“Detector activities” after the IB upgrade

Michele Punturo

(2)

What we must do

• 0 priority:

– commissioning

• 1 priority:

– Items to be implemented

• Acoustic shielding in the laser lab

• Improvement of the cleanliness procedure in the towers

• New coil drivers

• … (MC LC windows?) …

– Items to be investigated:

• MC end mirror

– Better substrate – Heavier payload

• BS mirror

– Larger mirror

» Reduce scattered light

• Eddy current dissipation

• New electronics

• Thermal compensation & Phase camera

(3)

Virgo+ Activities

• New high power laser

– N. Mann

• FS monolithic suspension activities

– M.Punturo

(4)

Acoustic Shielding in the LL

• Reduce the cross talk between the acoustic channel and the dark fringe

• All the racks with fans displaced during the shutdown

• A coverage of the laser table and of the external injection bench is under design

– Two offers received:

• 30 k€

• 16 k€

– A third company contacted

• Offer in few days

– Implementation:

• End of winter, beginning of spring

• As soon as an executive design will be available it will be shown in a

detector meeting

(5)

Cleanliness improvement in the tower

• Wednesday, past week:

• When the NI problem occurred I prepared (16/04/2003) this list of rules:

– Keep the mirror clean

– Remove the dust particles through an ionized air jet after the integration and tuning procedures

– Inject, during the venting only dray air

– Warm up the mirror, to reduce the probability of condensation on it

• Some of them haven’t been respected

– Need to patch the problem now (cleaning intervention) – Need to solve the problem in the future

• Control of the moisture

• Ionized warm air flux (need of infrastructure upgrade, already indicated in

the urgent purchases in the October 2005 Detector Meeting in Naples)

(6)

Actuation Noise

G .L os ur do

(7)

New coil drivers

LCoil 3mH 1

2 RCoil 10

Ref. Mass Coil

+

- OUT

R2

R R1 R

Coil Driver

DAC 2

RN 500

DAC 1 Transconductance Amplifier

• Full production of new coil drivers in one year

– Prototypes already installed in the end towers (EM

contamination)

– Simplified solution in the input towers (switch+resistor)

– Simplified solution in the BS tower

• New coil drivers have been designed by INFN Pisa + EGO support to solve the actuation noise problem

– Two different sections

• High power section for lock acquisition

• Low noise section for linear regime

– The two sections are driven by two independent DACs

(8)

NEW end MC mirror

• The losses in the MC are 846 ppm (F.Bondu) instead of 115 ppm

• Defects and contamination in the curved MC mirror

• This mirror must be replaced

(9)

Small or large MC mirror?

• Two new small substrates have been sent to GS Lumonics (Raffaele, could you confirm?)

• The possibility to use a large substrate must be investigated

– Better control of the payload – “almost” standard geometry – Herasil substrate available

– Movement mechanics complicated

– Optics + Mechanics studies must be started now

(10)

New BS?

• Stray light is evident in the BS

IB

WA NI

wedge

• With the higher injected power the problem should be enhanced

– Larger BS needed

(11)

Eddy current FUTURE problem

• Virgo design

– M=0.017 A m

2

– Stainless Steel RM

• 

RM

=1.4×10

6

W

-1

m

-1

– Q

eddy

=1.8×10

8

• Current design

– M=0.05 A m

2

– Aluminum RM

• 

RM

=3.2×10

7

W

-1

m

-1

– Q

eddy

=9.4×10

5

Experimental test: (VIR-NOT-PER-1390-27 (1996), VIR-NOT-PER-1390-80 (1997), Rev.Sci.Instr. 69, 2777 (1998))

1 1 0 1 0 0 1 0 0 0

1 0 - 2 3 1 0 - 2 2 1 0 - 2 1 1 0 - 2 0 1 0 - 1 9 1 0 - 1 8

h(f) [1/sqrt(Hz)]

F r e q u e n c y [ H z ]

( a ) N o m i n a l V i r g o

( b ) C u r r e n t m a g n e t s M = 0 . 0 5 , A l R M ( c ) N o m i n a l m a g n e t s M = 0 . 0 1 7 , A l R M ( d ) M a g n e t s M = 0 . 0 0 5 , A l R M

(12)

Magnetic Field Now

mirror post magnet

Macor support

coil

steel support

A lu m in um R M

(13)

With Iron Hat

(14)

Test in Clean Room

0 1 2 3

0.2 0.4 0.6 0.8 1.0

B/ B

0

layers of 0.6mm Bmeas Model

Model (top larger)

(15)

Conclusions

• In parallel to the commissioning activities many “detector activities” are foreseen

(and many more are needed)

• Man power is an issue:

– Many persons are involved in both

commissioning and “detector”

Referenties

GERELATEERDE DOCUMENTEN

Ik kan mij voorstellen dat een dergelijke frustratie ook wordt gewekt bij amateur- archeologen (de zogenaamde coinhunters reken ik niet tot deze groep). Volgens Van der Zwaai, en

Bosma, The distribution and kinematics of neutral hydrogen in spiral galaxies of various morphological types (1978) (cit. Saha, Connecting CMB anisotropy and cold dark matter

Analyzing the problem of the detection of facade elements shows that many different classes of objects have to be detected (all main classes with their sub-categories) with a

For the signal, the zenith distribution at each WIMP mass is calculated with WimpSim and for the background the smoothened zenith distributions of the remaining simulated

To train the BDT in the high energy analysis to find upgoing neutrino-induced candidates generally (rather than straight vertical events specif- ically), an generic muon

Door het optellen van de drie reactievergelijkingen uit het tekstfragment is het mogelijk één vergelijking af te leiden voor het totale proces dat in de detector heeft

Omdat het maar om twee soorten gaat, zijn de vragen hierbij niet echt uitdagend en wordt er een moeilijke formule gegeven voor een eenvoudig probleem..

Descriptive characteristics of the studies (excluding the present study) included in the DRD4 48bp VNTR