Inbound
process Loading Painting Assembly Outbound
process Unloading
Unpainted parts
Painted parts Inspection
& repair Paint
Distribution
Industry 4.0
Test case for Scania Production Meppel Define Industry 4.0
opportunities into applications
Select relevant opportunities
Quantitative/qualitative scoring opportunties
Most promosing improvement
▪
1. Literature Review
Chapter 22. Current situation
Scania Production
Meppel
Chapter 33. Find opportunities with Industry
4.0
Chapter 34. Test case experiment
Chapter 4
5. Future Industry 4.0
plans
Chapter 5▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
PaaS
• Providers
• Consumers
IaaS
• Server(s) HaaS
• Machines
• Manufacturing process
• Sensors
SaaS
• ERP
• CAD
• FEA tools
▪
▪
▪
▪
▪
▪
▪
▪
F Robot
R11
Robot R12
Robot Robot R22
R21 Skid position
1630
Skid position 1650 Skid position
1640
Cabine 1 Cabine 2
Flash off
Skid
arrival Skid
leave
PLC T2CC RC T2CC R21
RC T2CC R11
RC T2CC R12
RC T2CC R22
PDA
Preventive Maintenance
policy
Imperfect
(IM) Age Based
(ABM)
Constant Interval
(CIM) Emergency
(EM)
Reactive Maintenance
(RM)
Reliability centred
(RCM) Condition
Based (CBM) Predictive
Proactive Maintenance
(PM)
Corrective (CM) SCOPE test case
1.Strategy mission,
vision
2.Goal Perfromance
indicators
3.Information demand/
problem 5.Technology
requirements, roadmap
4.Functions scenarios
External Influences Test case