• No results found

The energy infrastructure of the 21st century

N/A
N/A
Protected

Academic year: 2021

Share "The energy infrastructure of the 21st century"

Copied!
23
0
0

Bezig met laden.... (Bekijk nu de volledige tekst)

Hele tekst

(1)

The Energy Infrastructure of the

21

st

century

Jeroen van den Berg

Hanze University Groningen, The

Netherlands

(2)
(3)
(4)
(5)
(6)
(7)

Energy Valley Region

5.500 MWe central power production (25% of Dutch capacity)

In the middle of the European gas grid (annually transport 125 bcm)

On top of Dutch gas reserves (1.500 bcm)

International key players

Upcoming sustainable energy sector

Strong knowledge fundament

> 400 energy businesses; > 25.000 jobs

(8)

Shift in Energy Market

New developments in the market

- Consumers become active stakeholders

- Decentralized technology development

- New economic activity – especially SME

(9)

central power

people in power

central grid

flexible grid

smart grid

(10)

High voltage grid

Power stations Wind farms

Natural gas transmission

Natural gas power station

Syngas in transmission

?

Streat with solar cells

Solar

Windmill

Micro chp Mini Capstone

Small digester

District heating Room heating

Kitchen in restaurant Bath Drying process Large chp Hub Biogas Local grid Communicating chp’s

Macro Meso Micro

Macro Meso Micro

Electricity

(Natural) Gas

Heat

(11)

Links in the Energy Chain

Smart Energy Grid

d

e

m

a

n

d

su p p ly

(12)

PROGRAMMES

•Flexiness

•Flexigas

•Flexiheat

(13)

Flexigas Programme as an

illustration

(14)

n

at

u

ra

l g

a

s

conversion

“Slochteren” quality

(15)

GREEN GAS

€ € !

€ !

B

IO

G

A

S

N

A

T

U

R

A

L

G

A

S

conversion

Injection

“Slochteren” quality

(16)

F L E X I G A S

GREEN GAS

B

IO

G

A

S

vergisting

stuurbaar ?

conversie

eenvoudiger ?

virtuele

pijplijn ?

breedband

brander ?

Field tests

!

smart biogas grid

!

N

A

T

U

R

A

L

G

A

S

(17)

Bottom up approach

Uniformity

Le

ve

l

M

ic

ro

M

e

so

M

ac

ro

Low Medium High

Farmer

Hub

(18)

Commercial

Research

& Development

Flexigas – an innovation network

Production

Infrastructure

Quality Conversion

Infrastructure

Consumption

Cartesius Institute

Hanze University Groningen

TNO

State University Groningen

Hanze University Groningen

Hanze University Groningen

State University Groningen

Hanze University Groningen

Hanze University Groningen

ENKI

Proces Groningen

BioBench

KEMA

DMT

TSE

Clean Miles

SES

CROB

RENDO

ENECO

SIT controls

Bekaert

(19)

Projects in Flexigas Programme

Development: - Fermentation principle - Fermentation process control - Biogas upgrading - ‘Virtual pipeline’ - Broad range burners - ‘Smart grid’

(20)
(21)

Flexigas Programme – illustrates

• Content: utilizing market opportunities

• Process: ‘open’ co-innovation network

• Education: student integral to innovation

process

(22)

Energy Valley

In the middle of European gas grid

(annual transport 125 bcm)

On top of Dutch gas reserves

(1.500 bcm)

> 400 energy companies; >

25,000 jobs

> €20 billion investment

(350 projects)

(23)

Referenties

GERELATEERDE DOCUMENTEN

Po sit ive Partner’s importance External turbulence Technology transfer (M5) Firm’s management involvement (M4) Multiple input Partner’s importance Technological motives

open innovation principle economics of open innovation open innovation in different stages process archetypes of open innovation levels for using business models business model

– Secure young brains being able to work on these new value chains • At Hanze University of Applied Sciences, together with partners from. industry and society we co-created En Tran

Based on the construct of social and technical innovation, a quantitative analysis of reciprocal relations followed in Study 3 (Subsection 1.3), while Study 4 offered a

This thesis investigates the strategies that Dubai and Phoenix employ to mitigate the urban heat island effect. The aim of the thesis is to assess whether Groningen might be able

Moreover, from four channels mentioned by Spence (1994), there are only two channels used by the central government in communicating the PNPM-PISEW, those are government

Nevertheless, there has not been executed a systematic literature review on specific application opportunities for data-driven decision making alongside the entire

During the IPQ market parties are challenged to find innovations for quay wall renewal. As the scope of an innovative procurement process might be hard to determine, the