- ter activities. Architectural intervention is filled with art and public space by the waterfront around Maas- haven. Is located on Maashaven between Katendrech and Tarwevijk. It connects South and North. It brings together citizens, tourists, organizations - contempo- rary arts, cultural schools- into a closed loop that is

the epicenter of Rotterdam South.

“Motion on the water” is designed as a single loop of vast public space that includes a promenade with a panoramic view. Promenade pas by a dance rehears- al studio, via series of steps and ramps, reaches roof terraces and provides spectacular views. Performace center is a transparent building with tinted glass walls,

which gives a possibility to everyone to see what is happening inside. Outdoor spaces are used as stag- es for concerts, performances, festivals, and art in- stallations. Upon stepping on “Motion on the water”

viewing platform unveils the view towards the entire circular intervention. Magnificent.

Upon arrival at Art Performace center, visitors en-

ter the lobby where they can enjoy a significant view towards the harbor and can have fine dining. On the same floor is district size performing space with a maximum of 400 flexible seating configurations.

Center provides rehearsal studios for artists, storage spaces, 3 generous roof terraces which can be ad- justed for various events and performances.

LONG SECTION 1:2000

CULTURAL LINK WATER ACTIVITIES PARK METRO

SS ROTTERDAM

The cultural link is spreading from the Ketendrecht waterfront to the Tar- wewijk waterfront. Which is 324m wide. In the other direction, the harbor is 1,6km long starting from the metro line to SS Rotterdam ship. Urban acupuncture is excellent sitting in the urban landscape. The maximum height is 12m, which is not exceeding the closest buildings

LOCATION

(3)

URBAN ACUPUNCTURE

RIPPLE EFFECT

PHYSICAL EFFECT

Cultural link is urban acupuncture that changes the urban environment and connects the north and the southern districts of Rotterdam. It acts as a multifunctional park – square on the water which is serving as a physical connecting element between Tarvewijk and Katendrecht. It consists of in- habitant movement, dancers moves, waves, playfulness, and various activities. It is a merging and connecting element on the water. It will bring back the vibrant historical vibes that Rotterdam is known for but in a different and new exciting way. The urban acupuncture intervention’s ripple effect will excite and invite more people and connect the hearts.

Cultural link “Motion on the water” main function is a center for cultural performing arts with 500 indoor seats. Which includes vast public outdoor spaces for various activities. The link serves as a pedestrian and bicycle bridge for the city residents.

INTERVENTION

YOUNG PEOPLE ARE GATHERING

AND PRACTICING MUSIC SHELTERED PLACE FOR SPORT

ACTIVITIES ELDERLY PEOPLE ETHNICAL GROUPS

LAYERS

Connectivity – the link is connecting two districts Katendrecht and Tarwevijk. Bicycles and pedestrians are crossing the link at various levels. Extra small decks in the water are serving as stoping elements for private boats and yachts. The inner part of the intervention is accessible via integrated bridges.

Water activities - in summer include various activities. Starting from floating swimming pools for kids and adults with clean water to water skiing, wakeboard, and jetski. During the summer this part of the water square becomes the main activity during the day.

Comercial - In designated places are located commercial areas with a small shop, coffee places, restaurants, and rentable spaces for various events.

Cultural - main function is to invite the spectators to different types of indoor and outdoor performances. On the standard stage or outside on floating stages, that can be grouped and combined in the random and most inventive solutions. The enormous public space gives an extra op- portunity to have various outdoor concerts and even outdoor cinema evenings above the water.

As a cultural and artistic element, it has an innovative and attractive night landscape. Such an approach will also help to keep the place safer and more pleasant.

CONNECTIVITY

pedestrian bicycle carboat

COMERCIAL

caffe

restaurant venue place

equipment rental snack bar

healthy bar

RECREATION IN SUMMER

sitting area well-being fishing

CULTURAL

concerts cinema theater dancing

WATER ACTIVITIES - IN SUMMER

swimming pool yoga space fishing

water sports

KATENDRECHT KATENDRECHT

KATENDRECHT

KOP VAN ZUID KOP VAN ZUID

KOP VAN ZUID

TARWEWIJK TARWEWIJK

TARWEWIJK

CHARLOIS CHARLOIS

CHARLOIS

Sanita Krone Master of Architecture FHK MA+U Tilburg sanitakrone@gmail.com

SS Rotterdam

SS Rotterdam

SS Rotterdam

Conny Janssen Danst

Conny Janssen Danst

Conny Janssen Danst Maassilo

Maassilo

Maassilo

(4)

PROGRAM - FUNCTIONS - ATMOSPHERES

MULTIFUNCTIONAL SPACE

JETTY FLOATING OASIS

FLOATING STAGE

OUTDOOR SWIMMING POOL

OUTDOOR SWIMMING POOL

LATVIAN SUN SIGN

( meaning - eternal, movement)

FLOATING STAGES

MOORING ELEMENT

INFO CENTER/ CAFFE

PERFORMING ART CENTER Indoor space - 4726 m2

Teracces - 1660 m2 Indoor space - 306 mREHEARSING STUDIOS2

INFINITY WALK

(5)

DESIGN CONCEPT

WHAT IF?

TYPICAL

ONE BLACK BOX TINTED MULTIPLE TRANSPARENT BOXES

The art performance center is the heart of this interven- tion. This project has different look than the usual one.

What if the typical black box takes a different shape and is transparent? That helps to attract more people and to experience different emotions. It is part of the expe- rience when crossing this bridge to see how artists are performing and using the space. Be transparent, open, and inviting. It is part of the social invitation and equal possibilities for all citizens.

3 TRANSPARENT

1 CONNECTING DISTRICTS 2 CLIMATE 4 FLEXIBLE PERFORMANCE CONFIGURATIONS 5 FLEXIBLE STAGE LOCATIONS

traditional

desire for total flexibility

Cafe performance

Indoor performance

Floating performance On roof

Small performance space

the curved roofs in specifically designed areas can be

used as extra stages. Keeping in mind the proper dancing surface. The spectators can be on the decks and platforms or their boats.

the first-floor terrace can be used as a cafe area where dancers are dancing in between the coffee tables. Make in integrated and sensational experience.

can be used in various performance configurations with an open or closed-off main curtain. The main stage has a glass back wall which gives an unforgettable feeling and excitement, especially in late evening performances.

for fewer spectators and more intimate performance. Can be closed with the main curtain.

most intriguing and exciting. Floating stages can be

grouped in specific configurations. Spectators can be on the decks, on the first-floor terrace, or the boats. Chore- ographers dictate the location.

Proscenium Rain shelter

Few design objects provide shelter - under the pavilion, under the viewing platform, and the big wave

Sun shade

The object is well lit. Few design objects provide shadow from direct sunlight - un- der pavilion, viewing platform and the big wave

Wind

The curved and high wall is serving as a barrier to reduce the wind force and protect smaller buildings

Katendrecht

Tarwevijk

West wind

Thrust Arena Traverse Flat floor

Motion on the water is designed in a way that most of the elements are flexible and adjustable according to the choreographer or event. Always in motion. It applies to the indoor and outdoor elements.

Sanita Krone Master of Architecture FHK MA+U Tilburg sanitakrone@gmail.com

GREEN ROOF

HEIGHT 4M

LAMP GRID MIRRORS ON WALLS BALLET DOOR

DRESSING ROOMS

THE UNDERGROUND CONNEC- TION TO THE MAIN BUILDING ACOUSTIC CURTAINS

MOVABLE WALL FOR BIGGER EVENTS

(6)

Street level

0+ P

Level 1

2000+ P

Roof top

12000+ P

water level

-3000+ P

Level -1

-6500+ P

0 level

-2000+ P

312825156000

Upper terrace

5872+ P

372

Level -1

-6500+ P

10070

Floor finish

Screed layer/floor heating 70mm Insulation 100mm Water retaining foil

Concrete container 300mm

OSB 12mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm

12 140 9 41 300

300

Street level

0+ P

Level 1

2000+ P

Roof top

12000+ P

water level

-3000+ P

Level -1

-6500+ P

0 level

-2000+ P

4000

5959 5000

Upper terrace

5872+ P

3128372 412837240002966549

2556

Section 57 Section 57

Roller Metal angle profile

R= 150 Dock pile

520

520 Deck

planks- profiled

water

94

0 level

-2000+ P

Plaster board 12.5mm

OSB 18mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm

Aluminium window profile Deck planks- profiled

inside inside

outside

13 18140 9

40 300

Steel reinforced beams

Level 1

2000+ P

curtain wall Deck (recycled product) 47x200x3900mm

Steel reinforced beam 145x70x5000mm Waterproof membrane

Insulation 120mm Reinforced concrete slab 250mm Battens/ insulation 75x32mm Plasterboard 12.5mm

steel plate welded

metal tube 50mm RAL 9010

1000

A0 project

onderdeel

in opdracht van

project formaat getekend

gezien datum

Kantoor Groningen:

Poelestraat 44 9712 KC Groningen

Kantoor Delft:

Spoorsingel 23 2613 BE Delft

tel: 085-273 54 11 www.ucarchitects.com info@ucarchitects.com

"DNR 2011" "Standaardvoorwaarden 2011 Rechtsverhoudingen opdrachtgever-Architecten van Toepassing"

URBAN CLIMATE ARCHITECTS

schaal

tek.nr revisie wijzigingsdatum omschrijving van wijziging

Projectnaam

Opdrachtgever

Tekenaar Projectnummer

VO-203 Sections

1 : 200

Doorsnede A-A

1 : 10

guid pole

1 : 20

C-C - curtain wall and deck

SECTIONS

DESIGN PRINCIPLES

DETAIL 1

GUIDING POLE 1:10

SECTION A 1:200

DETAL 2

CURTAIN WALL AND DOCK 1:20

DETAIL 3

PRE-FABRICATED CONCRETE HULL 1:20

DETAIL 4

RAILING 1:20

1 2

3 4

1

Oasis cruise ship:

- lenght 360m - height 72m - draft 9,3m - width 66m - capacity 6296

Archimede’s buoyancy principle

2

Side float

Tinted acoustic- glass

colored scheme Composit deck

pre- fabricated

concrete hull oazes - recycled

pet recycled dock

float green roof CLT construction ballet floor acoustic curtains

fromflame retard- ant fabrics

blackout shade wooden floor curved edges

OUTDOOR

MATERIALS INDOOR

MATERIALS white tube

railings Sanita Krone

Master of Architecture FHK MA+U Tilburg sanitakrone@gmail.com

Street level 0+ P Level 1 2000+ P Roof top 12000+ P

water level -3000+ P

Level -1 -6500+ P 0 level -2000+ P Upper terrace 5872+ P

A0 project

onderdeel

in opdracht van

project formaat getekend

gezien datum

Kantoor Groningen:

Poelestraat 44 9712 KC Groningen

Kantoor Delft:

Spoorsingel 23 2613 BE Delft

tel: 085-273 54 11 www.ucarchitects.com info@ucarchitects.com

"DNR 2011" "Standaardvoorwaarden 2011 Rechtsverhoudingen opdrachtgever-Architecten van Toepassing"

URBAN CLIMATE ARCHITECTS

schaal

tek.nr revisie wijzigingsdatum omschrijving van wijziging

Projectnaam

Opdrachtgever

Tekenaar Projectnummer

VO-203 Sections

Roller Metal angle profile

R= 150 Dock pile

520

520 Deck

planks- profiled

water

94

Level 1

2000+ P

curtain wall Deck (recycled product) 47x200x3900mm

Steel reinforced beam 145x70x5000mm Waterproof membrane

Insulation 120mm Reinforced concrete slab 250mm Battens/ insulation 75x32mm Plasterboard 12.5mm

steel plate welded

metal tube 50mm RAL 9010

1000

Plaster board 12.5mm

OSB 18mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm inside

inside

outside

13 18140 9

40 300

Compositmaterial deck planks 47x200mm Steel reinforced composit beams 145mm Vapor barrier foil

Insulation 140mm

Concrete 150mm

Battens 40x40 40mm

Playwood 18mm

Plasterboard 12.5mm

Level -1

-6500+ P

10070

Floor finish

Screed layer/floor heating/ cooling 70mm Insulation 100mm Water retaining foil

Concrete container 300mm

OSB 12mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm

12 140 9 41 300

300

Street level

0+ P

Level 1

2000+ P

Roof top

12000+ P

water level

-3000+ P

Level -1

-6500+ P

0 level

-2000+ P

4000

4000

308859212573

A0 project

onderdeel

in opdracht van

project formaat getekend

gezien datum

Kantoor Groningen:

Poelestraat 44 9712 KC Groningen

Kantoor Delft:

Spoorsingel 23 2613 BE Delft

tel: 085-273 54 11 www.ucarchitects.com info@ucarchitects.com

"DNR 2011" "Standaardvoorwaarden 2011 Rechtsverhoudingen opdrachtgever-Architecten van Toepassing"

URBAN CLIMATE ARCHITECTS

schaal

tek.nr revisie wijzigingsdatum omschrijving van wijziging

Projectnaam

Opdrachtgever

Tekenaar Projectnummer

VO-211 AA- details

Roller Metal angle profile

R= 150 Dock pile

520

520 Deck

planks- profiled

water

94

Level 1

2000+ P

curtain wall Deck (recycled product) 47x200x3900mm

Steel reinforced beam 145x70x5000mm Waterproof membrane

Insulation 120mm Reinforced concrete slab 250mm Battens/ insulation 75x32mm Plasterboard 12.5mm

steel plate welded

metal tube 50mm RAL 9010

1000

Plaster board 12.5mm

OSB 18mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm inside

inside

outside

13 18140 9

40 300

Compositmaterial deck planks 47x200mm Steel reinforced composit beams 145mm Vapor barrier foil

Insulation 140mm

Concrete 150mm

Battens 40x40 40mm

Playwood 18mm

Plasterboard 12.5mm

Level -1

-6500+ P

10070

Floor finish

Screed layer/floor heating/ cooling 70mm Insulation 100mm Water retaining foil

Concrete container 300mm

OSB 12mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm

12 140 9 41 300

300

Street level

0+ P

Level 1

2000+ P

Roof top

12000+ P

water level

-3000+ P

Level -1

-6500+ P

0 level

-2000+ P

4000

4000

308859212573

A0 project

onderdeel

in opdracht van

project formaat getekend

gezien datum

Kantoor Groningen:

Poelestraat 44 9712 KC Groningen

Kantoor Delft:

Spoorsingel 23 2613 BE Delft

tel: 085-273 54 11 www.ucarchitects.com info@ucarchitects.com

"DNR 2011" "Standaardvoorwaarden 2011 Rechtsverhoudingen opdrachtgever-Architecten van Toepassing"

URBAN CLIMATE ARCHITECTS

schaal

tek.nr revisie wijzigingsdatum omschrijving van wijziging

Projectnaam

Opdrachtgever

Tekenaar Projectnummer

VO-211 AA- details

Roller Metal angle profile

R= 150 Dock pile

520

520 Deck

planks- profiled

water

94

Level 1

2000+ P

curtain wall Deck (recycled product) 47x200x3900mm

Steel reinforced beam 145x70x5000mm Waterproof membrane

Insulation 120mm Reinforced concrete slab 250mm Battens/ insulation 75x32mm Plasterboard 12.5mm

steel plate welded

metal tube 50mm RAL 9010

1000

Plaster board 12.5mm

OSB 18mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm inside

inside

outside

13 18140 9

40 300

Compositmaterial deck planks 47x200mm Steel reinforced composit beams 145mm Vapor barrier foil

Insulation 140mm

Concrete 150mm

Battens 40x40 40mm

Playwood 18mm

Plasterboard 12.5mm

Level -1

-6500+ P

10070

Floor finish

Screed layer/floor heating/ cooling 70mm Insulation 100mm Water retaining foil

Concrete container 300mm

OSB 12mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm

12 140 9 41 300

300

Street level

0+ P

Level 1

2000+ P

Roof top

12000+ P

water level

-3000+ P

Level -1

-6500+ P

0 level

-2000+ P

4000

4000

308859212573

A0 project

onderdeel

in opdracht van

project formaat getekend tek.nr

revisie wijzigingsdatum omschrijving van wijziging

Projectnaam

Opdrachtgever

Tekenaar Projectnummer

VO-211 AA- details

A1

project

onderdeel

in opdracht van

project formaat getekend

gezien datum

Kantoor Groningen: Poelestraat 44 9712 KC Groningen

Kantoor Delft: Spoorsingel 23 2613 BE Delft

tel: 085 -273 54 11 www.ucarchitects.com info@ucarchitects.com

"DNR 2011" "Standaardvoorwaarden 2011 Rechtsverhoudingen opdrachtgever -Architecten van Toepassing"

URBAN CLIMATE ARCHITECTS

schaal

tek.nr revisie wijzigingsdatum omschrijving van wijziging

Projectnaam

Opdrachtgever

Tekenaar Projectnummer

VO -210 Unnamed

E W

Double facade

The outer layer enhances the fa- cade’s acoustic performance, pro- tects the inner thermal facade, and ensures the functionality of the sun screening system independently

of weather conditions.

Prevailing West wind direction

Blinds and glass coating on the in- terior facade allow for controlling

direct sunlight and heat gain.

Natural ventilation air intake during the warm period. Ventilation grids above the doors/ behind

white railing tubes

The Maashaven water is used to cool the Per- formance Art center and all the other smaller buildings on the platform through active ceil- ings. Concerting pumps also make it possible

to use the system for heating.

Green roof for rain water

collectors Daylight control

Harbor water heating and cooling

Rainwater is used for sanitary pur- poses, irrigation of outside spaces

Water collection

(7)

Roller Metal angle profile

R= 150 Dock pile

520

520 Deck

planks- profiled

water

94

Level 1

2000+ P

curtain wall Deck (recycled product) 47x200x3900mm

Steel reinforced beam 145x70x5000mm Waterproof membrane

Insulation 120mm Reinforced concrete slab 250mm Battens/ insulation 75x32mm Plasterboard 12.5mm

steel plate welded

metal tube 50mm RAL 9010

1000

Plaster board 12.5mm

OSB 18mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm inside

inside

outside

13 18140 9

40 300

Compositmaterial deck planks 47x200mm Steel reinforced composit beams 145mm Vapor barrier foil

Insulation 140mm

Concrete 150mm

Battens 40x40 40mm

Playwood 18mm

Plasterboard 12.5mm

Level -1

-6500+ P

10070

Floor finish

Screed layer/floor heating/ cooling 70mm Insulation 100mm Water retaining foil

Concrete container 300mm

OSB 12mm

Vapor barrier foil

Insulation 140mm

Sheet material 9mm

Battens 40mm

Watterresistan layer

Concrete container 300mm

12 140 9 41 300

300

Street level

0+ P

Level 1

2000+ P

Roof top

12000+ P

water level

-3000+ P

Level -1

-6500+ P

0 level

-2000+ P

4000

4000

308859212573

A0 project

onderdeel

in opdracht van

project formaat getekend

gezien datum

Kantoor Groningen:

Poelestraat 44 9712 KC Groningen

Kantoor Delft:

Spoorsingel 23 2613 BE Delft

tel: 085-273 54 11 www.ucarchitects.com info@ucarchitects.com

"DNR 2011" "Standaardvoorwaarden 2011 Rechtsverhoudingen opdrachtgever-Architecten van Toepassing"

URBAN CLIMATE ARCHITECTS

schaal

tek.nr revisie wijzigingsdatum omschrijving van wijziging

Projectnaam

Opdrachtgever

Tekenaar Projectnummer

VO-211 AA- details

BUILD UP

LEVEL 0 1:200

Sanita Krone Master of Architecture FHK MA+U Tilburg sanitakrone@gmail.com

1 Stage operator 34m2 2 Rehearsal studio 74m2 3 Rehearsal studio 65m2 4 Green room 56m2 5 Lobby 46m2 6 Janitor 14m2 7 Men dressing room 35m2 8 Women dressing room 38m2 9 Technical space 20m2 10 Circulation 47m2 11 Scene dock 111m2 12 Stage 255m2 13 Auditorium 575m2 14 Side stage 31m2 15 Kitchen 29m2

16 Bar 12m2

17 Restaurant 240m2

18 Lobby 198m2

19 Ticket office 5m2 20 Cloakroom 47m2

21 Men WC 15m2

22 Miva WC 4m2 23 Women WC 17m2 24 Rehearsal studio 70m2 25 Rehearsal studio 59m2 26 Dressing room 18m2 27 Dressing room 18m2

28 Lobby 50m2

29 Venue space 158m2

30 Lobby 30m2

28 1

2

3

4

5

24

25

26

27

29

30 6

7 8

9 10

11

12

13

18 0.00 0.00

-1.00

19 23

21

17

20 15 16 14

LEVEL -1 LEVEL 1

FLOATING STAGES

FLOATING STAGES

FLOATING STAGES FLOATING STAGES

V E N U E PLACE ART PERFORMANCE CENTER

REHEARSAL STUDIO ballet floor

(for dancing)

composit deck

composit rein- forced beams

recycled dock float

COMPOSIT DOCK

FLEXBASE SURFACE

PRE-FABRICATED CONCRETE HULL

4x4m

327m

MAX 400 SEATING BENCH INTEGRATED

IN TUBE RAILINGS

MODULAR SUSTAINABLE SEAT - MOULDING RECYCLED PET

(8)

PHASES

PHASE 0

EXISTING SITUATION

WITH VENUES NEW PARK CREAT AXIS

WITH MOORING ELEMENTS CREAT LOOP CONNECTION

PHASE1 PHASE 2 PHASE 3

NAME NAME NAME

FUNDRAISING NIGHT ATMOSPHERE

PHASE 4 PHASE 5 PHASE 6

FLOATING STAGES FLOATING PARKS FLOATING HOUSING PROJECTS

AXIS AXIS

AXIS AXIS AXIS

NIGHT LIFE

The new park is an initiative from the gov- ernment to improve public space in this neighbrohood.

The night atmosphere brings different vibe and notions. The calming water and bright tint- ed glass create an unforgettable experience. As one moves through the passage, the light and shadows are changing.

“Motion on the water” is spectacular in magnificent intervention. It spans across the Maashaven and is great in its size. Nevertheless, this object would appreciate support and fundraising from private persons, organizations, and investors. There- fore there is an option to donate and support this creation. Each donator will have one’s name engraved on the dock plank. The result will give a personal touch, and people will feel like a part of the project.

Boundless harbor without public activities. Creat axis that is connecting 2 districts and is the starting point for the cultural loop.

The panoramic view allows one to expe- rience the site from a different viewing point.

By adding floating stages, the intervention

becomes more flexible and playful in its New floating parks are extensions of the newly developed park. The intervention is

Afbeelding

Updating...

Referenties

Updating...

Gerelateerde onderwerpen :