a)

in the period I-XII 2017

In the period of twelve months of 2017 there were more dwellings completed than the year before. The number of dwellings for which permits have been granted or which have been registered with a construction project and the number of dwellings in which construction has begun also increased.

According to preliminary data, in the period January-December of 2017, 178258 dwellings were completed, i.e. by 9.1% more compared with 2016, in which an increase was recorded by 10.6%. In the period of twelve months of 2017 the number of dwellings for which building permits have been granted or which have been registered with a construction project amounted to 250218, i.e. by 18.3% more than in 2016 (when an increase was recorded by 12.0%). The number of dwellings in which construction has begun also increased to 205990, i.e. by 18.4% than the year before when an increase was recorded by 3.3%.

a) Residence data – subject to change upon developing quarterly reports

In the period January-December of 2017 private investors constructed 82679 dwellings (which constituted 46.4% of the total number of dwellings completed), i.e.

by 5.9% more than the year before, when a drop was recorded by 2.1%. Compared to January-December of 2016, within this group of investors an increase was recorded in the number of dwellings for which building permits have been granted or which have been registered with a construction project - to 114905 dwellings, i.e. by 16.6%

against an increase the year before by 12.6%. The number of dwellings in which construction has begun also increased to 94483 dwellings, i.e. by 13.0% (when an increase was recorded by 6.0%).

(2)

Developers, in the period of twelve months of 2017, completed 89817 dwellings (which constituted 50.4% of the total number of dwellings completed), i.e.

by 13.5% more than in 2016, when an increase was recorded by 26.8%. Investors who build for sale or rent received building permits for 128484 dwellings, i.e. by 20.5%

more than the year before (when an increase was recorded by 9.7%). The number of dwellings in which construction has begun also increased to 105401 dwellings, i.e. by 23.3% (against a decrease by 1.2% the year before).

Housing cooperatives in the period of twelve months of 2017 completed less dwellings than the year before (2376 against 2707). The number of dwellings for which building permits have been granted also decreased to 1619 against 1750 dwellings the year before. The number of dwellings in which construction has begun increased to 2746 against 2187 dwellings the year before.

Other investors (municipal, public building society and company construction) in the period of twelve months of 2017 completed 3386 dwellings against 3396 dwellings the year before, of which in municipal construction - 1760 dwellings were completed against 1746 dwellings last year, in public building society construction – 1484 dwellings (1340 the year before) and in company construction – 142 dwellings (310 dwellings the year before). The number of dwellings for which building permits have been granted increased to 5210 against 4601 dwellings the year before and the number of dwellings in which construction has begun increased to 3360 (against 2668).

In the period of twelve months of 2017, an increase in the number of dwellings completed was recorded in all voivodships, including the most substantial one in Kujawsko-Pomorskie – by 23.1% (7710 dwellings), Pomorskie - by 20.1%

(15797) and Lubuskie – by 16,3% (4166). There were 37100 dwellings completed (36049 the year before) in Mazowieckie voivodship.

In the period of twelve months of 2017, an increase in the number of dwellings for which permits have been granted or which have been registered with a construction project was recorded in fourteen voivodships, of which the highest in Zachodniopomorskie - to 12643 dwellings (8351 the year before), Kujawsko- Pomorskie – to 11176 dwellings (8012 the year before) and Śląskie – to 19640 dwellings (14963 the year before) A decrease in the number of permits or registrations with a construction project was recorded in two voivodships: Świętokrzyskie – by 3.2% and Opolskie – by 4.6%. There were 50936 dwellings for which permits have been granted or which have been registered with a construction project in Mazowieckie voivodship i.e. by 20.9% more than the year before.

An increase in the number of dwellings in which construction has begun in January-December of 2017 was noticed in all voivodships, of which the highest in Wielkopolskie - to 26484 dwellings (18338 the year before), Opolskie - to 2599 dwellings (2025 the year before) and Zachodniopomorskie – to 8469 dwellings (6723 the year before). There were 43243 dwellings in which construction has begun (38588 the year before) in Mazowieckie voivodship.

(3)

2017

Forms XII I– XII

of construction

number XII 2016=100

XI

2017 = 100 number I – XII 2016 =100

Dwellings completed

Total ... 20775 114.7 118.1 178258 109.1

Private……… 9389 109.6 131.6 82679 105.9

For sale or rent……… ….………. 10664 118.7 107.9 89817 113.5 Cooperative.…….……..…………. 377 135.1 nearly 3-fold 2376 87.8

Restb) ... 345 119.8 78.9 3386 99.7 Dwellings in which construction has begun

Total ... 12193 99,9 73.1 205990 118.4

Private……… 3916 87.8 68.1 94483 113.0

For sale or rent ….………. 7846 106.2 76.6 105401 123.3 Cooperative.…….……..…………. 236 nearly 2-fold 120.4 2746 125.6

Restb) ... 195 89.9 40.2 3360 125.9 Dwellings for which permits have been granted or which have been registered with a

construction project

Total ... 19225 89.3 108.2 250218 118.3

Private……… 8222 99.8 94.8 114905 116.6

For sale or rent ….………. 10439 82.9 124.7 128484 120.5

Cooperative. …….……..…………. 193 85.0 91.9 1619 92.5

Restb) ... 371 77.8 71.6 5210 113.2 b) company, municipal, public building society.

(4)
(5)

Referenties

GERELATEERDE DOCUMENTEN

A simultaneous approach for calibrating Rate Based Models of packed distillation columns based on multiple experiments, Chemical Engineering Science, 104, 228–232.. The

7 a: For both the SC- and KS-informed hybrid ground-truth data, the number of hybrid single-unit spike trains that are recovered by the different spike sorting algorithms is shown..

Objective The objective of the project was to accompany and support 250 victims of crime during meetings with the perpetrators in the fifteen-month pilot period, spread over

I envisioned the wizened members of an austere Academy twice putting forward my name, twice extolling my virtues, twice casting their votes, and twice electing me with

For the manipulation of Domain Importance we expected that in more important domains (compared to the control condition) participants would feel more envy, but also engage

term l3kernel The LaTeX Project. tex l3kernel The

The decision maker will thus feel less regret about an unfavorable investment (the obtained out- come is worse than the forgone one) that is above ex- pectations than when that

Lasse Lindekilde, Stefan Malthaner, and Francis O’Connor, “Embedded and Peripheral: Rela- tional Patterns of Lone Actor Radicalization” (Forthcoming); Stefan Malthaner et al.,