• No results found

Agenda ACP 04-10-2013

N/A
N/A
Protected

Academic year: 2021

Share "Agenda ACP 04-10-2013"

Copied!
1
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

Pagina 1 van 1 College voor zorgverzekeringen Pakket Eekholt 4 1112 XH Diemen Postbus 320 1110 AH Diemen www.cvz.nl info@cvz.nl T +31 (0)20 797 89 59 Contactpersoon mw. drs. J. Zwaap T +31 (0)20 797 88 08 Datum 23 september 2013 Onze referentie 2013112653 ACP 41

Openbare vergadering Adviescommissie pakket

Vergaderdatum en -tijd 4 oktober 2013 van 10.00 tot 13.00 uur Vergaderplaats Vergaderzaal Kentaurus, CVZ, Diemen

1 Opening en mededelingen

1.1 Mededelingen

1.2 Conflicterende belangen

10.00 uur

2 Gepast gebruik implantaatgedragen

gebitsprothesen Toelichting: Erwin Abbink

10.10 uur ACP 41/2

3 Ter vaststelling advies:

Functiegerichte omschrijving van hulpmiddelen gericht op stoornissen in het bewustzijn

Toelichting: Johan de Wit

10.30 uur ACP 41/3

4 Ter vaststelling advies:

Uitvoeringstoets overheveling intramurale langdurige GGZ Toelichting: Sandra Reus

11.00 uur ACP 41/4

Referenties

GERELATEERDE DOCUMENTEN

Archive for Contemporary Affairs University of the Free State

The South African National Council of Child Welfare’s slogan of child welfare “irrespective of race or class, of politics or creed” used – as this thesis has shown

It is suggested that the value chain can be used to assist public relations in overcoming its uncertain position in the ethics debacle by firstly placing it firmly in the

• Number of thoracic operations performed by non-thoracic surgeons • Number of cases seen by diagnostic codes • Review published literature by thoracic surgeons • List papers

In December 2014, upon President Sissi’s visit to China, the two countries signed a Comprehensive Strategic Partnership Agreement alongside a MoU between

Three procedures are presented here: the Institutional Audit (which involved a survey and in-depth interviews); the CHESP/Monitoring Evaluation Research Programme (MERP) process

In order to address Africa’s energy need, it is important to also engage with China’s international renewable energy sector.. To achieve access to renewable energy

Given the cost overruns and time delays on the stadia projects, this research aims to (i) investigate the general factors that cause cost overruns and time delays on