Project Delivery Overview

Mark Loader

Chief Progam Management Officer RB Rail AS

Rail Baltica Online Forum 23 April 2020, Rīga

(2)

Alignment infrastructure

Fixed objects

Rail Systems

Testing

Overview of Project Construction Timeline

2019 2020 2021 2022 2023 2024 2025 2026

Procurement Construction Detailed Design

Preliminary Design Procurement

Design and build

Preliminary Design

Procurement

Installation

Testing

Commissioning

Alignment infrastructure

Fixed objects

Rail Systems

Testing

(3)

Alignment Detailed Design Completion Timeline

DTD complete by 2021, Quarter 1 Rapla – Pärnu

Ramygala - Kaunas

Q1 2021 Q1 2021

(4)

Q3 2021 July 2021

Q3 2021 Q3 2021

Alignment Detailed Design Completion Timeline

DTD complete by 2021, Quarter 3

Tallinn-Rapla

Vangaži – Misa Rīga section

Ramygala – to LT/LV border

(5)

Alignment Detailed Design Completion Timeline

Q2 2022 Q4 2022

Q2 2022

DTD complete by 2022, Quarter 4

Pärnu to EE/LV border Misa to LV/LT border Vangaži to LV/EE border

DTD for Kaunas – Lithuanian/Polish state border and Kaunas – Vilnius will commence after completion of special plan

(6)

Design Speed

249 km/h – passenger trains 120 km/h – freight trains

Standard Gauge

1435 mm

Double-track Electrified

2x25kV AC

Axle Load

25 t

Traffic Management

ERTMS 2

Max. Freight Train Length

1050 m

Tallinn

Pärnu

RIX Rīga

Panevėžys

Vilnius Kaunas

3 mainline design sections 2 passenger stations

4 mainline design sections 2 passenger stations

4 mainline design sections 3 passenger stations

ESTONIA

LATVIA LITHUANIA

1 multimodal terminal

1 multimodal terminal

1 multimodal terminal 213 km

265 km 392 km

Overview of Construction Scope

(7)

Work Progress on Rail

Baltica in Poland

(8)

Contracting Overview

Rail Systems

LGI Edzl

Communications Signalling

Overhead catenary system

Civil works Trackwork

Rolling stock**

• Signalling System

• Comms and SCADA

• ENE

Alignment

Fixed objects

• Construct only contracts

• Based on FIDIC Red Book

• Multiple packages

Contracting Approach Assets

Contracting Entities

RB Rail • Design and build

contracts

• Based on FIDIC Yellow book

• Centralised component sourcing

RB Estonia

• Embankments

• Bridges

• Viaducts

• Track

• Stations

• Depots

• Freight facilities

• Mix of contract types

• Based on FIDIC Red and Yellow Books RB Rail *

* RB Rail is responsible for cross border elements of alignment ** Rolling stock procurement is not part of the project scope

(9)

Short Term Plan - Estonia

Fixed objects:

Station design works commencing

Freight terminals design tenders in Q2/Q3 2020

Rolling stock and service depot design tenders Q2/Q3 2020 Dry ports study at Soodevahe – Q2 2020

Alignment infrastructure:

Main electrical crossing to be tendered Q1 2021

Gas pipeline reconstruction design construction tender – Q3 2020 Rail-road viaducts:

17 pcs on local roads –tenders Q3 2020- Q2 2021 9 pcs in municipalities’ roads – Tender Q2 2021

Green bridges Rapla-Pärnu: construction tenders for 5 pcs – Q2 2021

(10)

Short Term Plan - Latvia

Fixed objects:

Signing of Rīga airport section construction

contract - planned by end of 2020 (procurement in process)

Preparatory works for construction activities in Rīga Central Station Construction supervision services tender to be launched

Detailed technical design of multimodal terminal in Salaspils

Alignment infrastructure:

Additional Environmental impact

assessment services– Planning commenced

Central alignment section construction – initial package procurement to be launched Q4 2020

Study on railway network development in Riga node

(11)

Short Term Plan - Lithuania

Fixed objects:

Development of Kaunas Infrastructure maintenance facilities – special planning commenced

Works underway in Kaunas – Palemonas area

Alignment infrastructure:

Kaunas – LT/LV border section – Construction procurement commenced for 475m EUR of works

9 Lots planned for procurement 59 km of alignment

Key structures such as Neris bridge Includes track construction

(12)

Short Term Plan - Systems

Engineering services commencing for all rail systems including power systems, ERTMS, and communications systems

Independent checking and assurance services to be launched

Shadow operator being sourced to provide input

to design and construction

(13)

Infrastructure Works Contracting Options Under Consideration

Option Application

Fixed price, lump sum Clearly defined scope and risk, scope unlikely to change

Target price / re-measurable Greater risk sharing to reduce unnecessary risk premiums

Prime contractor Where benefits can be obtained from

grouping work packages together

(14)

Fixed Price Contracting

Estimated cost at tender Project overheads Company overheads

Profit

Fixed price

Risk margin

Tender stage

Payment of fixed price, no breakdown

Delivery stage

(15)

Target Price Contracting

Direct project costs Project Overheads Company Overheads

Profit

Payments

Pain Share

Estimated costs at tender Project Overheads Company Overheads

Profit

Estimated Cost

Fee

Bid Price

Actual Cost

Fee after pain share

A re-measurable contract approach where a target cost is set at bid stage, but contractor is reimbursed

actual cost, with any difference between target and actual cost being shared by reducing fee paid to

contractor

(16)

Prime Contractor Approach

Project Overheads Profit Fee

(at risk)

Prime contractor takes responsibility for delivering a group of work packages Generally packages are subcontracted through competitive bids

Contractor will «step in» to deliver when needed to ensure on time completion Contractors fee is at risk – normally around delivery dates and KPIs

Contractors

Estimated cost at tender Project Overheads Company Overheads

Profit Risk margin Prime

Contractor

Fixed price

Estimated cost at tender Project Overheads Company Overheads

Profit Risk margin

Estimated cost at tender Project Overheads Company Overheads

Profit Risk margin

(17)

FIDIC contract suite will be used as basis for contracting

FIDIC Suite of Contracts

Red Book Pink Book

Yellow Book Silver Book

Orange Book Gold Book Green Book Blue Book White Book

Conditions of contract for construction

Conditions of contract for design and build

Consultant services agreement

(18)

Conclusion

Rail Baltica project remains on plan for opening in 2026

Will shortly transition from the design phase to construction phase

Division of construction responsibilities is agreed upon and delivery plans are being developed

Major procurements and construction will commence over next 12 to18 months in all aspects of the project

Aim is to develop the best approaches to contracting – feedback is welcome on the options

presented

Referenties

GERELATEERDE DOCUMENTEN

Het vaststellen van deze structuurvisie was het startsein voor een aantal van de particuliere eigenaren om plannen te gaan maken voor hun kavel.. Vanwege de doelstelling

108 The special rehabilitation package can be read as a desperate attempt by a government that has not been able to find land to resettle oustees to show at least minimal

5 De aard van het productieproces is totaal nieuw voor onze organisatie 6 Het project past binnen de gebieden waarop wij expertise hebben 7 Het project past binnen de sporten

Subsequently, the designing chapter of this study will show an answer with regard to the manageable factors (service level, organization culture and

So, in the new performance evaluation tool, the amount of manufacturing overhead costs actually incurred by debinding is based on standard costs, meaning the number of

Furthermore, it is necessary to clearly define gatekeepers and their responsibili- ties for go/kill project decisions at each gate (Cooper & Edgett, 2012, p. Outcomes of the

The management of Company X suspects that their current costing model, used to calculate product prices based on their costs, does not represent the actual costs of products

1) Getting familiar with the tender process by reading tender documents, conversations with tender manager and take part of a proposal kick-off meeting. Simultaneously